Mepfs - Ts Report: The Flats Sacred Heart

The document provides status updates on the mechanical, plumbing, fire protection, and electrical (MEPFS) works at The Flats Sacred Heart building. It includes summaries of progress made and works still ongoing on various floors, as well as photos documenting installation of toilet exhaust ducts. A schedule of upcoming works in the next three weeks and status of delivered and pending panel boards and switchboards is also presented.

Uploaded by

Jason Salazar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
28 views

Mepfs - Ts Report: The Flats Sacred Heart

The document provides status updates on the mechanical, plumbing, fire protection, and electrical (MEPFS) works at The Flats Sacred Heart building. It includes summaries of progress made and works still ongoing on various floors, as well as photos documenting installation of toilet exhaust ducts. A schedule of upcoming works in the next three weeks and status of delivered and pending panel boards and switchboards is also presented.

Uploaded by

Jason Salazar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
You are on page 1/ 68

MEPFS – TS REPORT

The Flats Sacred Heart


APRIL 28, 2020
PROGRAM AND PLANNING
STRUCTURAL ALLIGNED – MECHANICAL WORK

Ground Floor Second Floor Third Floor

Fourth Floor Fifth Floor Roof Deck

LEGEND :
Completed

On going MEPFS Works

On going Structural Works


PROGRAM AND PLANNING
ARCHITECTURAL ALLIGNED - MECHANICAL WORK
KEYPLAN MONITORING
SECOND FLOOR LEVEL

LEGEND :

04 Completed
With Balance MEPFS Works
03 05 No Architectural Wall Installed
Not yet started MEPFS Works

02 06

01
23 22 21 20 19 18

07 08 09 10 11 12 14 15 16 17

Activities:
1. Installation of TEAD
-Balance Piping to T&B , still no partition
PROGRAM AND PLANNING
ARCHITECTURAL ALLIGNED - MECHANICAL WORK
KEYPLAN MONITORING
THIRD FLOOR LEVEL

LEGEND :

04 Completed
With Balance MEPFS Works
03 05 No Architectural Wall Installed
Not yet started MEPFS Works

02 06

01
23 22 21 20 19 18

07 08 09 10 11 12 14 15 16 17

Activities:
1. Installation of TEAD
-Balance Piping to T&B, still no partition
PROGRAM AND PLANNING
ARCHITECTURAL ALLIGNED - MECHANICAL WORK
KEYPLAN MONITORING
FOURTH FLOOR LEVEL

LEGEND :

04 Completed
With Balance MEPFS Works
03 05 No Architectural Wall Installed
Not yet started MEPFS Works

02 06

01
23 22 21 20 19 18

07 08 09 10 11 12 14 15 16 17

Activities:
1. Installation of TEAD
PROGRAM AND PLANNING
ARCHITECTURAL ALLIGNED - MECHANICAL WORK
KEYPLAN MONITORING
FIFTH FLOOR LEVEL

LEGEND :

04 Completed
With Balance MEPFS Works
03 05 No Architectural Wall Installed
Not yet started MEPFS Works

02 06

01
23 22 21 20 19 18

07 08 09 10 11 12 14 15 16 17

Activities:
1. Installation of TEAD. Area still not workable
PROGRAM AND PLANNING
LIGHT TESTING- MECHANICAL WORK

Activities:
1. Light Testing of installed TEAD
MEPFS WORKS
MECHANICAL WORK
THREE WEEKS LOOK AHEAD SCHEDULE
PROJECT NAME: THE FLATS SACRED HEART
LOCATION: SACRED HEART ST. COR. DAO ST. BRGY SAN ANTONIO, MAKATI CITY
SUBJECT: THREE WEEKS LOOK AHEAD SCHEDULE
MEPFS WORKS
PROGRESS PHOTOS
LOCATION : Second Floor Level – Zone 1

