Training PODFA: Prepol - Preheater - Design
Training PODFA: Prepol - Preheater - Design
Training PODFA
Polys ius
Page 2
Clinker Production
5
9
4
1
6
2 3 6 7 8 10 11
1. Crushing 7. Burning
2. Storage, Mixing 8. Cooling
3. Dosing 9. Storage
4. Grinding 10. Grinding
5. Homogenising 11. Storage, Packing and Loading
6. Preheating, Calcining
Design Reheater- PREPOL®
Training PODFA
November 2010
2 Polysius
S:\Team\Training\Transfer\PODFA-Presentationen-Maintenance_Training\06-02-PODFA-Design-Preheater.ppt
PREPOL® - Preheater
Content
Preheater system
Calciner – PREPOL®-MSC
Cyclone stages
Meal chutes
Removal of deposits
S:\Team\Training\Transfer\PODFA-Presentationen-Maintenance_Training\06-02-PODFA-Design-Preheater.ppt
Page 4
S:\Team\Training\Transfer\PODFA-Presentationen-Maintenance_Training\06-02-PODFA-Design-Preheater.ppt
Page 5
Tertiary air
duct
For PODFA we build a preheater with
2-string and 4-stages for a capacity of
7500 t/d.
Kiln inlet
S:\Team\Training\Transfer\PODFA-Presentationen-Maintenance_Training\06-02-PODFA-Design-Preheater.ppt
Page 6
Preheater System
Temperature profile
360 – 650°C
570 – 960°C
750 – 1130 °C
880 – 1260 °C
Kiln inlet
1150°C
Design Reheater- PREPOL®
Training PODFA
November 2010
6 Polysius
S:\Team\Training\Transfer\PODFA-Presentationen-Maintenance_Training\06-02-PODFA-Design-Preheater.ppt
Page 7
Preheater System
Modular Calciner System
PREPOL AS PREPOL AS - CC PREPOL MSC PREPOL MSC - CC
→ Combustion
Important design criteria: → Retention time
→ Material transport
Design Reheater- PREPOL®
Training PODFA
November 2010
7 Polysius
S:\Team\Training\Transfer\PODFA-Presentationen-Maintenance_Training\06-02-PODFA-Design-Preheater.ppt
Preheater System – PREPOL MSC
Combustion conditions for NO reduction by fuel, air and meal staging
Meal
> 1,05
H2 O NO
N2 CO2
NHi
H2 O
CO2 0,9 < < 1,05
N2
NO
CHi
0,4 - 0,6 Q CO
CHi Air 0,9 < < 1,05
NO
CO2
H2 O
≤ 0,1 Q N2
CO NO
Fuel
NHi
Stage 4
Q = total fuel
= excess air figure
Stage 3
0,4 - 0,6 Q
Stage 2
Stage 1
S:\Team\Training\Transfer\PODFA-Presentationen-Maintenance_Training\06-02-PODFA-Design-Preheater.ppt
Page 9
S:\Team\Training\Transfer\PODFA-Presentationen-Maintenance_Training\06-02-PODFA-Design-Preheater.ppt
Page 10
Starting from meal chute I (1) and then over the entire length 3
of the inclined inlet floor, down to the edge of the inlet trough
(2) there is a straight, continuous, unobstructed pathway (3)
into the kiln. This channel cerates a concentrated and low-
turbulence flow of meal.
