User Manual
User Manual
Table of Contents
The system is divided into 5 modules: Under Scoping, Under Review, Decision
and Monitoring which corresponds to the stages of CNC/ECC Application to
Decision.
System Tools gives the user ability to add Experts to EIARC Expert Pool,
Comments, Case Handler and official holiday that falls during business days.
The system allowed 2 distinct user roles: Case Handler and Supervisor
assigned to each region/office.
Requirements to using the system:
The eis-online is accessible using the URL below. Open/Run the Internet
Explorer and type the string in the URL address bar.
http://58.71.14.169/internal
Once the case handler account was successfully authenticated, the system will
display the main menu with default page “MyProject.aspx”. MyProject page
maintains the list of project under scoping and under review. The content page
will display the corresponding page upon selecting an item from the menu.
The project information is divided into 5 groups: Title & Category, Project
Location, Proponent, Prepare & Case Handlers, and other information.
To add a new project information, from the main menu click “Add a New
Project” to open the “NewProject.aspx” page.
Provide the necessary information and click the “Post this Project” button
located at the lower portion of the page.
Things to consider:
2. For reference code, the user should provide the 13 alpha numeric
character including the “-”. The user should not include the keyword “ECC
or CNC”. The system will automatically append ECC/CNC during the
application stage.
3. Red asterisk “*” means the user needs to provide the field with value.
How to search a project?
There are cases when the user needs to directly search instead of manually
looking the project using the main menus. The system provided a string or
keyword search for project using the Reference Code, Project Title, Location,
and Proponent. The search module is located that upper left portion of the page
body.
Things to consider:
1. Because menu is process driven, some projects is not visible from other
menus such as project under scoping is not visible in the list of projects
listed in the under review or post ecc information.
You can also view the uploaded Project Fact Sheet by clicking the project
title and location Map by clicking the project address from the list.
How to add a Project Geo Information?
At the middle portion of the page, locate and click the button “Add
Coordinates” to open the geo-information page shown below:
To update an existing project, from the main menu click “Update and
Existing Project” to open the “ExistingProject.aspx” page.
Select from the list of projects by clicking the Reference Code to display the
Project Information. Click from the submenus to add activity, major issue,
and EIARC Member.
Things to consider:
1. The user should select first a project from list before clicking the
submenus.
You can also view the uploaded Project location Map by clicking the project
address from the list.
How to add a project activity?
You can add project activity from any stages of the project except during
Post ECC information which is viewable only.
Click from the main menus where the project possibly exist.
Select the project from the list by clicking the reference code
Click the “activities” from the submenus to open the “ProjectActivities.aspx”
page. You can open activity attachments by click any of the links below.
Things to consider:
You can add project major issue from any stages of the project except
during Post ECC information which is viewable only.
Click from the main menus where the project possibly exist.
Select the project from the list by clicking the reference code
Click the “Major Issues” from the submenus to open the “MajorIssued.aspx”
page. You can view the attachment by clicking the link below
You can add project reviewer from any stages of the project except during
Post ECC information which is viewable only.
Click from the main menus where the project possibly exist.
Select the project from the list by clicking the reference code
Click the “EIARC Members” from the submenus to open the
“ProjectReviewer.aspx” page.
Things to consider:
1. If the reviewer is not found in the list, you need to add the reviewer using
the EIARC Expert Pool submenu from the System Tools. Refer to “How to
add a Reviewer to EIARC Expert Pool”
How to add an Application?
After the project under scoping, the case handler can update the project
status to “under review”. Project processing time (clock) will also start during
this stage until decision is made.
From the main menus, click “Add a New Application” to open the
“ExistingProject1.aspx” page showing the list of project under scoping –
candidates for change of status.
Select from the list of the projects by clicking the reference code
How to add an Application?
Things to consider:
Things to consider:
3. Application date
should be later or
equal to the latest
date in the activity
table
How to Update an Existing Application?
Projects specific to the case handler with status “under review” can be found
by clicking “Update an Existing Application” from the main menus.
Select from the list of the projects to add the following information
On the list, the Total days active information of the project is shown. Total
days active includes only business days. Sunday, Saturdays and declared
holidays are not included in the calculation. Region/office should manual
enter holidays using the calendar submenu in the system tools.
