Project Managemen T: Lesson 14 Pricing and Estimates Lesson 15 Cost Controls
Project Managemen T: Lesson 14 Pricing and Estimates Lesson 15 Cost Controls
MANAGEMEN
T
Lesson 14 Pricing and Estimates
Lesson 15 Cost Controls
PROJECT MANAGEMENT
Lesson 13 Lesson 14
Pricing and Estimating Cost Control
With the complexities involved, it is not surprising that many business
managers consider pricing an art. Having information on customer cost
budgets and competitive pricing would certainly help. However, the
reality is that whatever information is available to one bidder is
generally available to the others.
Estimates are not blind luck. They are well-thought-out
decisions based on either the best available information, some
type of cost estimating relationship, or some type of cost
model. Cost estimating relationships (CERs) are generally the
output of cost models.
Typical CERs might be:
● Cost–quantity relationships such as learning curves
● Cost–cost relationships
● Cost–non cost relationships based on physical
characteristics, technical parameters, or performance
characteristics
GLOBAL PRICING STRATEGIES
Specific pricing strategies must be developed for each individual
situation. Frequently, however, one of two situations prevails when one
is pursuing project acquisitions competitively. First, the new business
opportunity may be a one-of-a-kind program with little or no follow-
on potential, a situation classified as type I acquisition. Second, the
new business opportunity may be an entry point to a larger follow-on
or repeat business, or may represent a planned penetration into a new
market. This acquisition is classified as type II.
TYPE OF ESTIMATES
Projects can range from a feasibility study, through
modification of existing facilities, to complete design,
procurement, and construction of a large complex. Whatever
the project may be, whether large or small, the estimate and
type of information desired may differ radically.
TYPE OF ESTIMATES
The first type of estimate is an order-of-magnitude analysis,
which is made without any detailed engineering data. The
order-of-magnitude analysis may have an accuracy of 35
percent within the scope of the project. This type of estimate
may use past experience (not necessarily similar), scale
factors, parametric curves, or capacity estimates (i.e., $/# of
product or $/kW electricity).
TYPE OF ESTIMATES
Next, there is the approximate estimate (or top-down estimate), which
is also made without detailed engineering data, and may be accurate to
15 percent. This type of estimate is prorated from previous projects
that are similar in scope and capacity, and may be titled as estimating
by analogy, parametric curves, rule of thumb, and indexed cost of
similar activities adjusted for capacity and technology. In such a case,
the estimator may say that this activity is 50 percent more difficult
than a previous (i.e., reference) activity and requires 50 percent more
time, man-hours, dollars, materials, and so on.
TYPE OF ESTIMATES
● The project plan, schedule, and budget prepared during the planning
phase
● A detailed comparison between resources expended to date and those
predetermined. This includes an estimate of the work remaining and the
impact on activity completion.
● A projection of resources to be expended through program completion
These reports, supplied to the managers and the doers, provide three useful results: