Error Proofing Form
Error Proofing Form
Dept:____________________________ Operation:__________________________
DISPOSITION
ERROR PROOFING IMPLEMENTATION
FORM
PROCESS: PREVENT ERROR:
SOLUTION:
DESCRIPTION OF PROCESS:
Characteristic ID and
Description:
Error Proofing
Technique(s)
COST:
Alarm Mechanism:
Reaction Plan:
Check Interval:
How to calculate:
Cost of Quality - Use the best available measure, such as scrap rate or dollars.
( Current State - Improved State ) X 100
Percentage Reduction =
Current State
Note: The maximum reduction allowed is 100%.
2. FIRST TIME QUALITY: The net quantity of parts that are acceptable at the end of a process,
divided by the original quantity started into the process, expressed as percentage; i.e., the
accepted parts yield rate. It does not give credit for the results of rework, scrap, etc.
How to calculate:
Cpk = The capability index for a stable process, typically defined as the minimum of
= =
(USL -X) (X-LSL)
or _
3
_
^ R/d 2
3^ R/d 2
How to calculate: