ABC Method..
ABC Method..
Learning Objectives
Concept of Activity Based Costing (ABC)
Significant Terms: Cost Objectives, Activities, Cost
Pool and Cost Drivers
Steps Involved in ABC
Use of Activity Based Information
Activity Based Costing Vs. Trading Costing
Solved Practical Problem
Practice Questions with Answer
2
Traditional Method of Absorption
In traditional method of overhead absorption, a
general or blanket rate is used, which is volume
based. For example:
Factory overheads as a on direct
percentage material/direct labour or
prime cost,
Labour hour rate or machine hour rate.
3
Activity Based Costing (ABC)
According to Cooper and Kalpan, “ABC (Activity based costing)
system calculate the costs of individual activities and assign costs
to cost objects such as products and services on the basis of
activities undertaken to produce each product or service.”
5
Examples of Activity Cost Drivers
For purchase of materials: number of purchase
orders, number of receipts of materials, number of
inspections.
For setting-up of machines: number of set-ups or
number of set-up hour
For production activity: machine hours or labour
hour
For repairs and maintenance activity: Number of
service calls, time spent in repairs and maintenance.
6
Steps Involved in ABC
Identify significant activities
Calculate the total cost of each activity (i.e. cost pool)
Determine the appropriate activity cost driver for each
activity
Calculate the activity cost driver rate:
8
Activity Based Costing Vs Traditional Costing
10
Solution:
Total Overheads = 5,50,000 + 8,20,000 + 6,18,000 =
19,88,000
Total Machine Hours = 20,000 + 120,000 = 1,40,000
Total Number of Purchase Orders = 160 + 384 =
544 Total Number of Set-ups = 20 + 44 = 64
1. Traditional Method of charging Overheads
𝑇𝑜𝑡𝑎𝑙 𝐴 𝑛 𝑛 𝑢 𝑎 𝑙
Machine Hour Rate (General) 𝑂𝑣𝑒𝑟ℎ𝑒𝑎𝑑𝑠
𝑇𝑜𝑡𝑎𝑙 𝑀𝑎 𝑐ℎ𝑖𝑛𝑒
= 19,88,000 𝐻𝑜𝑢𝑟𝑠
= = 14.20 per hour
1,40,000
11
Solution:
Total Overheads = 5,50,000 + 8,20,000 + 6,18,000 = 19,88,000
Total Machine Hours = 20,000 + 120,000 = 1,40,000
Total Number of Purchase Orders = 160 + 384 = 544
Total Number of Set-ups = 20 + 44 = 64
1. Traditional Method of charging Overheads
𝑇𝑜𝑡𝑎𝑙 𝐴 𝑛 𝑛 𝑢 𝑎 𝑙 𝑂𝑣𝑒𝑟ℎ𝑒𝑎𝑑𝑠 19,88,000
Machine Hour Rate (General) = = =
𝑇𝑜𝑡𝑎𝑙 𝑀 𝑎 𝑐 ℎ𝑖 𝑛 𝑒 𝐻 𝑜 𝑢 𝑟 𝑠
