Monitoring &reporing of Resettlement Implementation
Monitoring &reporing of Resettlement Implementation
By
Tefera Tegegne
UIIDP Social Development Consultant
May, 2021
Bishoftu
Contents
Introduction
Objectives
Relevance
Levels of UIIDP Safeguard M&E
Steps of Monitoring
Issues to be Monitored
Reporting and Documentation
Introduction
• Monitoring and Reporting is requirement of
UIIDP
• Monthly, quarterly and annual reports are not
prepared separately for social safeguards
• ULGs social Development officers and
coordinators did not have adequate data
and information on:
– livelihood restoration of project affected people
and
– measures take as per RAP.
Objectives
• To give attention to social safeguard monitoring
and reporting in UIIDP
• To institutionalize social safeguard monitoring
in UIIDP
• To enhance the quality of RAP planning and
implementation
• To show focus areas of social safeguarding
monitoring
• To show that RAP monitoring should be
adequately and regularly conducted by
responsible entities at all level UIIDP
implementation
Relevance Of M &E
• Provides information on mitigation measures taken for identified
the environmental and social impacts of the project.
• Checking the implementation of legal frameworks, ESMSG and RSG
• Checking the implementation plans ( ESMP and RAP)
• Assessing the effectiveness of RAP implementation
– the physical progress of resettlement and rehabilitation activities,
– Payment of compensation,
– the effectiveness of public consultation
– Understand the status Project affected persons
– Grievance redressing
– the sustainability of income restoration and development efforts
among affected communities
– Helps to take measures on the identified gaps
– input for preparation of periodic reports
Levels of UIIDP Safeguard M&E
Planning Implementation
•Institutional
Setup/system in place
(RSG and legal frame • RAP implementation
works • Compensation
• Consultations • Relocation
• Livelihood Restoration
•Screening
• Community Consultation
•RAP preparation • Status of construction
• ESIA and EMP • Grievance Redressing
• Availability of periodic Reports
as required
• Documentation of evidences
and reports
RAP Implementation Monitoring Framework
1. Verify internal RAP implementation reports by a field check of
the following:
– Payment of compensation including its levels and timing
– Settlement of land/resource access claims
– Preparation and adequacy of resettlement sites
– Housing construction
– Provision of employment, its adequacy and income levels
– Adequacy of training and other developmental inputs
– Rehabilitation of vulnerable groups
– Urban utilities repair, relocation or replacement
– Enterprise relocation, compensation and its adequacy
– Transition allowances
Monitoring
2. Checking the implementation of Resettlement/
compensation matrix
3. Checking the application of Monitoring plan of RAP
4. Checking effective utilization of action plan of
safeguard focal persons which will be prepared every
year on the basis of the CIP and procurement plan
5. Interview affected people to assess their
• knowledge and concerns regarding the resettlement process,
• entitlements and
• rehabilitation measures.
RAP Monitoring Framework
1. Introduction
2. Scope and objective
3. Methodology
4. Consultations during planning and implementation
5. Description of Impacts in the RAP and during
implementation
6. Implementation of Entitlements and livelihood Restoration
7. Complaint handling and Response
8. Commitment of the city administration
9. Conclusion and Recommendation
Documentation
ULGs have to arrange and document evidences in folders and
files in the following ways.
Folder /file box #1 : Safeguard management System
– A letter of appointment or assignment of focal person signed by
City Mayor and copied to the City Manager and host office of the
staff
– Minutes of meeting of city council for endorsing city level ESMSG
and RSG documents
– Letter written from the city council to the city administration
and municipality to implement the endorsed and Stamped
safeguards guidelines
• Environmental and Social Management system (ESMSG )
• Resettlement System Guideline (RSG)
Documentation
1
2
Summary UIIDP Project Affected Population (Compensated and Resettled)
1
2
Detail Report on UIIDP the project Affected People (RAP Report)
Substitute in m2 Substitute
land house
M F T
1
2
3
4
Environmental Safeguards Status Report
ULG / Total
Region Total Screened
Number As
of ESMSG Not yet Schedule Schedule Schedule Submitted Approved
projects project screened 1 2 3 to REPA by REPA
Social Safeguards Status
Total
Total Total
Total Total Number Not Number of
Number of Number of
Name of Number of Projects yet Projects
Projects projects not
Region/ULG of CIP Screened as screen for which
requiring requiring
Projects per the RSG ed RAP
RAP RAP
completed
Site Supervision and contractors Report
Social safeguard focal persons have to regularly visit project
sites and write report ( see sample format )
The contractors of the construction have to submit
progress report on Environmental and social measures ( see
the format )
Environmental and social clause
ESMP
Thank You