Meeting PPT - 20.06.2022

The document is a meeting agenda for the North Field Production Sustainability (NFPS) Project. It discusses safety precautions for confined space work, provides a field schematic, and recaps the last weekly meeting. It also provides status updates on activities and deliverables submitted for loss prevention and technical HSE, as well as activities still ongoing. Finally, it discusses the LOSPE study recommendation action tracking follow up.

Uploaded by

guruhpermonoaji
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
187 views15 pages

Meeting PPT - 20.06.2022

The document is a meeting agenda for the North Field Production Sustainability (NFPS) Project. It discusses safety precautions for confined space work, provides a field schematic, and recaps the last weekly meeting. It also provides status updates on activities and deliverables submitted for loss prevention and technical HSE, as well as activities still ongoing. Finally, it discusses the LOSPE study recommendation action tracking follow up.

Uploaded by

guruhpermonoaji
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
You are on page 1/ 15

NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) PROJECT

Client: QATARGAS

LOSS PREVENTION & TECHNICAL HSE

1
Doha, 20 Jun 2022 Saipem. Engineering Energy
Saipem Classification - General Use
NFPS PROJECT
Meeting Agenda
Description
• Safety Moment

• Recap of last weekly meeting/open points

• Status update: Activities/deliverables ongoing & submitted - Loss prevention

• Status update: Activities/deliverables ongoing & submitted -Technical HSE

• Status Update: Action tracking Status update

• Focus areas & Criticalities

• AOB

Saipem Classification - General Use


Safety Moment

Saipem Classification - General Use


NFPS PROJECT
Safety Precautions for Confined Space Work
 Confined spaces remain one of the most hazardous work environments today, still
claiming lives each year.

Saipem Classification - General Use


NFPS PROJECT
Field Schematic

28” CRA PL12S (5.7km) 28” CRA PL13S (10.4km) 28” CRA PL14S (7.8km) 28” CRA PL10S (6.8km) 28” CRA PL12N (11.6km)
28” CRA PL10LS (6.8km)

Awarded under
separate contract
6.6 kV SC12S (3.2km)

11 kV SC13S (19.7km)
6.6 kV SC13S (13.2km)
28” PL10 decom.

6.6 kV SC14S (21.2km)


28” CRA PL11S (6.5km)
28” CRA PL11LS (6.5km)

Removed from SoW (TB043) 28” PL11 decom.

38” CS PL610L (97.9+5.1 km)


32" PL1L (91.4+6.3 km) (Spools+onshore sect. CRA)
32" PL1NL (79.2+1.6 km)

Saipem Classification - General Use


NFPS PROJECT
Recap of Last weekly meeting- Actions/updates
 EPCOL-M-SPM-QG-00688_2022-06-06

Saipem Classification - General Use


NFPS PROJECT
Status update: Activities/deliverables submitted
LOSS PREVENTION
Documents issued last week
IFR:
• Quantitative Risk Assessment Report for RT-2
• PID FW Distribution for RT-2 - Re-IFR
• FW Hydraulic Calculation Report for RT-2 – Re-IFR
• Quantitative Risk Assessment Report - RP1N AND PUN 

IFA:
• PID NOVEC 1230 for RP4N, RP6S, WHP12N and WHP14S
• Dropped Object Study Report for RP8S
• Fire, Safety Equipment and Escape Route Layouts for RP8S
• Escape, Evacuation and Rescue Analysis Report for RP8S
• SIL Verification Report for Group 1 Platforms
• SIL Verification Report for Group 2 Platforms

Saipem Classification - General Use


NFPS PROJECT
Status update: Activities/deliverables submitted (cont.)
LOSS PREVENTION
Documents issued last week

AFC:
• Hazardous Area Classification Layouts for WHP14S
• Fire, Safety Equipment and Escape Route Layouts for RP10S
• Fire, Safety Equipment and Escape Route Layouts for WHP14S
• Fire, Safety Equipment and Escape Route Layouts for RP6S
• Temporary Refuge Impairment Analysis Report for RP10S
• Quantitative Risk Assessment Report for RP6S
• Smoke and Gas Ingress Analysis Report for RP10S
• Safety Sign Layouts for WHP12N
• Helideck Wind Turbulence and Temperature Rise Report for WHP13S
• Explosion Risk Assessment Report for WHP14S
• Quantitative Risk Assessment Report for WHP14S
• Piping & Instrumentation Diagram Riser Platform Firewater Distribution Systems-RTS 
• Flare Radiation and Dispersion Calculations - RT-S & PU-S 
• Safety Sign Layout - Process Utility Platform - Production Deck – RTS 
• Safety Sign Layout - RTS - Cellar Deck 
• Safety Sign Layout - RTS - Top Deck 
• Hazardous Area Classification Plans Top Deck – RTS 
• Hazardous Area Classification Plans Cellar Deck – RTS 
• Fire & Gas Safety System Plan Top Deck Riser Platform – RTS 
• Fire & Gas Safety System Plan Cellar Deck Riser Platform – RTS 
• Escape Routing, Maintenance and Access Layout Top Deck – RTS 
• Fire And Gas Mapping Study Report - WHP11S 

Saipem Classification - General Use


NFPS PROJECT
Status update: Activities/deliverables ongoing
LOSS PREVENTION
IFR:
• Helideck Wind Turbulence and Temperature Rise Study Report for RP11S
Noise Study Report for RP4S
• Noise Study Report for RP7S
• Passive Fireproofing Specification for Onshore Common.

