Capacity Planning
For Products and Services
Capacity Planning
• When is it needed?
5-4 Capacity Planning
Capacity
• Design capacity
• maximum output rate or service capacity an
operation, process, or facility is designed for
• Effective capacity
• Design capacity minus allowances such as
personal time, maintenance, and scrap
• Actual output
• rate of output actually achieved--cannot
exceed effective capacity.
5-6 Capacity Planning
Actual output
Efficiency =
Effective capacity
Actual output
Utilization =
Design capacity
Efficiency/Utilization Example
• Facilities
• Product and service factors
• Process factors
• Human factors
• Operational factors
• Supply chain factors
• External factors
5-9 Capacity Planning
Strategy Formulation
• Facilities
• Cost of building and operating
• Technological changes
• Rate and direction of technology changes
• Behavior of competitors
• Availability of capital and other inputs
5-10 Capacity Planning
Make or Buy
1. Available capacity
2. Expertise
3. Quality considerations
4. Nature of demand
5. Cost
6. Risk
5-13 Capacity Planning
Economies of Scale
• Economies of scale
• If the output rate is less than the optimal level,
increasing output rate results in decreasing
average unit costs
• Diseconomies of scale
• If the output rate is more than the optimal level,
increasing the output rate results in increasing
average unit costs
5-15 Capacity Planning
Evaluating Alternatives
Figure 5.3
Production units have an optimal rate of output for minimal cost.
Average cost per unit
Minimum
cost
0 Rate of output
5-16 Capacity Planning
Evaluating Alternatives
Figure 5.4
Minimum cost & optimal operating rate are
functions of size of production unit.
Average cost per unit
Small
plant Medium
plant Large
plant
0 Output rate
5-17 Capacity Planning
Cost-Volume Relationships
Figure 5.5a
FC
+
Amount ($)
VC C )
t = t (V
s o s
co c
tal bl e
To a r i a
l v
ta
To
Fixed cost (FC)
0
Q (volume in units)
5-19 Capacity Planning
Cost-Volume Relationships
Figure 5.5b
ue
en
Amount ($)
ev
l r
t a
To
0
Q (volume in units)
5-20 Capacity Planning
Cost-Volume Relationships
Figure 5.5c
u e
e n f i t
Amount ($)
e v r o
r P
a l t
t o s
To t a l c
To
0 BEP units
Q (volume in units)
5-21 Capacity Planning
C =
+ V
FC
TC
= TC
V C
+
FC 3 machines
= TC
VC
C + 2 machines
F
1 machine
Quantity
Step fixed costs and variable costs.
5-22 Capacity Planning
$
BEP
3
TC
BEP2
TC
3
TC
2
TR 1
Quantity
Multiple break-even points
5-23 Capacity Planning
Financial Analysis
S ta n d a rd
Annual p r o c e s s i n g t im e P r o c e s s in g t im e
P ro d u c t Dem and p e r u n it ( h r .) n e e d e d (h r.)
#1 400 5 .0 2 ,0 0 0
#2 300 8 .0 2 ,4 0 0
#3 700 2 .0 1 ,4 0 0
5 ,8 0 0
5-26 Capacity Planning
Location/Criteria
PS11
Guitar site location
5-27 Capacity Planning
Capacity/Design
STA11
Demand/ patients/ staffing/ variation at St. Alexius Hospital
5-28 Capacity Planning
SU6
Redesign of layout at Toyota