Meeting PPT - 20.06.2022
Meeting PPT - 20.06.2022
Client: QATARGAS
1
Doha, 20 Jun 2022 Saipem. Engineering Energy
Saipem Classification - General Use
NFPS PROJECT
Meeting Agenda
Description
• Safety Moment
• AOB
28” CRA PL12S (5.7km) 28” CRA PL13S (10.4km) 28” CRA PL14S (7.8km) 28” CRA PL10S (6.8km) 28” CRA PL12N (11.6km)
28” CRA PL10LS (6.8km)
Awarded under
separate contract
6.6 kV SC12S (3.2km)
11 kV SC13S (19.7km)
6.6 kV SC13S (13.2km)
28” PL10 decom.
IFA:
• PID NOVEC 1230 for RP4N, RP6S, WHP12N and WHP14S
• Dropped Object Study Report for RP8S
• Fire, Safety Equipment and Escape Route Layouts for RP8S
• Escape, Evacuation and Rescue Analysis Report for RP8S
• SIL Verification Report for Group 1 Platforms
• SIL Verification Report for Group 2 Platforms
AFC:
• Hazardous Area Classification Layouts for WHP14S
• Fire, Safety Equipment and Escape Route Layouts for RP10S
• Fire, Safety Equipment and Escape Route Layouts for WHP14S
• Fire, Safety Equipment and Escape Route Layouts for RP6S
• Temporary Refuge Impairment Analysis Report for RP10S
• Quantitative Risk Assessment Report for RP6S
• Smoke and Gas Ingress Analysis Report for RP10S
• Safety Sign Layouts for WHP12N
• Helideck Wind Turbulence and Temperature Rise Report for WHP13S
• Explosion Risk Assessment Report for WHP14S
• Quantitative Risk Assessment Report for WHP14S
• Piping & Instrumentation Diagram Riser Platform Firewater Distribution Systems-RTS
• Flare Radiation and Dispersion Calculations - RT-S & PU-S
• Safety Sign Layout - Process Utility Platform - Production Deck – RTS
• Safety Sign Layout - RTS - Cellar Deck
• Safety Sign Layout - RTS - Top Deck
• Hazardous Area Classification Plans Top Deck – RTS
• Hazardous Area Classification Plans Cellar Deck – RTS
• Fire & Gas Safety System Plan Top Deck Riser Platform – RTS
• Fire & Gas Safety System Plan Cellar Deck Riser Platform – RTS
• Escape Routing, Maintenance and Access Layout Top Deck – RTS
• Fire And Gas Mapping Study Report - WHP11S
IFA:
• PID NOVEC 1230 for RP8S, RP11S, RT-2 and RP10S
• Hazardous Area Classification Layouts for RP8S
• Temporary Refuge Impairment Analysis Report for RP8S
• Fire, Safety Equipment and Escape Route Layouts for RP8S
• Onshore plant north flare radiation and dispersion calculation note (slug catcher #1)
• Onshore plant south flare radiation and dispersion calculation note (slug catcher #1)
• Onshore plant south flare radiation and dispersion calculation note (slug catcher #3)
AFC:
• TBE for Deluge
• Safety Sign Layouts for WHP14S
• Fire and Gas Detection Layouts for RP6S
• Fire and Gas Detection Layouts for WHP14S
• Fire, Safety Equipment and Escape Route Layouts for RT-2
• FW Hydraulic Calculation Report for WHP12N
10
Action #1, #11, #13, #18, #19, #72, #74, #75, #76, #80 are closed
CONTRACTOR INSTRUMENTATION 11 10 21 PFP Requirement on Valves have been communicated with INS team
Acoustic insulation will be indicated in PIDs
CONTRACTOR STRUCTURAL 1 5 6 Action #24, #28, #29, #30, #49 are closed
CONTRACTOR STRUCTURAL / SITE 24 24 Requirement have been shared to SITE / FABRICATION YARD
Action #3, #6, #21, #61, #71, #86 are closed
CONTRACTOR STRUCTURAL / 8 6 14
ARCHITECTURAL / SITE
Requirement have been shared to SITE / FABRICATION YARD
CONTRACTOR PIPING / SITE 7 7 Requirement have been shared to SITE / FABRICATION YARD
STRUCTURAL
MECHANICAL Action #33, #44 are closed
PIPING
CONTRACTOR 4 2 6 STR has obtained blast value in their report
ARCHITECTURAL MEC has conveyed blast value to vendor packages
INSTRUMENTATION
LOSS PREVENTION
MECHANICAL
CONTRACTOR INSTRUMENTATION 1 1 2 Action #47 is closed
LOSS PREVENTION (safety sign)
Action #36, #37, #52, #53, #54, #55 are closed
COMPANY LOSS PREVENTION 0 6 6 CPY has shared CAP437 Verification checklist, to be included in next revision
of the report
ERM 4 1 5 Action #35 is closed
Total Action 72 38 110
11
CONTRACTOR INSTRUMENTATION 5 1 5
CONTRACTOR STRUCTURAL 5 3 2
CONTRACTOR PIPING / STRUCTURAL 1 1
CONTRACTOR PROCESS 29 29
CONTRACTOR PROCESS/ STRUCTURAL 1 1
MECHANICAL /
CONTRACTOR 7 7
INSTRUMENTATION
CONTRACTOR LOSS PREVENTION 25 9 16
CONTRACTOR PIPING 1 1
Total Action 74 39 35
12
HAZOP Actions
Area Total Under Sign by CTR or CPY Closed action
GF 286 62 128
BF 121 7 53
ONS 99 22 36
SIL Actions
Area Total Under Sign by CTR or CPY Closed action
GF 9 0 5
BF 9 0 5
ONS 4 3 0
DRA Actions
Area Total Under CTR Sign Closed action
Overall Actions from 1st 33 17 1
DRA
13
14