2
S:\Team\Training\Transfer\PODFA-Presentationen-Maintenance_Training\06-02-PODFA-Design-Preheater.ppt
Page 11
S:\Team\Training\Transfer\PODFA-Presentationen-Maintenance_Training\06-02-PODFA-Design-Preheater.ppt
Page 12
- Simple exchange of the segments about the rear of the inlet housing
S:\Team\Training\Transfer\PODFA-Presentationen-Maintenance_Training\06-02-PODFA-Design-Preheater.ppt
Page 13
S:\Team\Training\Transfer\PODFA-Presentationen-Maintenance_Training\06-02-PODFA-Design-Preheater.ppt
Page 14
Gas flow
Burner
S:\Team\Training\Transfer\PODFA-Presentationen-Maintenance_Training\06-02-PODFA-Design-Preheater.ppt
Page 15
Cyclone stages
Type C
Type B
Type A
S:\Team\Training\Transfer\PODFA-Presentationen-Maintenance_Training\06-02-PODFA-Design-Preheater.ppt
Page 16
Type A
Dedusting cyclone
Stage 1
Design Reheater- PREPOL®
Training PODFA
November 2010
16 Polysius
S:\Team\Training\Transfer\PODFA-Presentationen-Maintenance_Training\06-02-PODFA-Design-Preheater.ppt
Page 17
Gas duct
raw meal
Meal chute
Splash box
S:\Team\Training\Transfer\PODFA-Presentationen-Maintenance_Training\06-02-PODFA-Design-Preheater.ppt
Page 18
Cyclone stages
Cyclone roof for compensation
S:\Team\Training\Transfer\PODFA-Presentationen-Maintenance_Training\06-02-PODFA-Design-Preheater.ppt
Page 19
Cyclone stages
Dip pipes
The dip pipe is movable suspended at his upper end. The function of the dip pipe, is to increase the separation
efficiency and thus to reduce the dust circulations. The material of the dip pipe has to resist the temperature in the
cyclone and must have a good resitants against chemical attack.
S:\Team\Training\Transfer\PODFA-Presentationen-Maintenance_Training\06-02-PODFA-Design-Preheater.ppt
Page 20
Cyclone stages
Mounting dip pipe
S:\Team\Training\Transfer\PODFA-Presentationen-Maintenance_Training\06-02-PODFA-Design-Preheater.ppt
Page 21
Cyclone stages
Advantages
• The element design of the dip pipe allows a partial renovation of the dip pipe
from below.
• The elements are portable so that no hoists are required in the cyclone.
S:\Team\Training\Transfer\PODFA-Presentationen-Maintenance_Training\06-02-PODFA-Design-Preheater.ppt
Cyclone stages
Maintenance
S:\Team\Training\Transfer\PODFA-Presentationen-Maintenance_Training\06-02-PODFA-Design-Preheater.ppt
Cyclone stages
Maintenance
S:\Team\Training\Transfer\PODFA-Presentationen-Maintenance_Training\06-02-PODFA-Design-Preheater.ppt
Cyclone stages
Maintenance
S:\Team\Training\Transfer\PODFA-Presentationen-Maintenance_Training\06-02-PODFA-Design-Preheater.ppt
Cyclone stages
Maintenance
S:\Team\Training\Transfer\PODFA-Presentationen-Maintenance_Training\06-02-PODFA-Design-Preheater.ppt
Page 26
Meal chutes
expansion joint
support
S:\Team\Training\Transfer\PODFA-Presentationen-Maintenance_Training\06-02-PODFA-Design-Preheater.ppt
Page 27
lever with
sliding weight
inspection port
bolted cover
housing with
refractory lining
flap blade
S:\Team\Training\Transfer\PODFA-Presentationen-Maintenance_Training\06-02-PODFA-Design-Preheater.ppt
Page 28
Hot meal pendulum flaps are discharge devices for a varying mass flow of material with simulteneous
shutting-off the counterflowing hot gas.
The clear cross-section which remains when the flap blade is closed corresponds approximately to the
filling level at nominal capacity of the plant.
With increased mass flow of material the flap blade opens. Then the flap blade closes again by means
of the external sliding weights up to the internal stop.
The sliding weights of the levers and there position themself should be so adjusted that the flap could
open very easily to avoid blockages.