IFA:
• PID NOVEC 1230 for RP8S, RP11S, RT-2 and RP10S
• Hazardous Area Classification Layouts for RP8S
• Temporary Refuge Impairment Analysis Report for RP8S
• Fire, Safety Equipment and Escape Route Layouts for RP8S
• Onshore plant north flare radiation and dispersion calculation note (slug catcher #1)
• Onshore plant south flare radiation and dispersion calculation note (slug catcher #1)
• Onshore plant south flare radiation and dispersion calculation note (slug catcher #3)

AFC:
• TBE for Deluge
• Safety Sign Layouts for WHP14S
• Fire and Gas Detection Layouts for RP6S
• Fire and Gas Detection Layouts for WHP14S
• Fire, Safety Equipment and Escape Route Layouts for RT-2
• FW Hydraulic Calculation Report for WHP12N

Saipem Classification - General Use


NFPS PROJECT
Status update: Activities/deliverables ongoing
TECHNICAL HSE
Documents issued waiting for CPY comment
• SIL Group 1 Close Out Report (IFR)

Documents under Issue/preparation


• SAFETY CRITICAL ELEMENTS & PERFORMANCE STANDARD REPORT (including the
preparation of SCE List Tag Level) (IFR)
• Design HSE Case (including Bow Tie Report) (IFR)
• SRS Group 1, Group 2, Onshore (waiting for vendor data response Time)

10

Saipem Classification - General Use


NFPS Project
LOSPE Study recommendation action tracking follow up - GF
Safety Study Actions Summary Table - GF
Status Actions Total Status Notes

Owner Discipline Closed  with


Open
sufficient reference    

Action #1, #11, #13, #18, #19, #72, #74, #75, #76, #80 are closed
CONTRACTOR INSTRUMENTATION 11 10 21 PFP Requirement on Valves have been communicated with INS team
Acoustic insulation will be indicated in PIDs
CONTRACTOR STRUCTURAL 1 5 6 Action #24, #28, #29, #30, #49 are closed

CONTRACTOR STRUCTURAL / SITE 24   24 Requirement have been shared to SITE / FABRICATION YARD
Action #3, #6, #21, #61, #71, #86 are closed
CONTRACTOR STRUCTURAL / 8 6 14
ARCHITECTURAL / SITE
Requirement have been shared to SITE / FABRICATION YARD
CONTRACTOR PIPING / SITE 7   7 Requirement have been shared to SITE / FABRICATION YARD

CONTRACTOR OPERATION / PIPING 0 1 1 Action #23 is closed

CONTRACTOR PIPING (HANDLING) 2   2  

CONTRACTOR / 4 Recommendation on LPE's side have been incorporated


LOSS PREVENTION / OPERATION 8   8 Recommendation related to Operation Procedure has been shared to PCS
COMPANY
Operating manual
CONTRACTOR LOSS PREVENTION 2 6 8 Action #38, #39, #40, #41, #50, #51 are closed

STRUCTURAL
MECHANICAL Action #33, #44 are closed
PIPING
CONTRACTOR 4 2 6 STR has obtained blast value in their report
ARCHITECTURAL MEC has conveyed blast value to vendor packages
INSTRUMENTATION
LOSS PREVENTION

MECHANICAL
CONTRACTOR INSTRUMENTATION 1 1 2 Action #47 is closed
LOSS PREVENTION (safety sign)
Action #36, #37, #52, #53, #54, #55 are closed
COMPANY LOSS PREVENTION 0 6 6 CPY has shared CAP437 Verification checklist, to be included in next revision
of the report
ERM   4 1 5 Action #35 is closed
  Total Action 72 38 110  
11

Saipem Classification - General Use


NFPS Project
LOSPE Study recommendation action tracking follow up - BF

Safety Study Actions Summary Table - BF


Status Actions

Owner Discipline Closed  Pending Total Status Notes


Total action (agreed
with CPY)

CONTRACTOR INSTRUMENTATION 5 1 5  

CONTRACTOR STRUCTURAL 5 3 2  
CONTRACTOR PIPING / STRUCTURAL 1   1  
CONTRACTOR PROCESS 29   29  
CONTRACTOR PROCESS/ STRUCTURAL 1   1  
MECHANICAL /
CONTRACTOR 7   7  
INSTRUMENTATION
CONTRACTOR LOSS PREVENTION 25 9 16  
CONTRACTOR PIPING 1   1  

  Total Action 74 39 35  

12

Saipem Classification - General Use


NFPS Project
HAZID HAZOP SIL DRA follow up (Including Group 2 & Vendor)
HAZID Actions
Area Total Under Sign by CTR or CPY Closed action
GF 57 15 26
BF 29 10 4
ONS 22 6 10

HAZOP Actions
Area Total Under Sign by CTR or CPY Closed action
GF 286 62 128
BF 121 7 53
ONS 99 22 36

SIL Actions
Area Total Under Sign by CTR or CPY Closed action
GF 9 0 5
BF 9 0 5
ONS 4 3 0

DRA Actions
Area Total Under CTR Sign Closed action
Overall Actions from 1st 33 17 1
DRA

13

Saipem Classification - General Use


NFPS PROJECT
Focus areas & Criticalities
 Color coding (yellow-black stripe) requirement
 TEMPSC call sign
 MACP deletion from jacket level
 NOVEC pkg SDR

14

Saipem Classification - General Use


THANK YOU

15

Saipem Classification - General Use

You might also like