Pathway For Better Walking For People: Project Proposal To Brgy. Abuyogay, Javier, Leyte For Constructing A Pathway
This proposal requests funding from Brgy. Abuyogay, Javier, Leyte to construct pathways to make transportation easier for residents. The muddy conditions, especially during rainy seasons, make travel difficult to farms, homes, and other destinations. The project involves laying cement and completing the pathways over two phases from March to April 2022 with a budget of 500,000 PHP for materials, labor, and tools. The pathways aim to lessen the struggles of residents in the barangay when travelling to localized areas.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
682 views
Pathway For Better Walking For People: Project Proposal To Brgy. Abuyogay, Javier, Leyte For Constructing A Pathway
This proposal requests funding from Brgy. Abuyogay, Javier, Leyte to construct pathways to make transportation easier for residents. The muddy conditions, especially during rainy seasons, make travel difficult to farms, homes, and other destinations. The project involves laying cement and completing the pathways over two phases from March to April 2022 with a budget of 500,000 PHP for materials, labor, and tools. The pathways aim to lessen the struggles of residents in the barangay when travelling to localized areas.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
You are on page 1/ 14
PATHWAY FOR BETTER WALKING
FOR PEOPLE
Project proposal to Brgy.
Abuyogay, Javier, Leyte for constructing a pathway BACKGROUND • Our community is known as agricultural and way their is so muddy especially for rainy seasons. It is a challenge to their destination such as their farm, poultrys, homes, etc. • Due to the creative thinking of the people, they decided to have a pathway to atleast lessen their struggle for walking to their needed. PATHWAY Is a short length way that usually in my community as a road in going to localized places. As a concerned citizen, I propose this project to Brgy. Abuyogay to atleast lessen their problems for going to their destination. OBJECTIVES • To lessen the struggle in going to localized areas in Brgy. Abuyogay, Javier, Leyte. • To help for transportation (motorcycles and bicycles) to atleast used the pathway for transporting foods and supplies. • To help the farmers for going to their farms especially in far from proper road. SCOPE • The proposal focuses only for constructing pathways for the people of Brgy. Abuyogay, Javier, Leyte. PROJECT TIME-FRAME PHASE 1 • Phase 1 Task: Filling up of cement for base • Start Date: March 15, 2022 • End Date: March 25, 2022 PHASE 2 • Phase 2 task: Layering and Finishing the pathway • Start Date: March 27, 2022 • End Date: April 12, 2022 PROJECT BUDGET BREAKDOWN ONE-TIME COST IN • ₱500,000.00 DESCRIPTION OF TIME COSTS • The estimated expenses of ₱500,000.00 is needed to buy cements,Nails, cocolumber, missing construction tools, sand and gravel, hollow blocks, steel bars, and the rest of the money is for the 5 laborers. • Cement- 200 sacks x 150php= 50,000php • Steel bars- 100pcs x 150php= 15,000php • Sand and gravel- 5 cubic x 2,600php=130,000php • Nails- 10kls(#3) x 40php= 400php • Missing construction tools- 3,500php • Marines- 20pcs x 1,500php= 30,000php • Hollow blocks- 1000pcs x 12php=12000php • Cocolumbers- 2 by 4cm- 30pcs x 250php= 75,000php • Total of 315,900php LABORER'S SALARY • 1 DAY- 600PHP • 22 DAYS x 600php = 13, 200php • 13,200 PHP x 5 laborers= 66,000 php PROJECT MONITORING AND EVALUATION • Client- Brgy. Abuyogay, Javier, Leyte • Sponsor- Capt. Jorge U. Sabundo Jr. • Project Manager- Jamier Ross V. Sabundo