S:\Team\Training\Transfer\PODFA-Presentationen-Maintenance_Training\06-02-PODFA-Design-Preheater.ppt
Page 29
S:\Team\Training\Transfer\PODFA-Presentationen-Maintenance_Training\06-02-PODFA-Design-Preheater.ppt
Page 30
Expansion joints
S:\Team\Training\Transfer\PODFA-Presentationen-Maintenance_Training\06-02-PODFA-Design-Preheater.ppt
Page 31
Dispersion box
incorrect correct
S:\Team\Training\Transfer\PODFA-Presentationen-Maintenance_Training\06-02-PODFA-Design-Preheater.ppt
Page 32
4
5
8 5
S:\Team\Training\Transfer\PODFA-Presentationen-Maintenance_Training\06-02-PODFA-Design-Preheater.ppt
Tertiary air duct
TA – duct at kilnhood
Connection to cooling air
Seal to be installed
S:\Team\Training\Transfer\PODFA-Presentationen-Maintenance_Training\06-02-PODFA-Design-Preheater.ppt
Tertiary air duct
TA – duct at kilnhood
Cooling air
Tertiary air duct
Ring pipe
Kiln hood
Dip tube into TA
S:\Team\Training\Transfer\PODFA-Presentationen-Maintenance_Training\06-02-PODFA-Design-Preheater.ppt
Tertiary air duct
TA – duct throttle valve
1 Housing
2 Valve blade
3 Shaft
4 Bearing
5 Linkage
6 Operating lever
7 Actuator
S:\Team\Training\Transfer\PODFA-Presentationen-Maintenance_Training\06-02-PODFA-Design-Preheater.ppt
Tertiary air duct
TA – duct throttle valve
1. Housing
6. Operating lever
3. Shaft
4. Bearing
2. Valve blade
5. Linkage
7. Actuator
S:\Team\Training\Transfer\PODFA-Presentationen-Maintenance_Training\06-02-PODFA-Design-Preheater.ppt
Page 37
S:\Team\Training\Transfer\PODFA-Presentationen-Maintenance_Training\06-02-PODFA-Design-Preheater.ppt
Page 38
1
It is only an proposal according to our
experiences, the final position can change
during operation.
control cabinet
Design Reheater- PREPOL®
Training PODFA
November 2010
38 Polysius
S:\Team\Training\Transfer\PODFA-Presentationen-Maintenance_Training\06-02-PODFA-Design-Preheater.ppt
Shock blower system
S:\Team\Training\Transfer\PODFA-Presentationen-Maintenance_Training\06-02-PODFA-Design-Preheater.ppt
Page 40
Shock blower
Units
Regulator and
filter unit Operating air (by
customer)
Valve unit
Blasting
system
S:\Team\Training\Transfer\PODFA-Presentationen-Maintenance_Training\06-02-PODFA-Design-Preheater.ppt
Page 41
Shock blower
Cleaning nozzles
0°- exhaust angle 90°- exhaust angle
S:\Team\Training\Transfer\PODFA-Presentationen-Maintenance_Training\06-02-PODFA-Design-Preheater.ppt
Page 42
Shock blower
Weldings
S:\Team\Training\Transfer\PODFA-Presentationen-Maintenance_Training\06-02-PODFA-Design-Preheater.ppt
Page 43
Shock blower
Weldings
S:\Team\Training\Transfer\PODFA-Presentationen-Maintenance_Training\06-02-PODFA-Design-Preheater.ppt
Shock blower system
Examples
S:\Team\Training\Transfer\PODFA-Presentationen-Maintenance_Training\06-02-PODFA-Design-Preheater.ppt
Shock blower system
Examples
S:\Team\Training\Transfer\PODFA-Presentationen-Maintenance_Training\06-02-PODFA-Design-Preheater.ppt
Shock blower system
Safety
S:\Team\Training\Transfer\PODFA-Presentationen-Maintenance_Training\06-02-PODFA-Design-Preheater.ppt
Page 47
Removal of deposits
S:\Team\Training\Transfer\PODFA-Presentationen-Maintenance_Training\06-02-PODFA-Design-Preheater.ppt
Removal of deposits
Compressed air cleaning system
S:\Team\Training\Transfer\PODFA-Presentationen-Maintenance_Training\06-02-PODFA-Design-Preheater.ppt
Removal of deposits
Compressed air cleaning system
S:\Team\Training\Transfer\PODFA-Presentationen-Maintenance_Training\06-02-PODFA-Design-Preheater.ppt
Removal of deposits
Compressed air cleaning system
Cleaning of cyclone outlets
S:\Team\Training\Transfer\PODFA-Presentationen-Maintenance_Training\06-02-PODFA-Design-Preheater.ppt
Page 51
Removal of deposits
Manual cleaning
S:\Team\Training\Transfer\PODFA-Presentationen-Maintenance_Training\06-02-PODFA-Design-Preheater.ppt
Removal of deposits
Manual cleaning – poking holes
S:\Team\Training\Transfer\PODFA-Presentationen-Maintenance_Training\06-02-PODFA-Design-Preheater.ppt
Design Reheater- PREPOL®
Training PODFA
November 2010
53 Polysius
S:\Team\Training\Transfer\PODFA-Presentationen-Maintenance_Training\06-02-PODFA-Design-Preheater.ppt