Collage of Leadership and Governance School of Policy Studies Department of Development of Policy
Collage of Leadership and Governance School of Policy Studies Department of Development of Policy
• The road cover Oromia region and the southern region of the country.
The scope of the work will include
• The scope of the work will include
• (i) a review of the present road design standard.
• (ii) establishment of new road design and construction standards
improving construction quality, cost-effectiveness, and road safety; and
minimizing any adverse environmental effects.
• (iii) conducting a seminar after the preparation of the draft final report
to assist the officials of countries in full understanding and help adopt
the revised standards; and
Cost Estimates and Financing Plan
A) At National Level:
1. Ministry of Finance and Economic Development
2. Ethiopian Roads Authority
3. Ethiopian Environmental Protection Authority
B) At Regional and Zonal Levels:
• The Oromia Regional State and Southern Nations, Nationalities, and
Peoples’ Regional state and Zonal Administration
• Resettlement and Food Security Office
And also include At Wereda Level:
Application of Policies, Legal and Institutional Framework in the Context of the
Project
• Teciju Civil Engineering Group, a Chinese firm, is awarded a 1.2 Billion Birr road
construction project by the Ethiopian Roads Authority (ERA) for the Konso-Yabelo
road project. 107 Kilometers of the road which connects Konso and Yabello will be
upgraded.
• the recommendations of the seminar will provide valuable input in finalizing the final
design and construction standards the new road design and construction standards
will be published in Ethiopia will include, among others
an array of road profiles and sections to be generated by an accepted graphic
computer output, and
design sketches for each selected road classification and section. Along with the hard
copies, the consultants will make computer diskettes that can be used for desktop
publishing in a commonly used format available to the governments and the Bank.
Closure of the project
• The contract was concluded between Ethiopian Roads Authority(ERA)
and Teciju Zaid Wol/Gabrieliel, Director General, ERA, and Cai
Xiaobin, Teciju General Manager.
• The project completed after 42 months,(September 21, 2014 )
Thankyou