KEYPLAN MONITORING

4 3
1 2
2 1

1. Installed Toilet Exhaust Air Duct

3 4
MEPFS WORKS
PROGRESS PHOTOS
LOCATION : Second Floor Level – Zone 2

KEYPLAN MONITORING

3
2
1

1 2
4

1. Installed Toilet Exhaust Air Duct

3 4
MEPFS WORKS
PROGRESS PHOTOS
LOCATION : Third Floor Level – Zone 1

KEYPLAN MONITORING

4
1 2
1 2 3

1. Installed Toilet Exhaust Air Duct

3 4
MEPFS WORKS
PROGRESS PHOTOS
LOCATION : Third Floor Level – Zone 1

KEYPLAN MONITORING

1 2

1. Installed Toilet Exhaust Air Duct

1 2
MEPFS WORKS
PROGRESS PHOTOS
LOCATION : Fourth Floor Level – Zone 1

KEYPLAN MONITORING

1 2
1 2 3 4

1. Installed Toilet Exhaust Air Duct

3 4
MEPFS WORKS
PROGRESS PHOTOS
LOCATION : Zone 1

KEYPLAN MONITORING

4 3 2 1
1 2

1. Light testing of installed Toilet


Exhaust Air Duct

3 4
PROGRAM AND PLANNING
STRUCTURAL ALLIGNED - ELECTRICAL WORK

Ground Floor Second Floor Third Floor

Fourth Floor Fifth Floor Roof Deck

LEGEND :
Completed

On going MEPFS Works

On going Structural Works


PROGRAM AND PLANNING
ARCHITECTURAL ALLIGNED - ELECTRICAL WORK
KEYPLAN MONITORING
SECOND FLOOR LEVEL

LEGEND :

04 Completed
With Balance MEPFS Works
03 05 No Architectural Wall Installed
Not yet started MEPFS Works

02 06

01
23 22 21 20 19 18

07 08 09 10 11 12 14 15 16 17

Activities:
1. Roughing ins done on all unit at Zone 1 with balance of wiring and 3 rd
fix.
2. Zone 2 has no architectural partitions
PROGRAM AND PLANNING
ARCHITECTURAL ALLIGNED - ELECTRICAL WORK
KEYPLAN MONITORING
THIRD FLOOR LEVEL

LEGEND :

04 Completed
With Balance MEPFS Works
03 05 No Architectural Wall Installed
Not yet started MEPFS Works

02 06

01
23 22 21 20 19 18

07 08 09 10 11 12 14 15 16 17

Activities:
1. Roughing ins done on all unit at Zone 1 with balance of wiring and 3 rd
fix.
2. Zone 2 has no architectural partitions
PROGRAM AND PLANNING
ARCHITECTURAL ALLIGNED - ELECTRICAL WORK
KEYPLAN MONITORING
FOURTH FLOOR LEVEL

LEGEND :

04 Completed
With Balance MEPFS Works
03 05 No Architectural Wall Installed
Not yet started MEPFS Works

02 06

01
23 22 21 20 19 18

07 08 09 10 11 12 14 15 16 17

Activities:
1. Roughing ins done on all unit at Zone 1 with balance of wiring and 3 rd
fix.
2. Zone 2 has no architectural partitions
PROGRAM AND PLANNING
ARCHITECTURAL ALLIGNED - ELECTRICAL WORK
KEYPLAN MONITORING
FIFTH FLOOR LEVEL

LEGEND :

04 Completed
With Balance MEPFS Works
03 05 No Architectural Wall Installed
Not yet started MEPFS Works

02 06

01
23 22 21 20 19 18

07 08 09 10 11 12 14 15 16 17
MEPFS WORKS
PANEL BOARD AMD SWITCH BOARD
DELIVERY STATUS
PROJECT NAME: THE FLATS SACRED HEART
LOCATION: SACRED HEART ST. COR. DAO ST. BRGY SAN ANTONIO, MAKATI CITY
SUBJECT: PANEL BOARD AND SWITCH BOARD MONITORING

Item Fabrication
Description Shop Drawing Status Delivery Date Remarks
No. Status
           
44 sets delivered last April 19, 2021. 44 sets
1.00 LPH-A, B, C AND D & LPD-A AND B Approved w/ comment On going April 30, 2021
balance, LPH-A,B,C&D
2.00 ELP2F, 3F,4F AND 5F Approved Done Delivered April 12, 2021
3.00 ELP3FAd Approved Done Delivered April 12, 2021
4.00 LP3FAd Approved On going April 30, 2021  
1 set delivered last April 12, 2021. 3 weeks
5.00 METER CENTER MC2F-3F, MC4F AND MC5F Approved with comment On going April 30, 2021
lead time for the remaining.
6.00 KWHR METER Approved with comment Done Delivered April 12, 2021
Returned. For Revision Panel Branches does
7.00 LPGFAd Approved with comment Done April 30, 2021
not match the Load Schedule requirement
8.00 ELPGFAd Approved Done Delivered April 12, 2021
9.00 EPPGFAd Approved with comment On going April 30, 2021  Pending. Megaricton to verify to plant
10.00 EPPRDAd Approved Done Delivered April 12, 2021
11.00 PP-ELEV Approved Done Delivered April 12, 2021
12.00 MCB Approved with comment Done Delivered April 20, 2021
13.00 BBG-1 Approved with comment Done April 30, 2021 On going factory testing
14.00 LVSB-1 Approved with comment Done Delivered April 12, 2021
15.00 EPPGEN Approved with comment On going April 30, 2021  
16.00 AUTOMATIC TRANSFER SWITCH Redraw and Resubmit On going April 30, 2021  Megaricton to verify to plant
LEGEND :
Complete Delivered

