0% found this document useful (0 votes)
50 views

Chapter 02 - OPM - Customer - Project

The document discusses creating a customer project in OPM II. It describes creating a process technical plant and ranges per customer, and configuring an automation unit. Process technical levels like plant, aggregate, and device are defined per technical plant. A system technique can divide a technical plant into regions containing automation units, and process plants can be assigned to a system plant. The toolbox provides help on creating customer projects and configuring automation units.

Uploaded by

PXSCDTDHB BCCV
Copyright
© © All Rights Reserved
Available Formats
Download as PPT, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
50 views

Chapter 02 - OPM - Customer - Project

The document discusses creating a customer project in OPM II. It describes creating a process technical plant and ranges per customer, and configuring an automation unit. Process technical levels like plant, aggregate, and device are defined per technical plant. A system technique can divide a technical plant into regions containing automation units, and process plants can be assigned to a system plant. The toolbox provides help on creating customer projects and configuring automation units.

Uploaded by

PXSCDTDHB BCCV
Copyright
© © All Rights Reserved
Available Formats
Download as PPT, PDF, TXT or read online on Scribd
You are on page 1/ 6

OPM II Basic Course

Customer Project
OPM II – Customer Project
Overview

 Create a customer project

 Create a process technical plant and ranges per customer

 Create system technique and configure an automation unit

2 www.andritz-hydro.com
OPM II – Customer Project
Customer, Process Technique, Ranges, Levels

One or more process technical plants can be assigned to each customer. A process
technical plant can be divided additionally into several ranges.

The process technical levels (e.g. PLANT, AGGREGATE, DEVICE, SIGNAL) are defined
per process technical plant and are valid to all ranges. Levels define the steps of the the
process-technical address,
e.g. WEST(PLT).STATION_A(AGG).PUMP_01(DEV).ON(SIG)

Levels of process
Customer, process technical plant technical plant
and default range

3 www.andritz-hydro.com
OPM II - Customer Project
Practice – Create a customer project

4 www.andritz-hydro.com
OPM II – Customer Project
System technique, Regions and AU

A system techncial plant can be divided in several regions. Each Region contains one or
more automation units. It is also possible to assign one ore more process technical
plants to one system technical plant.

In the system technique window the following operations can be done


(OPM II menu – tools – system technique).

 Create regions
System technical plant, region
 Create automation units and automation unit
(supported by Wizards)
 Configure system elements
(ACP 1703)
 Parameter setting of system technical
parameters
 Copy & Paste of parameters and
parameter groups

5 www.andritz-hydro.com
OPM II – Create Customer Project
… more in the TOOLBOX II Online Help

TOOLBOX II – OPM II - Customer, process technique, ranges

TOOLBOX II – OPM II - Levels

TOOLBOX II – OPM II - System technique

TOOLBOX II – TUTORIAL: How to create a customer project?

TOOLBOX II – TUTORIAL: How to create and configure an


automation unit in the system technique?

6 www.andritz-hydro.com

You might also like