1,40,000
14.20 per hour
2. Activity Based Costing
(a) For Volume related Costs, Machine Hour Rate
𝑇𝑜𝑡𝑎𝑙 𝐴 𝑛 𝑛 𝑢 𝑎 𝑙 𝑂𝑣𝑒𝑟ℎ𝑒𝑎𝑑𝑠 𝑓𝑜𝑟 𝑣 𝑜 𝑙 𝑢 𝑚 𝑒 𝑟𝑒𝑙𝑎𝑡𝑒𝑑 𝑐𝑜𝑠𝑡𝑠 5,50,000
= = = 3.93 per hour
𝑇𝑜𝑡𝑎𝑙 𝑀 𝑎 𝑐 ℎ𝑖 𝑛 𝑒 𝐻 𝑜 𝑢 𝑟 𝑠 1,40,000
(b) For set-up related Costs, Set-up Rate
𝑇𝑜𝑡𝑎𝑙 𝐴 𝑛 𝑛 𝑢 𝑎 𝑙 𝑂𝑣𝑒𝑟ℎ𝑒𝑎𝑑𝑠 𝑓𝑜𝑟 𝑠𝑒𝑡−𝑢𝑝 𝑟𝑒𝑙𝑎𝑡𝑒𝑑 𝑐𝑜𝑠𝑡𝑠 8,20,000
= = =
𝑇𝑜𝑡𝑎𝑙 𝑛 𝑢 𝑚 𝑏 𝑒 𝑟 𝑜 𝑓 𝑠𝑒𝑡−𝑢𝑝𝑠 64 12
(c) For purchase related Costs, Overheads per purchase
order
𝑇𝑜𝑡𝑎𝑙 𝐴 𝑛 𝑛 𝑢 𝑎 𝑙 𝑂𝑣𝑒𝑟ℎ𝑒𝑎𝑑𝑠 𝑓𝑜𝑟 𝑝𝑢𝑟𝑐ℎ𝑎𝑠𝑒 𝑟𝑒𝑙𝑎𝑡𝑒𝑑 𝑐𝑜𝑠𝑡𝑠
=
6,18,000
𝑇𝑜𝑡𝑎𝑙 𝑛 𝑢 𝑚 𝑏 𝑒 𝑟 𝑜 𝑓 𝑝𝑢𝑟𝑐ℎ𝑎𝑠𝑒 𝑜𝑟𝑑𝑒𝑟𝑠
= 544
= 1,136.03 per order
13
B) Statement of Overhead Cost Per Unit (Activity Based Costing
Method)
Product and Overheads Costs Overhead cost
Annual Output per unit
A (5,000 units) Cost related to Volume 20,000 x 3.93
activities = 78,600
Cost related to Purchases 160 x 1,136.03
= 1,81,765
Cost related to set-ups 20 x 12,812.5
= 2,56,250
Total Overheads Costs 5,16,615 5,16,615/5,000
= 103.32
B (60,000 units) Cost related to Volume 1,20,000 x 3.93
activities = 4,71,600
Cost related to Purchases 384 x 1,136.03
= 4,36,236
Cost related to set-ups 44 x 12,812.5
= 5,63,750
Total Overheads Costs 14,71,586 14,71,586/60,000
= 24.53
14
DU B. Com. (H) 2012
A company manufactures two products A and B using common
facilities. the following cost data for a month are presented to
you:Product Units Direct Machine Set-ups of Orders
Labour Hours
produced Hours per per machines
unit unit
A 1,000 2 6 15 18
B 2,000 3 1.5 50 70
15
DU B. Com. (H) 2012 – Detailed Answer
(a) For machine related Costs, Machine Hour Rate
𝑇𝑜𝑡𝑎𝑙 𝑂𝑣𝑒𝑟ℎ𝑒𝑎𝑑𝑠 𝑓𝑜𝑟 𝑚 𝑎 𝑐 ℎ𝑖 𝑛 𝑒 𝑟𝑒𝑙𝑎𝑡𝑒𝑑 𝑐𝑜𝑠𝑡𝑠 3,00,000
= = = 33.33 per hour
𝑇𝑜𝑡𝑎𝑙 𝑀 𝑎 𝑐 ℎ𝑖 𝑛 𝑒 𝐻 𝑜 𝑢 𝑟 𝑠 9,000
(b) For set-up related Costs, Set-up Rate
𝑇𝑜𝑡𝑎𝑙 𝑂𝑣𝑒𝑟ℎ𝑒𝑎𝑑𝑠 𝑓𝑜𝑟 𝑠𝑒𝑡−𝑢𝑝 𝑟𝑒𝑙𝑎𝑡𝑒𝑑 𝑐𝑜𝑠𝑡𝑠 30,000
= = = 461.54 per set-up
𝑇𝑜𝑡𝑎𝑙 𝑛 𝑢 𝑚 𝑏 𝑒 𝑟 𝑜 𝑓 𝑠𝑒𝑡−𝑢𝑝𝑠 65
(c) For order related Costs, Overheads per order
𝑇𝑜𝑡𝑎𝑙 𝑂𝑣𝑒𝑟ℎ𝑒𝑎𝑑𝑠 𝑓𝑜𝑟 𝑜𝑟𝑑𝑒𝑟 𝑟𝑒𝑙𝑎𝑡𝑒𝑑 𝑐𝑜𝑠𝑡𝑠 35,000
= = = 397.73 per order
𝑇𝑜𝑡𝑎𝑙 𝑛 𝑢 𝑚 𝑏 𝑒 𝑟 𝑜 𝑓 𝑜𝑟𝑑𝑒𝑟𝑠 88
(d) Overhead cost per unit (Product A) = 214.08 (200+6.92+7.16)
(e) Overhead cost per unit (Product B) = 75.46 (50+11.54+13.92)
16
DU B. Com. (H) 2011
Major Limited manufactures two products a and b. the product is low
volume atom and its sales are only 5,000 units per annum. the product B is a