Partially Delivered
MEPFS WORKS
PROGRESS PHOTOS
LOCATION : Hallway – Zone 1

KEYPLAN MONITORING

1. Normal and Emergency


Feederline for Electrical

2F Hallway 3F Hallway 4F Hallway


MEPFS WORKS
PROGRESS PHOTOS
LOCATION : Second Floor Level

KEYPLAN MONITORING

3 1
2

1 2

1. EE Room
2. Normal Feeder line
3. Emergency Feeder line

3
MEPFS WORKS
PROGRESS PHOTOS
LOCATION : Second Floor Level – Zone 1

KEYPLAN MONITORING

4 3 2

1 1 2

1. Box Setting On Drywalls

3 4
MEPFS WORKS
PROGRESS PHOTOS
LOCATION : Third Floor Level – Zone 1

KEYPLAN MONITORING

4 3 2 1

1 2

1. Box Setting On Drywalls

3 4
MEPFS WORKS
PROGRESS PHOTOS
LOCATION : Third Floor Level – Zone 1

KEYPLAN MONITORING

1 2 3 4 1 2

1. Box Setting On Drywalls

3 4
MEPFS WORKS
PROGRESS PHOTOS
LOCATION : Fourth Floor Level – Zone 1

KEYPLAN MONITORING

4 3 2

1 2
1

1. Box Setting On Drywalls

3 4
MEPFS WORKS
PROGRESS PHOTOS
PANEL BOARD AND SWITCH BOARD

LEGEND
1. ELP GFAd
2. ELP 2F

1 1 1

2 2 2
MEPFS WORKS
PROGRESS PHOTOS
PANEL BOARD AND SWITCH BOARD

LEGEND
1. ELP 3F
2. ELP 3FAd

1 1 1

2 2 2
MEPFS WORKS
PROGRESS PHOTOS
PANEL BOARD AND SWITCH BOARD

LEGEND
1. ELP 4F
2. ELP 5F

1 1 1

2 2 2
MEPFS WORKS
PROGRESS PHOTOS
PANEL BOARD AND SWITCH BOARD

LEGEND
1. PP ELEV
2. EPP RDAd

1 1 1

2 2
MEPFS WORKS
PROGRESS PHOTOS
PANEL BOARD AND SWITCH BOARD

LEGEND
1. MCB
2. LVSB-1

1 2
PROGRAM AND PLANNING
STRUCTURAL ALLIGNED – PLUMBING & SANITARY WORK

Ground Floor Second Floor Third Floor

Fourth Floor Fifth Floor Roof Deck

LEGEND :
Completed

On going MEPFS Works

On going Structural Works


PROGRAM AND PLANNING
KEYPLAN MONITORING
PLUMBING WORKS
GROUND FLOOR ( LAYING OF SANITARY AND STORM PIPES)

2F-ZONE 2
Stub Out Works

2F-ZONE 1
Stub Out Works

LEGEND :
Completed

On going Structural Works

On going Structural Works


parallel to other zone
PROGRAM AND PLANNING
ARCHITECTURAL ALLIGNED - PLUMBING WORK
KEYPLAN MONITORING
SECOND FLOOR LEVEL

LEGEND :

04 Completed
With Balance MEPFS Works
03 05 No Architectural Wall Installed
Not yet started MEPFS Works

02 06
Isometric Plan View (PWD Unit)
01
23 22 21 20 19 18

07 08 09 10 11 12 14 15 16 17

Activities:
1. Installation of Pre-Fabricated Sanitary Line
2. Restoration of Stub out Isometric Plan View (Typical Unit)
3. Installation of water line
4. Installation of Riser
5. Hydrotesting and Gravity Testing
PROGRAM AND PLANNING
ARCHITECTURAL ALLIGNED - PLUMBING WORK
KEYPLAN MONITORING
THIRD FLOOR LEVEL

LEGEND :

