Integrated Solid Waste Management For Kairana, Thana & Shamli Nagar Palika, U.P

The document provides population details and estimates of solid waste generation for three municipalities in Uttar Pradesh, India. It estimates the current and projected daily waste generation amounts for each municipality. The document then outlines the proposed integrated solid waste management plan, including waste sorting, composting, landfill specifications and area requirements. It provides specifications for required equipment and estimates capital costs for the plant, machinery, and civil works needed to implement the plan.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
137 views23 pages

Integrated Solid Waste Management For Kairana, Thana & Shamli Nagar Palika, U.P

The document provides population details and estimates of solid waste generation for three municipalities in Uttar Pradesh, India. It estimates the current and projected daily waste generation amounts for each municipality. The document then outlines the proposed integrated solid waste management plan, including waste sorting, composting, landfill specifications and area requirements. It provides specifications for required equipment and estimates capital costs for the plant, machinery, and civil works needed to implement the plan.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
You are on page 1/ 23

INTEGRATED SOLID WASTE MANAGEMENT FOR

KAIRANA, THANA & SHAMLI NAGAR PALIKA, U.P.

PRESENTED BY:
MAX ION TECHNOLOGIES, DELHI
POPULATION DETAILS (2011-19) & SOLID WASTE GENERATION

Name of ULB Population Males Females


Kairana Nagar 89000 47047 41953
Palika
Thana Bhawan 36669 19248 17421
Nagar Palika
Shamli Nagar 107266 57187 50079
Palika

TYPES OF WASTE GENERATED:


1. INERT WASTES
2. ORGANIC WASTES
3. DRAIN SILT
4. RECYCLABLES
5. CONSTRUCTION DEBRIS

ASSUMING PER CAPITA SOLID WASTE GENERATION OF 0.4KG/PERSON/DAY


APPROACH & METHODOLOGY
QUANTIFICATION OF SOLID WASTE GENERATION
Name of ULB Daily Waste Generation
Kairana Nagar Palika 35.6 tones
Thana Bhawan Nagar Palika 14.67 tones
Shamli Nagar Palika 42.90 tones
PROJECTION OF SOLID WASTE GENERATION
Name of ULB Daily Waste Generation (2019)
Kairana Nagar Palika 35.6 tones
Thana Bhawan Nagar Palika 14.67 tones
Shamli Nagar Palika 42.90 tones

Name of ULB Daily Waste Generation (2025) *


Kairana Nagar Palika 45 tones
Thana Bhawan Nagar Palika 18.72 tones
Shamli Nagar Palika 57.50 tones

Assuming 5%Growth Rate, mean of arithmetic progression, Incremental Method &


Geometric Progression Method
LEGAL FRAMEWORK

1. AIR & WATER ACT


2. ENVIRONMENTAL IMPACT ASSESSMENT
NOTIFICATION , 2006
3. MSW (MANAGEMENT & HANDLING RULES,2000)
MOEF NO. S.O. 783(E) DATED 27TH SEPT 1999, THE
GAZETTES OF INDIA, PART II, SECTION 3, SUB – SECTION (B)
PROPOSED PROCESSING & DISPOSAL PLAN
1. PRE – SORTING
PROPOSED PROCESSING & DISPOSAL PLAN
2. WINDROW FORMATION ( STATIC AERATED OR MANUALLY ALTERED)

Aerobic composting occurs when C/N <50, moisture (40-50%) . Matured waste has C/N of 20-25 forwarded for
screening
PROPOSED PROCESSING & DISPOSAL PLAN
3. MONSOON SHED : The digested material from windrow pad is moved to monsoon shed for
drying.
4. MECHANICAL SIEVING:

The dried material is then fed into a rotary trammel fitted with dual mesh (25MM and 4mm holes). Final compost
of 4mm size is obtained. Rejects from the trammel sent to land fill.
NON BIODEGRADABLE WASTE ( REFUSED DERIVED FUEL)
The non bio degradable waste is segregated and forwarded to RDF peletization.
AREA RERQUIREMENTS FOR PROCESSING UNIT
The non bio degradable waste is segregated and forwarded to RDF pelletization.

S.No Processing Unit Area (sq m)


Kairana Nagar Thana Bhawan Shamli Nagar
Palika (45TPD) Nagar Palika Palika (57.50TPD)
(18.72TPD)
1 Pre Sorting Machine & Yard 800 500 1100
2 Windrow pads 1900 850 2500
3 Monsoon Shed 850 350 1200
4 Mechanical Sieving 550 300 700
TOTAL SPACE ( SQM) 4100 2000 5500
SPECIFICATIONS FOR EQUIPMENT ( GARBAGE SORTING MACHINE)
SPECIFICATIONS FOR EQUIPMENT (DOUBLE DECK ROTARY SCREENING MACHINERY
SPECIFICATIONS FOR EQUIPMENT (RDF
MACHINE)
SPECIFICATIONS FOR EQUIPMENT (RDF
MACHINE)
SPECIFICATIONS FOR LANDFILL FACITLITY
The landfill is a combination of below and above ground landfill in order to economize on space. The landfill will
have an overall height of 18 m with 3 m below ground
S.No Assumption

A. Assumptions
Initial Waste Generation (2020) 35.6 TPD
Bulk Density of the material 0.8 T/mcube

Fraction of the waste to be landfilled 20%

Design Life 5 years


Weight of the waste to be landfilled per day 7.12 TPD
Qty (cum) per day 8.9 Mcube

Waste Collection depth per day 1m


Area 8.9 M sq
Soil depth above the landfill waste 0.10m
Qty of soil above the landfill waste 0.89 M cube

Total Volume per day 9.79 M cube


Per Year 2020 3573.36 M cube
Per year 2021 3752 M cube
Per Year 2022 3939.61 M cube
Per Year 2023 4136.60 M cube
Per Year 2024 4343.43 M cube
Per Year 2025 4560.60 M cube
Total waste for 5years 24,305.6 M cube
SPECIFICATIONS FOR LANDFILL FACITLITY
S.No Dimension of Landfill site

B. Dimensions of Site
Depth of Landfill 3.00m
Total Volume required 24,305.6 M cube
Length 101.27 m
Width 80.0 m
Slope 1: 2.5
Landfill Area required for Kairana Nagar Palika 8101.87 Sq m
Landfill Area Required for Thana Bhawan Nagar 3800 sq m
Palika

Landfill Area Required for Shamli Nagar Palika 10261 sq m

The Landfill bottom shall be lined with 900mm of mineral sealing system of clay of permeability K<
10^(-9) m /s. Overlaid with 2.0mm of HDPE layer and protected by Geotextile Layer of 2000 gsm. And
on the top a 300mm gravel layer for leachate percolation.
SPECIFICATIONS FOR LANDFILL SITE
The Landfill bottom shall be lined with 900mm of mineral sealing system of clay of permeability K<
10^(-9) m /s. Overlaid with 2.0mm of HDPE layer and protected by Geotextile Layer of 2000 gsm. And
on the top a 300mm gravel layer for leachate percolation.
CUMULATIVE AREA REQUIREMENTS
S.No Name of Site Total Area Required (sqm)
1 Kairana Nagar Palika 12,201
2 Thana Bhawan Nagar Palika 5,800
3 Shamli Nagar Palika 15,761
CAPITAL COST ESTIMATION ( PART-A: PLANT &
MACHINERY)
Name of Unit / Component Capital Cost for Kairana Capital Cost for Thana Capital Cost for
S.No Bhawan Shamli
1 Weigh Bridge ( 30MT) 12,50,000 12,50,000 12,50,000

2 Sorting Machine (20T) 1,15,00,000 48,00,000 1,50,00,000

3 Double Decker Screening Machine 57,00,000 35,00,000 75,00,000


(10TPH)
4 Bailing Machine 13,50,000 8,60,000 18,90,000
5 Shredding Machine ( 10TPH) 18,50,000 12,56,000 25,00,000
6 Sanitary Pad Disposal Incinerator 25,40,000 25,40,000 25,40,000

7 Vehicles

Handcarts 67,000 45,000 78,000


Tractor & Trailer 28,00,000 14,00,000 42,00,000
JCB Blackhoe Loader 35,00,000 28,00,000 70,00,000
TOTAL 3,05,57,000 1,84,51,000 4,19,58,000
CAPITAL COST ESTIMATION ( PART-B: CIVIL WORKS)
Name of Unit / Component Capital Cost for Kairana Capital Cost for Thana Capital Cost for
S.No Bhawan Shamli
1 Admin building & DG Shed 18,00,000 18,00,000 18,00,000

2 Toilet Block with outside shed area 13,00,000 13,00,000 13,00,000

3 Weight bridge room 5,50,000 5,50,000 5,50,000

4 Weighbridge platform 4,12,000 4,12,000 4,12,000


5 Transformer yard 50,000 50,000 50,000
6 Borewell 1,50,000 1,50,000 1,50,000

7 Office Vehicle Parking 60,000 60,000 60,000

8 Plumbing & Sanitary Works 15,00,000 15,00,000 15,00,000


9 Electrical Works (All) 55,00,000 32,00,000 60,00,000
10 Green Belt 3,35,000 3,35,000 3,35,000
11 HDPE& Geo Textile Layer for Lining 27,00,000 13,00,000 35,00,000
in Monsoon Sheds
TOTAL 1,43,57,000 1,06,57,000 1,56,57,000
OPERATION & MAINTENANCE( PART-C)ANNUAL
S.No Particulars Total Rates Amount per Year
A Staff Salary/Wages
1 Manager 1 360000 360000
2 Workers at Tipping Floor 4 180000 720000
3 Processing Plant 6 160000 960000
4 Drivers 2 120000 240000
5 Helpers 6 120000 720000
6 Security 2 96000 192000

B Power Charges LS To be estimated as per actual

C Consumables
1 Microbial Cultures 800000
2 Hose Pipes 50000
3 Showels 23000
4 Plastic Pots 54000
5 HDPE Bags 157000

TOTAL 42,76,000
NET CAPITAL & ANNUAL O&M COSTS

S.NO Name of Site Capital Cost Annual O&M Cost

Kairana Nagar Palika


1 4,49,14,000 4276000
Thana Bhawan Nagar Palika
2 2,91,08,000 4276000
Shamli Nagar Palika
3 5,76,15,000 4276000
The above prices are excluding of GST