0% found this document useful (0 votes)
67 views5 pages

Assignment#3 Koshanov Abylaikhan ID19B030609

The Preliminary Phase is outside the circle in the Architectural Development Method (ADM) because it sets the stage for the rest of the phases in the cycle. During the Preliminary Phase, the enterprise architecture team defines the scope and objectives for the architecture project before beginning the iterative ADM cycle of Phases A through H. Representing the Preliminary Phase outside the circle indicates that it establishes the initial framework before the main iterative process within the circle begins.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
67 views5 pages

Assignment#3 Koshanov Abylaikhan ID19B030609

The Preliminary Phase is outside the circle in the Architectural Development Method (ADM) because it sets the stage for the rest of the phases in the cycle. During the Preliminary Phase, the enterprise architecture team defines the scope and objectives for the architecture project before beginning the iterative ADM cycle of Phases A through H. Representing the Preliminary Phase outside the circle indicates that it establishes the initial framework before the main iterative process within the circle begins.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
You are on page 1/ 5

Enterprise

Architecture
Assignment #3

Kazakh-British Technical University


Faculty of Information Technology

Prepared by: Koshanov Abylaikhan


Checked by: Aldamuratov Jomart
Describe why establishing a
vision is important for
enterprises…

A company's mission statement, goals, and aspirations are


all outlined in a vision statement. It gives them the ability to
describe the traits that affect the strategy of the firm.It can
serve as a roadmap for workers who run across difficulties.
Vision statements encourage staff to work toward common
objectives.
Describe why Toyota is establishing a
Toyota Connected….

The new business will assist a wide range of


consumer-, corporate-, and government-facing
projects and act as a data science hub for Toyota's
global operations. Toyota's global goal of
convenient, clean, and safe mobility in the future
is expanded with the introduction of Toyota
Connected.
With the safest and most responsible methods of
moving people, Toyota will lead the way in the
future mobility society and improve lives all
around the world. That’s Toyota’s global vision.
Toyota Connected Services comes with six
different services: Toyota App, Safety Connect,
Remote Connect, Service Connect, Destination
Assist, and Wi-Fi Connect. In order to succeed in
their goals and visions it is very important for
every human for a company to be easy
accessible. Nowadays, people using their
smartphones, internet an so on, as the main
services of Toyota Connected are exactly all the
things above. That’w why it is very important
What is Volkswagen We? Why is it
important for Volkswagen AG?

Volkswagen We is a service that


enables users to have deliveries
from online shops delivered
directly to the boot.On July 4,
1985, the business name was
once again changed to
Volkswagen Aktiengesellschaft to
reflect the corporation's growing
global diversification from its
main office and plant (the
Volkswagenwerk in Wolfsburg)
(Volkswagen AG).The business
develops vehicles and engines,
manufactures and sells light
commercial vehicles, genuine
parts, turbomachinery, large-bore
diesel engines, propulsion
components, special gear units,
and testing systems, as well as
passenger cars, trucks, buses, and
motorbikes.
Why do you think that Preliminary Phase is outside of
circle in Architectural Development Method ?

In my opinion the EA team should be prepared to


follow an iteration of the ADM cycle at the
conclusion of this stage. This helps to explain why
the Preliminary Phase is represented outside of the
main cycle of Phases A to H and at the top of the
ADM diagram.

You might also like