After selecting a project, the project information is opened. You can now
click from the sub-menus under the “Update an Existing Application”
How to use the project start-stop clock?
Things to consider:
1. Stop/Start on date
should be newer than
the Started/Stopped
On date
How to stop or resume project clock?
Things to consider:
1. Stop/Start on date
should be newer than
the Started/Stopped
On date
How to stop or resume project clock?
Things to consider:
You can view the start-stop clock table of the project from project
information or when your using the “start-stop clock” a.k.a. “additional
information” Refer to previous slide to start or stop the project clock.
Screen from previous slide when “Show Project Clock” link is clicked. You
can toggle visibility by clicking the “Hide Project Clock” link. You can directly
open the project information page by clicking the reference code.
Screen from project information page shows the project clock with total
actual days active.
How to update and track application document location?
Things to consider:
1. Document location doesn’t maintain history, but only updates the last
location the document was forwarded.
How to update project status to Application with recommendations?
From the main menus, click “Application Decision”. The page will display the list
of projects with status “Review Completed with Recommendations”.
From the list, select the target project/application by clicking the reference code
to open the decision page.
Things to consider:
1. Application falls
under “Approved” will
appear in the List of
Projects under “Post
ECC Information”.
Others are viewable
only by the supervisors.
How to open an ECC amendment?
For ECC amendment, you can add amendments to system for specific project
without limit but only 1 at a time until a decision for amendment is made.
Amendment Application has its own modules comprising the: Open Amendment
Application, Update Amendment Application, Amendment Application Decision.
An information is shown
at this level for
amendment.
An information is shown
at this level for relief.
After an ECC is approved and issued to proponent, the case handler can add post
ECC Information that includes: Monitoring Team, Complaints,
Monitoring/Evaluation conducted, and Violations.
To add Project Monitoring Information, refer to the previous slide for instruction to
open the Project Monitoring Information. Click the “Add Project Monitoring Info”
button
Things to consider:
1. There is only 1 Project Monitoring
Information per project. The “Add
Project Monitoring Info” button is not
visible when project monitoring
information exists.
How to add Post ECC Information – MMT Members?
Each project may have distinct MMT Members. To add MMT Members, Click the
“MMT Members” submenu from “Open Post ECC Information”.
Provide the necessary information and click “Add New Member”. The new
member will appear on the list below
How to add Post ECC Information – MMT Audit Rating?
To add MMT Audit Rating, refer to the previous slide for instruction to open the
Project Monitoring Information. Located at the lower portion is the MMT Audit
Rating.
Provide the rating, date, conducted by fields and click the “Post Rating” button.
How to add Post ECC Information – Complaints?
If the monitoring is
related to complaint,
select the corresponding
complaint ID from the
list. The same will
appear in the complaint
page.
With violation module, you can add or resolve a violation, Add an issuance or
penalty related to violation and post payments using the corresponding buttons
as shown below
If checked, violation
is considered
resolved.
How to add a Reviewer to EIARC Expert Pool?
To add a Reviewer, click the “EIARC Expert Pool” from the “System Tools”
submenus to open list of reviewers. Click “Add New Expert” button
To add a comment, click the “EIARC Comments” from the “System Tools”
submenus to open comment page as shown below.
Select from the list of reviewer, provide the necessary comment and click
“Post this comment”
All comments provided by the case handlers are visible only by the
supervisors.
How to add a Case Handler?
The case handler himself can add another case handler provided that the
supervisor name and password is entered and valid. From system tools, click
“Case Handlers”. Provide supervisor name and password and click “Add a case
handler” to open the case handler page.
Provide the case handler name and remarks and click “Post to Case Handlers”.
The new case handler will appear in the list as shown above.
How to add an official holiday?
To add an official non-working day other than Saturday and Sunday, click the
“Calendar” from the “System Tools” submenus to open calendar page as
shown below.
Each office should provide holidays and should not include Saturdays and
Sundays or holidays that fall on the said days. The system automatically
excludes Saturdays and Sundays during calculation.
How to change user password?
Changing user password is very easy using the “My account” module in the
submenus of the “System Tools”.
Provide your current password and your new password and click “Change
Password”
You should only change your password if you think that your previous
password is compromised or subject to such.
The password should contain not less than 7 alpha numeric characters.
How to log-out the EIS?