Shop Lay-Out

The document provides a layout of a shielded metal arc welding shop. It includes 12 welding booths, 8 grinding booths, a computer lab, supply room, lavatory, and quality control area. The layout aims to provide adequate and organized facilities for training in shielded metal arc welding.
Copyright
© © All Rights Reserved
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
75 views

Shop Lay-Out

The document provides a layout of a shielded metal arc welding shop. It includes 12 welding booths, 8 grinding booths, a computer lab, supply room, lavatory, and quality control area. The layout aims to provide adequate and organized facilities for training in shielded metal arc welding.
Copyright
© © All Rights Reserved
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
You are on page 1/ 1

SHIELDED METAL ARC WELDING NCI

SHOP LAY – OUT


TESDA PTC – CAGAYAN ZONE 02, NASSIPING, GATTARAN, CAGAYAN
GREEN BOARD
ENTRANCE/EXIT LEARNING
GRINDING
TRAINER’S RESOURCE BOOTH
01
A
AREA RESOURCE AREA
C
H WELDING WELDING WELDING WELDING WELDING WELDING
WORKING
I BOOTH 01 BOOTH 02 BOOTH 03 BOOTH 04 BOOTH 05 BOOTH 06
TABLE GRINDING
E
V BOOTH
E 02
M
E INSTITUTIONAL
N
ASSESSMENT AREA
T
PROGRESS CHART PRACTICAL WORK AREA GRINDING
BOOTH
03
TA WORKING
M TABLE

WELDING GRINDING
WELDING WELDING WELDING WELDING WELDING
BOOTH 11 BOOTH
BOOTH 07 BOOTH 08 BOOTH 09 BOOTH 10 BOOTH 12
CONTEXTUAL SUPPORT SERVICES 04

RESOURCE AREA AREA


SUPPLY &
8m MATERIALS ROOM
GRINDING
BOOTH
05

HYDRAULIC POWER HACKSAW AND


OXYACETYLENE SET GRINDING
BOOTH
06
INFORMATION
BOARD

GRINDING
LAVATORY
BOOTH
07

DISTANCE TOILET FOR TOILET FOR


EQUIPMENT AND COMPUTER LAB. QUALITY
LEARNING HIM HER
TOOLS ROOM AREA CONTROL
AREA GRINDING
AREA BOOTH
08

22 m
Trainer: Robin M. Concordia