DESIGN BASIS
• ASME TDP – 1
3
DESIGN CRITERIA
4
MAIN STEAM PIPING
5
MAIN STEAM PIPING
• AUTOMATIC CLOSURE OF MS STRAINER & LINE DRAINS
• SEPARATE ATMOSPHERIC FLASH TANK (UFT) IS PROVIDED IN TG
AREA TO RECEIVE MS DRAINS / HP BYPASS DRAINS TO MINIMIZE
ROUTING PROBLEM
• DRAINAGE SYSTEM AS DESCRIBED HAS BEEN ADOPTED IN
VARIOUS 210 MW / 250 MW / 500 MW PROJECTS LIKE DADRI,
UNCHAHAR, BAKRESWAR, DAHANU, SURATGARH, KOTHAGUDEM,
SIMHADRI ETC.
7
START-UP DRAIN UPSTREAM OF
BOILER STOP VALVE
8
MAIN STEAM LINE DRAINS
(TYPICAL FOR ONE LEG)
HPT
(BEFORE
SEAT
DRAIN)
TO TURBINE
FLASH BOX
(MAL SYSTEM)
(AFTER SEAT DRAIN)
MAIN STEAM
9
MAIN STEAM STRAINER DRAIN
10
HOT REHEAT PIPING
11
HOT REHEAT PIPING
13
HRH LINE DRAINS
(TYPICAL FOR ONE LEG )
IPT
(BEFORE
SEAT TO TURBINE
DRAIN) FLASH BOX
(MAL SYSTEM)
TO CONDENSER
FLASH TANK
(L.O.)
(HRH STRAINER DRAIN)
14
HRH DRAIN BETWEEN IPT & VALVE
15
HRH STRAINER DRAIN
16
COLD REHEAT PIPING
17
COLD REHEAT PIPING
CONTD.
18
COLD REHEAT PIPING
19
CRH RH ISOLATING DEVICE
20
COLD REHEAT LINE DRAINS
HPT
HH
A
DRAIN POT TO TURBINE
H A FLASH BOX
LS (L.O.) (MAL SYSTEM)
LS
(L.O.)
TO CONDENSER
FLASH TANK
21
CRH PIPING DRAIN BETWEEN HPT
EXHAUST & NRV
22
CRH PIPING DRAINS
23
CRH PIPING DRAIN POT
CONTD.
24
CRH PIPING DRAIN POT
25
CRH DRAIN POT ARRANGEMENT
26
HP BYPASS PIPING
27
HP BYPASS PIPING
29
HP BYPASS WARMING-UP SCHEME
HP BYPASS
VALVE
TE
TE TE
250 mm 5 M (min)
WARM-UP LINE
(LO)
TO UFT
30
HP BYPASS WARM-UP PIPING
31
LP BYPASS PIPING
32
LP BYPASS WARM-UP PIPING
33
LP BYPASS WARM UP PIPING
34
LP BYPASS PIPING
CONTD.
36
LP BYPASS PIPING
37
LP BYPASS WARMING UP SCHEME
FOR 210 MW UNITS
HRH LINE
HRH
STRAINER
CONTROL VALVE
TO CONDENSER
Nb 450
STOP VALVE
LP BYPASS
MAIN LINE
TO TURBINE
TO CONDENSER
VIA FLASH TANK
Nb 50 LP BYPASS
WARM-UP LINE
38
LP BYPASS WARMING UP SCHEME
FOR 500 MW UNITS
HRH LINE
HRH
STRAINER
Nb 650
STOP VALVE
LP BYPASS
MAIN LINE
TO CONDENSER
TO TURBINE TO VIA FLASH TANK
CONDENSER
CONTROL VALVE
Nb 50 LP BYPASS
WARM-UP LINE
39
OPERATING MODES
• COLD START-UP
• HOT START-UP
40
NTPC SPECIFIC REQUIREMENTS
41
ANGLE VALVE DRAIN ARRANGEMENT
42
FLASH TANKS SPRAY SYSTEM
43
UNIT FLASH TANK ARRANGEMENT (TYP)
( LO ) ( LO )
SPRAY WATER
FROM SERVICE
WATER SYSTEM
UNIT
FLASH
TANK
3M
TO DRAIN
TRENCH
44
GENERAL RECOMMENDATIONS
CONTD.
45
GENERAL RECOMMENDATIONS
• DRIP POTS, TRAPS & ORIFICES FOR ALL DRAIN LINES SHALL BE