04 Completed
With Balance MEPFS Works
03 05 No Architectural Wall Installed
Not yet started MEPFS Works

02 06

01
23 22 21 20 19 18

07 08 09 10 11 12 14 15 16 17

Isometric Plan View (Typical Unit)


Activities:
1. Installation of Pre-Fabricated Sanitary Line
2. Restoration of Stub out
3. Installation of water line
4. Installation of Riser
5. Hydrotesting and Gravity Testing
PROGRAM AND PLANNING
ARCHITECTURAL ALLIGNED - PLUMBING WORK
KEYPLAN MONITORING
FOURTH FLOOR LEVEL

LEGEND :

04 Completed
With Balance MEPFS Works
03 05 No Architectural Wall Installed
Not yet started MEPFS Works

02 06

01
23 22 21 20 19 18

07 08 09 10 11 12 14 15 16 17

Isometric Plan View (Typical Unit)


Activities:
1. Installation of Pre-Fabricated Sanitary Line
2. Restoration of Stub out
3. Installation of water line
4. Installation of Riser
5. Hydrotesting and Gravity Testing
PROGRAM AND PLANNING
ARCHITECTURAL ALLIGNED - PLUMBING WORK
KEYPLAN MONITORING
FIFTH FLOOR LEVEL

LEGEND :

04 Completed
With Balance MEPFS Works
03 05 No Architectural Wall Installed
Not yet started MEPFS Works

02 06

01
23 22 21 20 19 18

07 08 09 10 11 12 14 15 16 17

Isometric Plan View (Typical Unit)


Activities:
1. Installation of Pre-Fabricated Sanitary Line
2. Restoration of Stub out
3. Installation of water line
4. Installation of Riser
5. Hydrotesting and Gravity Testing
PROGRAM AND PLANNING
ARCHITECTURAL ALLIGNED - PLUMBING WORK
KEYPLAN MONITORING
SECOND FLOOR LEVEL

LEGEND : For Sanitary Pipes

04 Testing Completed
Ready Testing

03 05 Not yet tested

02 06

01
23 22 21 20 19 18

07 08 09 10 11 12 14 15 16 17

Isometric Plan View (Typical Unit)


Activities:
1. Gravity Testing for Sanitary Pipe Line
2. Hydrostatic Pressure Testing for Waterline Pipe
PROGRAM AND PLANNING
ARCHITECTURAL ALLIGNED - PLUMBING WORK
KEYPLAN MONITORING
THIRD FLOOR LEVEL

LEGEND : For Sanitary Pipes

04 Testing Completed
Ready Testing

03 05 Not yet tested

02 06

01
23 22 21 20 19 18

07 08 09 10 11 12 14 15 16 17

Isometric Plan View (Typical Unit)


Activities:
1. Gravity Testing for Sanitary Pipe Line
2. Hydrostatic Pressure Testing for Waterline Pipe
PROGRAM AND PLANNING
ARCHITECTURAL ALLIGNED - PLUMBING WORK
KEYPLAN MONITORING
FOURTH FLOOR LEVEL

04 LEGEND : For Sanitary Pipes

Testing Completed
03 05 Ready Testing
Not yet tested
02 06

01
23 22 21 20 19 18

07 08 09 10 11 12 14 15 16 17

Isometric Plan View (Typical Unit)

Activities:
1. Gravity Testing for Sanitary Pipe Line
PROGRAM AND PLANNING
ARCHITECTURAL ALLIGNED - PLUMBING WORK
KEYPLAN MONITORING
FIFTH FLOOR LEVEL

LEGEND :

04 Testing Completed
Ready for Testing

03 05 Not yet tested

02 06

01
23 22 21 20 19 18

07 08 09 10 11 12 14 15 16 17

Isometric Plan View (Typical Unit)

Activities:
1. Gravity Testing for Sanitary Pipe Line
MEPFS WORKS
PLUMBING & SANITARY WORK
THREE WEEKS LOOK AHEAD SCHEDULE
PROJECT NAME: THE FLATS SACRED HEART
LOCATION: SACRED HEART ST. COR. DAO ST. BRGY SAN ANTONIO, MAKATI CITY
SUBJECT: THREE WEEKS LOOK AHEAD SCHEDULE
PROGRAM AND PLANNING
PLUMBING & SANITARY WORKS
TESTING MONITORING

Activities:
1. Gravity testing for Sanitary Line
2. Hydrostatic Pressure Testing for Waterline
MEPFS WORKS
PROGRESS PHOTOS
LOCATION : Ground Floor Level – Zone 1

