The document discusses project life-cycle management. It outlines several project life-cycle (PLC) models including the traditional, World Bank, PMI, and generic models. The generic model consists of four stages: idea conception, development, execution and control, and finish/closeout. Each stage involves different management tasks. Understanding the project life-cycle enables effective planning, monitoring, and improvement of future projects.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
87 views25 pages

Project Life-Cycle MGT - Jed

The document discusses project life-cycle management. It outlines several project life-cycle (PLC) models including the traditional, World Bank, PMI, and generic models. The generic model consists of four stages: idea conception, development, execution and control, and finish/closeout. Each stage involves different management tasks. Understanding the project life-cycle enables effective planning, monitoring, and improvement of future projects.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
You are on page 1/ 25

Uganda Management Institute

Module: Project Management Principles

PROJECT LIFE-CYCLE MANAGEMENT

By Jedras Mpirirwe
Tel. 0772326027 /0700346412
[email protected]

8/20/22 07:48 AM [email protected] 1


Session objectives
Participants to appreciate and usefully
apply:
*The concept of PLC mgt
*The different PLCs
*Phases of PLC: The Generic Model
*What activities characterize the different
phases

8/20/22 07:48 AM [email protected] 2


The Project Management Process

8/20/22 07:48 AM [email protected] 4


Introduction
 PLC serves to capture and define the beginning
and end of the project.
 Usually projects are scaled down into phases for
easy management and performance tracking.
 The project phases may be many, but most
practitioners use four (The Generic Project Life
Cycle)
 The PLC is characterized by a slow-rapid structure
i.e., a progressive build up as the project is defined
and developed, full and intensive activity during
implementation, followed by winding down of the
work and the final termination.
8/20/22 07:48 AM [email protected] 5
Illustration

8/20/22 07:48 AM [email protected] 6


Concept clarification

• Project Cycle Management (PCM) is a term


used to describe the management activities
and decision-making procedures used during
the life-cycle of a project (including key tasks,
roles and responsibilities, key documents and
decision options).
• The PLC refers to a logical sequence of
activities to accomplish the project’s goal,
purpose & objectives.
8/20/22 07:48 AM [email protected] 7
Project Life-cycle Models
The Traditional Model
The World Bank Model
PMI Model
PCM Logical Framework Approach LFA
European Union & Management Development
Institute
Method 123 Project Mgt Methodology (MPMM)
The Generic Model

8/20/22 07:48 AM [email protected] 8


1. The Traditional Model

The Traditional PLC, developed by Baum (1970) while


working with the World Bank.
• Identification
• Preparation
• Appraisal and selection
• Negotiation & Board approval
• Implementation
• Evaluation

8/20/22 07:48 AM [email protected] 9


2. The (New) World Bank Model

The idea has been that the past projects were not
demand driven but rather supply driven, thus project
failures.
• Listening
• Piloting
• Demonstration
• Mainstreaming

8/20/22 07:48 AM [email protected] 10


3. The PMI Model

• Initiation
• Planning
• Execution
• Control
• Handover

8/20/22 07:48 AM [email protected] 11


5. European Union & Management Development
Institute

8/20/22 07:48 AM [email protected] 12


7. The Generic Model of PLC: (CDEF)

Stage 1: Idea Conception =Birth/Germination


- Project identification
- Scope and objectives
- Pre-feasibility
- Appraisal
- Assess risks
- Decision: Go or no Go

8/20/22 07:48 AM [email protected] 13


Stage 2: Development=Growth

– Full plan/proposal development


– Designing and stating requirements of the
project team
– Quality standards are developed
– Detailed activity planning and activity scheduling
– Master plan- Policies and procedures
– Present final project document and secure
funding if necessary.

8/20/22 07:48 AM [email protected] 14


Stage 3: Execution and Control= Maturity
– Set up organization or decide host department
– Education and communication
– Procure goods and services
– Execute work
– Monitor and control

M&E concerns
– Monitoring should be continuous
– Success and failure
– What went well deserves a repeat
– What went wrong should be avoided!

8/20/22 07:48 AM [email protected] 15


Stage 4: Finish/closeout

– Completion of work
– Achievement of benefits
– Disbanding and rewarding the team
– Evaluation
– Celebration of success
– Use of product and customer acceptance
– Records kept for future references

8/20/22 07:48 AM [email protected] 16


Key notes
 Project work may have several distinct stages. The
stages are closely related and the sequence may
be completed without notice. It may also be
repeated.
 Each phase involves different management
approaches and presents different tasks to be
performed.
 Project planning cuts across all phases and
initiation process is repeated at each successive
stage.
8/20/22 07:48 AM [email protected] 17
Monitoring refers to continuous assessment of the
project performance. It involves collection of
accurate, reliable and timely info to identifying
implementation bottlenecks and take corrective
actions in a bid to achieve the intended planned
project objectives.
and
Evaluation is the process of establishing the extent
to which the project has been successful in
achieving the planned objectives and subsequently
ascertaining whether or not the project has
improved the lives of the target beneficiaries.

8/20/22 07:48 AM [email protected] 18


Benefits of PLC
 Enable project team and stakeholders to
understand the process to be followed during the
life of the project.
 Capture the best experience within the
organization so that the life cycle process can be
improved continually and duplicated on future
projects.
 Enable all the project roles and
responsibilities, and the project planning,
estimating, scheduling, monitoring and control
methods and tools, to be appropriately related to
the overall project life cycle management process.
8/20/22 07:48 AM [email protected] 19
Critical Reflection

Unless a well-documented, understandable


picture of the life cycle process/model for
each project category/sub-category exists, it
is difficult to achieve the full benefits of modern,
systematic project management.

8/20/22 07:48 AM [email protected] 20


CATWOE Test in Determining a suitable PLC
 Customer for the project (Who pays?)
 Agents /stakeholders for the project (who does
what?)
 Transformation the project intends to achieve
(What results?)
 Worldview or major assumption of the
transformation (development hypothesis)
 Owner of the project (who are the beneficiaries)
 Environmental Constraints (natural, social,
political, economic) facing the project

8/20/22 07:48 AM [email protected] 21


Factors affecting project implementation/
ingredients for success

 Strong commitment by the organization


to the project objectives
 Appropriate design and adequate
preparation
 Good managers Vs good/good
projects/Execution team composition
 Favorable/unfavorable operating
environment and government policies.

8/20/22 07:48 AM [email protected] 22


Factors for project failure (irrespective of a
clear PLC)
1. Managerial problems- Weak public administration and
management at the organization, manifested in issues like
poor planning, delays, faulty contracting procedures,
insufficient project supervision, slow response to change,
low staff morale and productivity, low staff retention rates.

2. Financial difficulties
- Insufficiency
- External factors such as inflation
- Misuse of project funds

8/20/22 07:48 AM [email protected] 23


3. Hostile environment- especially, the External
Note: The Project Environment consists of:
- Economic Environment
- Socio-political environment
- Cultural environment
- Geographical environment
- Legal environment

All the above result into: physical delays, cost


over runs, reduction in the project scope,
poor or deferred/postponed implementation.