This document summarizes the status of a program that provided research funds in 2022. It reports that 4 out of the expected 4 research papers were completed, achieving 80% of the expected output. The remaining 20% was not achieved because the second tranche of funding required submission of reports on the first tranche. It also notes that a challenge was delayed submission of liquidation documents from recipients, and the action taken was to strengthen communication and coordinate with a regional office for technical assistance.

Uploaded by

NATHANIEL GALOPO
Copyright
© © All Rights Reserved
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
52 views

Berf 2022

This document summarizes the status of a program that provided research funds in 2022. It reports that 4 out of the expected 4 research papers were completed, achieving 80% of the expected output. The remaining 20% was not achieved because the second tranche of funding required submission of reports on the first tranche. It also notes that a challenge was delayed submission of liquidation documents from recipients, and the action taken was to strengthen communication and coordinate with a regional office for technical assistance.

Uploaded by

NATHANIEL GALOPO
Copyright
© © All Rights Reserved
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
You are on page 1/ 4

PROGRAM IMPLEMENTATION REVIEW

2022 Basic Education Research Fund

RENETCHIE B. MARTINEZ
SEPS=PLANNING & RESEARCH

InitialsOfFunctionalDivision/InitialsOfWhoPrepared/ShortenedTitleOfActivity/InitialsOfDocument-Number/Date
Status of PHYSICAL Accomplishment
Program/ Project Title Output Indicators Physical Accomplishment Reasons for not achieving
100% accomplishment

Expected Output Actual Output % of


Accomplishment

2022 BERF Recipients No. of BERF 4 4 80% 2nd tranche is for release upon
submission of liquidation report
research of the first tranche
papers
completed

InitialsOfFunctionalDivision/InitialsOfWhoPrepared/ShortenedTitleOfActivity/InitialsOfDocument-Number/Date
Bottlenecks, Challenges and Constraints (BCC) in Achieving the Targets

Program/ Project Bottlenecks, Challenges and Action Taken


Title Constraints
Delayed submission of Strengthen
2022 BERF liquidation documents from communication
the teacher recipients mechanisms

Coordinate with RO-


PPRD for TA

InitialsOfFunctionalDivision/InitialsOfWhoPrepared/ShortenedTitleOfActivity/InitialsOfDocument-Number/Date
InitialsOfFunctionalDivision/InitialsOfWhoPrepared/ShortenedTitleOfActivity/InitialsOfDocument-Number/Date
 

You might also like