KEYPLAN MONITORING

4 1 2
3 2 1

1. Installed Sanitary and Storm Drain


Pipes

3 4
MEPFS WORKS
PROGRESS PHOTOS
LOCATION : Second Floor Level – Zone 1

KEYPLAN MONITORING

4 3 2 1
1 2

1. Installed Sanitary Line and


Waterline

3 4
MEPFS WORKS
PROGRESS PHOTOS
LOCATION : Second Floor Level – Zone 2

KEYPLAN MONITORING
4
3
2
1

1
2

1. Installed Waterline

3 4
MEPFS WORKS
PROGRESS PHOTOS
LOCATION : Third Floor Level – Zone 1

KEYPLAN MONITORING

1 2
1 2 3 4

1. Installed Sanitary Line and


Waterline

3 4
MEPFS WORKS
PROGRESS PHOTOS
LOCATION : Third Floor Level – Zone 2

KEYPLAN MONITORING

3
2
1

1 2
4

1. Installed Waterline

3 4
MEPFS WORKS
PROGRESS PHOTOS
LOCATION : Fourth Floor Level – Zone 1

KEYPLAN MONITORING

4 3
1 2
1 2

1. Installed Sanitary Line and


Waterline

3 4
MEPFS WORKS
PROGRESS PHOTOS
LOCATION : Fifth Floor Level – Zone 1

KEYPLAN MONITORING

3 2

1 2
1

1. Installed Waterline

3
MEPFS WORKS
PROGRESS PHOTOS
LOCATION : Fifth Floor Level – Zone 1

KEYPLAN MONITORING

5 4 3 2 1

1 2

1. Installed Riser Unit 18, Unit 19 ,


Unit 20, Unit 21 and Unit 22

3 4 5
3 4
PROGRAM AND PLANNING
STRUCTURAL ALLIGNED – MECHANICAL WORK

Ground Floor Second Floor Third Floor

Fourth Floor Fifth Floor Roof Deck

LEGEND :
Completed

On going MEPFS Works

On going Structural Works


PROGRAM AND PLANNING
KEYPLAN MONITORING
FIRE PROTECTION WORKS
GROUND FLOOR LEVEL (SLEEVING WORKS)

GF- ZONE 2
Sleeving Works GF- ZONE 2
Sleeving Works
50mmØ BI Pipes = 1 mtr
100mmØ BI Pipes = 3 mtr 50mmØ BI Pipes = 0.6 mtr

Pipe Fitter = 2mp Pipe Fitter = 2mp

LEGEND :
Completed

On going MEPFS Works

On going Structural Works


PROGRAM AND PLANNING
KEYPLAN MONITORING
FIRE PROTECTION WORKS
SECOND FLOOR LEVEL (SLEEVING WORKS)

2F- ZONE 2
Sleeving Works

50mmØ BI Pipes = 2.05 mtr


64mmØ BI Pipes = 0.3 mtr
100mmØ BI Pipes = 0.4 mtr 2F - ZONE 1
Sleeving Works
Pipe Fitter = 2mp
50mmØ BI Pipes = 1.9 mtr

Pipe Fitter = 2mp

LEGEND :
Completed

On going MEPFS Works

On going Structural Works


PROGRAM AND PLANNING
KEYPLAN MONITORING
FIRE PROTECTION WORKS
THIRD FLOOR LEVEL (SLEEVING WORKS)

3F- ZONE 2
3F - ZONE 1
Sleeving Works
Sleeving Works
50mmØ BI Pipes = 2.05 mtr
50mmØ BI Pipes = 1.9 mtr
64mmØ BI Pipes = 0.3 mtr
100mmØ BI Pipes = 0.4 mtr
Pipe Fitter = 2mp
Pipe Fitter = 2mp

LEGEND :
Completed

On going MEPFS Works

On going Structural Works


PROGRAM AND PLANNING
KEYPLAN MONITORING
FIRE PROTECTION WORKS
FOURTH FLOOR LEVEL (SLEEVING WORKS)

4F- ZONE 2
Sleeving Works
4F - ZONE 1
Sleeving Works
50mmØ BI Pipes = 2.05 mtr
64mmØ BI Pipes = 0.3 mtr
50mmØ BI Pipes = 1.9 mtr
100mmØ BI Pipes = 0.4 mtr
Pipe Fitter = 2mp
Pipe Fitter = 2mp

LEGEND :
Completed

On going MEPFS Works

On going Structural Works


PROGRAM AND PLANNING
KEYPLAN MONITORING
FIRE PROTECTION WORKS
FIFTH FLOOR LEVEL (SLEEVING WORKS)

5F- ZONE 2
Sleeving Works
5F - ZONE 1
50mmØ BI Pipes = 2.05 mtr Sleeving Works
64mmØ BI Pipes = 0.3 mtr
100mmØ BI Pipes = 0.4 mtr 50mmØ BI Pipes = 1.9 mtr
Pipe Fitter = 2mp Pipe Fitter = 2mp

LEGEND :
Completed

On going MEPFS Works

On going Structural Works


PROGRAM AND PLANNING
ARCHITECTURAL ALLIGNED – FIRE PRO WORK
KEYPLAN MONITORING
SECOND FLOOR LEVEL

LEGEND :

04 Completed
With Balance MEPFS Works
03 05 No Architectural Wall Installed
Not yet started MEPFS Works

02 06

01
23 22 21 20 19 18

07 08 09 10 11 12 14 15 16 17

Activities:
1. Installation of Crossmain
2. Installation of Branchline
3. Installation of Pipe Riser
4. Fabrication of Flange
PROGRAM AND PLANNING
ARCHITECTURAL ALLIGNED – FIRE PRO WORK
KEYPLAN MONITORING
THIRD FLOOR LEVEL

LEGEND :

04 Completed
With Balance MEPFS Works
03 05 No Architectural Wall Installed
Not yet started MEPFS Works

02 06

01
23 22 21 20 19 18

07 08 09 10 11 12 14 15 16 17

Activities:
1. Installation of Crossmain
2. Installation of Branchline
3. Installation of Pipe Riser
4. Fabrication of Flange
PROGRAM AND PLANNING
ARCHITECTURAL ALLIGNED – FIRE PRO WORK
KEYPLAN MONITORING
FOURTH FLOOR LEVEL

LEGEND :

04 Completed
With Balance MEPFS Works
03 05 No Architectural Wall Installed
Not yet started MEPFS Works

02 06

01
23 22 21 20 19 18

07 08 09 10 11 12 14 15 16 17

Activities:
1. Installation of Crossmain
2. Installation of Branchline
3. Installation of Pipe Riser
4. Fabrication of Flange
PROGRAM AND PLANNING
ARCHITECTURAL ALLIGNED – FIRE PRO WORK
KEYPLAN MONITORING
FIFTH FLOOR LEVEL

LEGEND :

04 Completed
With Balance MEPFS Works
03 05 No Architectural Wall Installed
Not yet started MEPFS Works

02 06

01
23 22 21 20 19 18

07 08 09 10 11 12 14 15 16 17

Activities:
1. Installation of Crossmain. Area still not workable
2. Installation of Branchline. Area still not workable
MEPFS WORKS
FIRE PROTECTION WORK
THREE WEEKS LOOK AHEAD SCHEDULE
PROJECT NAME: THE FLATS SACRED HEART
LOCATION: SACRED HEART ST. COR. DAO ST. BRGY SAN ANTONIO, MAKATI CITY
SUBJECT: THREE WEEKS LOOK AHEAD SCHEDULE
MEPFS WORKS
PROGRESS PHOTOS
LOCATION : Fire Exit 2 - Riser

2F Hallway 3F Hallway 4F Hallway 5F Hallway


MEPFS WORKS
PROGRESS PHOTOS
LOCATION : Hallway – Zone 1 & Zone 2

KEYPLAN MONITORING

1. Crossmain for Fire


Protection
2. Normal and Emergency
Feederline for Electrical

2F Hallway
MEPFS WORKS
PROGRESS PHOTOS
LOCATION : Hallway – Zone 1 and Zone 2

KEYPLAN MONITORING

1. Crossmain for Fire


Protection

3F Hallway
MEPFS WORKS
PROGRESS PHOTOS
LOCATION : Second Floor Level – Zone 1

KEYPLAN MONITORING

4 3 2

1
2
1

1. Installed branch line per unit

3 4
MEPFS WORKS
PROGRESS PHOTOS
LOCATION : Third Floor Level – Zone 1

KEYPLAN MONITORING

1
3 2
1 2

1. Installed branch line per unit

3 4
MEPFS WORKS
PROGRESS PHOTOS
LOCATION : Fourth Floor Level – Zone 1

KEYPLAN MONITORING

4 3 2 1

1
2

1. Installed branch line per unit

3 4