high volume item and sales are 20,000 units per annum. both products
required to direct labour hours for completion. the company works 50,000
direct labour hours each year as given below:
Poduct A : 5000 units x 2 hours = 10,000 hours
Product B: 20,000 x 2 hours = 40,000 hours
Details of cost for material and labour for each product (per unit) are
given below:
Direct materials: Product A – 25 and Product B – 15
Direct labour @ 5 per hour : Product A – 10 and Product B – 10
The company's total manufacturing overhead costs are 8,75,000 per annum.
The company has analysed its operations and has determined the five
activities act as cost drivers in the incurrence of overhead costs. Data relating
to the five activities are as follows:
17
DU B. Com. (H) 2011 (Continued)
A company manufactures two products A and B using common facilities. the
following cost data for a month are presented to you:
Activity Traceable Number of events or transactions
costs ()
Total Product A Product B
Machine set-ups 2,30,000 5,000 3,000 2,000
Quality Inspections 1,60,000 8,000 5,000 3,000
Production Orders 81,000 600 200 400
Machine hours worked 3,14,000 40,000 12,000 28,000
Materials Receipts 90,000 750 150 600
Total 8,75,000
You are required to computer per unit cost for each product using (i) direct
labour hour rate method for absorption of overhead cost and (ii) activity
based costing technique for absorption of overhead cost comment on your
results.
18
DU B. Com. (H) 2011 – Detailed Answer
(1) Computation of product cost using direct labour hour
rate 8,75,000
=
𝑇𝑜𝑡𝑎𝑙 𝑚 𝑎 𝑛 𝑢 𝑓 𝑎 𝑐 𝑡 𝑢 𝑟 𝑖 𝑛 𝑔
𝑇𝑜𝑡𝑎𝑙 𝐷𝑖𝑟𝑒𝑐𝑡 𝐿 𝑎 𝑏 𝑜 𝑢 𝑟 𝐻 𝑜 𝑢 𝑟 𝑠
= 50,000
= 17.50 per hour
𝑂𝑣𝑒𝑟ℎ𝑒𝑎𝑑𝑠
Product cost per unit (Product A) = 70 (DM 25+DL 10 + Overheads
35) Product cost per unit (Product B) = 60 (DM 15+DL 10 +
Overheads 35)
(2) Computation of product cost using ABC
(i) Cost per set-up = 46
(ii) Cost per inspection = 20
(iii) Cost per production order = 135
(iv) Cost per machine hour worked = 7.85
(v) Cost per material receipt = 120
Overhead cost per Unit = Product A – 75.44 and Product B – 24.89
Product cost per unit (A) = 110.44 (DM 25+DL 10 + Overheads
75.44) Product cost per unit (B) = 49.89 (DM 15+DL 10 + Overheads
19
24.89)
THANKS
20