0% found this document useful (0 votes)
85 views17 pages

MMMUT PPT Template

The document discusses the LHB bogie system used in Indian railways. It provides an introduction to LHB coaches and bogies, describing their development in Germany and production in India. It then explains the key parts of the LHB bogie, including the bogie frame, primary suspension, secondary suspension, and other components. The document also covers maintenance of bogies, advantages, disadvantages, potential defects, safety precautions, and concludes by reflecting on the learning experience.

Uploaded by

Ànkit Mishrà
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
85 views17 pages

MMMUT PPT Template

The document discusses the LHB bogie system used in Indian railways. It provides an introduction to LHB coaches and bogies, describing their development in Germany and production in India. It then explains the key parts of the LHB bogie, including the bogie frame, primary suspension, secondary suspension, and other components. The document also covers maintenance of bogies, advantages, disadvantages, potential defects, safety precautions, and concludes by reflecting on the learning experience.

Uploaded by

Ànkit Mishrà
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
You are on page 1/ 17

Madan Mohan Malaviya Univ.

of Technology, Gorakhpur

LHB BOGIE
Chhatrasal Yadav
Mechanical Engginering
Madan Mohan Malviya University of
Technology Gorakhpur (UP State Govt. University)

Email: [email protected]

02-12-2022 Side 1
Madan Mohan Malaviya Univ. of Technology, Gorakhpur

Content
• Introduction
• Bogie frame
• Parts of LHB Bogie
• Primary suspension
• Secondary suspension
• Maintenance of Bogie
• Advantages
• Disadvantages
• Defects in bogie assembly
• Safety precaution
• Conclusion

02-12-2022 Side 2
Madan Mohan Malaviya Univ. of Technology, Gorakhpur

Introduction.

• Linke Hofmann Busch (LHB) coaches are the passenger coaches of


Indian railways that have been developed by Linke-Hofmann-Busch
of Germany
• Mostly produced by Rail coach factory in Kapurthala,India.
• They have been used since 2000.
• Initially, 24 air-conditioned coaches were imported from Germany for
use in the Shatabdi Expresses.
• After which the rail coach factory started manufacturing after
technology transfer.
• The coaches are designed for an operating speed up to 160 km/h and
could go up to 200 km/h.
• However, they have been tested up to 180 km/h.

02-12-2022 Side 3
Madan Mohan Malaviya Univ. of Technology, Gorakhpur

Bogie Frame

• The bogie frame is a solid welded frame made by steel sheets


and forged or cast parts.
• The frame is made up of two longitudinal components
connected by two cross-beams.
• Which also support the brake units.
• The various supports which connect the different bogie
components are welded to the frame.
• The bogie frame rests on the primary suspension spring units and
supports the vehicle body by means of a bolster beam.
• The bolster beam is connected to the bogie frame by secondary
suspension.

02-12-2022 Side 4
Madan Mohan Malaviya Univ. of Technology, Gorakhpur

Bogie Frame.

Axle

Bogie Frame

02-12-2022 Side 5
Madan Mohan Malaviya Univ. of Technology, Gorakhpur

Parts of LHB Bogie.

1. Primary suspension
2. Secondary suspension
3. Brake assembly
4. Bolster assembly
5. Coupling assembly

02-12-2022 Side 6
Madan Mohan Malaviya Univ. of Technology, Gorakhpur

02-12-2022 Side 7
Madan Mohan Malaviya Univ. of Technology, Gorakhpur

Primary suspension
• Consisting of two coil springs.
• one vertical damper.
• An articulated control arm fitted with twin-layer elastic
joints connecting the axle bearing to the bogie frame

02-12-2022 Side 8
Madan Mohan Malaviya Univ. of Technology, Gorakhpur

Secondary suspension
• Within the secondary suspension between the bogie and the
vehicle body.
• Our air spring systems provide for the flexible mounting of
the vehicle body.
• Air springs have a low natural frequency, which minimizes
the transmission of vibrations.

02-12-2022 Side 9
Madan Mohan Malaviya Univ. of Technology, Gorakhpur

Maintenance of Bogie

• In order to increase the life of bogie and for proper functioning


of bogie, regular maintenance of bogie should be done.
• The following are the steps involved in bogie maintenance:
1. Coach lifting.
2. Bogie cleaning.
3.Bogie dismantling.
4. Component cleaning.
5. Attention to components.
6. Repair of components

02-12-2022 Side 10
Madan Mohan Malaviya Univ. of Technology, Gorakhpur

7.Bogie assembly.
8. Load testing and adjustment.
9. Lowering of coach.
10. Final adjustment.
• In washing plant, first the oil from the side bearer oil bath is
removed.
• Bogie is washed with high pressure hot water jet to remove all
dust, mud, scales, grease without damaging the base primer
coating. After washing and drying, bogies are rolled to

02-12-2022 Side 11
Madan Mohan Malaviya Univ. of Technology, Gorakhpur

Advantages
• The LHB coaches are 1.7 meters longer than the
conventional ICF coaches.
• The LHB coaches can travel at a higher speed.
• During collision , the LHB coaches do not climb on the
adjacent coaches.
• Noise generated by these coaches is 40%less than the ICF
coaches.
• Even the maintenance cost is less than that of ICF coaches.
• These coaches are of lower cost when compared to the ICF
coaches.
• The coaches are equipped with FIAT bogie, which has
lesser moving parts than the ICF bogie. This results in high
durability of the bogie
02-12-2022 Side 12
Madan Mohan Malaviya Univ. of Technology, Gorakhpur

Disadvantages

• Due to CBC coupling, the LHB coaches experience more jerks.


• The LHB coaches are not self generating like ICF coaches.
• A separate generator car has to used for its power usage purpose.

02-12-2022 Side 13
Madan Mohan Malaviya Univ. of Technology, Gorakhpur

Defects in bogie assembly:

• Bolster for twist, crack, corrosion etc


• Rubber sealing cap of center pivot, if torn or damaged.
• Bolster suspension straps if bent or damaged
• Check verticality of pivot.
• Clearance between bolster and bogie frame is 57 mm.
• Spring having cracks, dents should be rejected.
• Inspection of brake beams is important for corrosion, cracks.
• Wheel shifted on axle.
• Heat cracks on wheel.

02-12-2022 Side 14
Madan Mohan Malaviya Univ. of Technology, Gorakhpur

Safety precaution:

• Whenever a coach is examined at maintenance depot, it


should be ensured that prescribed number of various
components are fitted at specified location.
• All fasteners like bolts, nuts etc. used in under frame
equipments should be checked.

02-12-2022 Side 15
Madan Mohan Malaviya Univ. of Technology, Gorakhpur

Conclusions

• It has been a great privilege to be able to work and train in Northern


Railway.
• This training has been a great learning experience and one which will
prove to be immensely useful in the future.
• This was our first practical experience of an industry or workshop of
any kind and we are happy that we could learn a lot in this short span.

02-12-2022 Side 16
Madan Mohan Malaviya Univ. of Technology, Gorakhpur

THANK YOU

02-12-2022 Side 17

You might also like