Padel Court Tender Presentation PT
Padel Court Tender Presentation PT
T E C H N I C A L T E N D E R P R E S E N TAT I O N
10 NOVEMBER 2021
AGENDA
1. Company Introduction and experience on delivering similar projects
2. Project Scope / Execution Strategy
3. Organization chart
4. Design Consultant
Experience in design of similar projects
Organization chart (Team leader and the team with clear understanding of scope)
Experience in dealing with Authorities (Flow chart showing obtaining permit to getting BCC)
5. HSE Representative- to demonstrate his plan of implementing HSE on site
6. Logistics Plan
7. Programme
8. Key subcontracts / supply chain (Tent/Enclosure Steel sub-contractor, Infrastructure, etc.)
9. Procurement of Long Lead Items
10. 30 & 60 day action plan
11. Q & A
Q&A | Discussion
ORGANIZATION CHART
PROJECT DELIVERY ORGANIZATION CHART
Q&A | Discussion
DESIGN CONSULTANT
EXPERTISE IN DESIGNING SIMILAR PROJECTS
• XXX
ORGANIZATION CHART
• XXX
EXPERIENCE IN DEALING WITH AUTHORITIES
• XXX
Q&A | Discussion
HSE PLAN
HSE
HSE Management
ALNASR considers the Health, Safety and Environment performance of this project as the key deliverable to which
there will be no compromise.
This project will be managed against the requirements of ISO 14001:2015, ISO 45001:2018, OSHAD SF V3.1,
and applicable MUBADALA HSE Management system of contractors Rev A0 requirements.
The most challenging aspect of this project is working at height within a live environment and doing so
in the COVID 19 pandemic era.
ALNASR team is well experienced & understands the risks involved in the project. Through collective
efforts, we have delivered projects recently in this environment with an outstanding HSE performance.
All work at height platforms/equipment shall conform with OSHAD, MUBADALA and other applicable
international standards requirements. Detailed activity specific method statements, drawings and risk
assessments shall be prepared and submitted for review and approval prior to commencement of any
works.
A team of competent HSE advisors shall be mobilized to pilot the Project HSE related matters and
provide competent advice when required.
Q&A | Discussion
LOGISTICS PLAN
LOGISTICS PLAN
PROGRAMME
PROGRAMME
Engineeri
ng Phase Receipt of Design NOC
Procurem
ent Phase Procurement of Long Lead (incl. Submission, Approval & Delivery to Site)
Months 01 02 03 04 05 06
PROGRAMME
PROGRAMME
Q&A | Discussion
Federal Transformers/Emirates
4 Transformer 16 UAE
Transformers/Equivalent
In addition to 30 Day Action Plan Activities, 60 Day Action Plan will include further activities described
as below:
• Preparation and Submission of documents to request for Design NOC.
• Preparation and Submission of documents to request for Building Permit.
• Placement of LPO’s for Long Lead critical items.
• Award of Subcontracts.
• Mobilization commencement for site equipment's.
• Mobilization commencement for direct skilled and unskilled workforce for carrying out the site
works.
• Commencement of early preconstruction activities – Clearing and grubbing, Grading and General
earthworks.
Q&A | Discussion
Q &A
AL NASR CONTRACTING CO. Q&A | Discussion
Defence Road
P.O. Box: 2436,
Abu Dhabi, U.A.E
Telephone :(971) 2 6420002
Fax : (971) 2420228
Email : [email protected]
Follow us on :
www.alnasruae.com