Engineering Sequence Presentation

This document discusses the engineering sequence for mining and EPC projects. It outlines that all personnel should review the scope of work and relevant project documents. It also discusses establishing a project master schedule. The document then lists relevant codes, standards and software used for various engineering disciplines like process, mechanical, piping, instrumentation and electrical. It discusses developing process flow diagrams, piping and instrumentation diagrams, and sharing design data between disciplines. Finally, it briefly mentions project procurement management.

Uploaded by

papathsheila
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
341 views

Engineering Sequence Presentation

This document discusses the engineering sequence for mining and EPC projects. It outlines that all personnel should review the scope of work and relevant project documents. It also discusses establishing a project master schedule. The document then lists relevant codes, standards and software used for various engineering disciplines like process, mechanical, piping, instrumentation and electrical. It discusses developing process flow diagrams, piping and instrumentation diagrams, and sharing design data between disciplines. Finally, it briefly mentions project procurement management.

Uploaded by

papathsheila
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
You are on page 1/ 22

ENGINEERING SEQUENCE

MINING & EPC BUSINESS OVERVIEW

Morowali, 28 Dec 2022

Presented by SSW
Topic Discussion
Mining & EPC Project Introduction
Engineering Sequence for Mining & EPC Project.
Pengenalan Project EPC
Engineering Sequence
Project Scope
All personnel shall review “Scope of Work”.
Each Discipline shall review respective document
received from Client, such as Project Specification and
Drawing.
Prepare Need List (if required) before starting of
Engineering Work.
Input to Project Management Team regarding
engineering deliverable sequence, it is important for
preparing Project Master Schedule.
Code and Standard
API (American Petroleum Institute).
 API 14E for Line Sizing
 API 610 for Pumps Selection and Calculation
 API 650 for Storage Tanks Calculation
 API 521 for Pressure Safety Valve (PSV) Calculation
ASME Standard.
ANSI Standard.
NFPA for Fire Protection System.
SNI (Standar Nasional Indonesia).
Software Requirement
Project Management
 Microsoft Project : Project Planning and Scheduling
 Primavera : Project Scheduling and Control

Process Engineering
 ASPEN HSYS : Process Simulation
 Pipesim : Pipeline Hydraulic Simulation
 OLGA: Flow Assurance (Dynamic) Pipeline Simulation
 Flarenet : Flare Network Simulation
 Pipenet : Firewater Network Simulation
 PHAST : Flare/Vent Dispersion Simulation

Mechanical Engineering
 PVElite / Compress : Pressure Vessel & Heat Exchanger Design
 TANK COADE or AME Tank : Tank Design
Software Requirement
Piping Engineering
 CAESAR II : Pipe Stress Analysis
 SP 3D/E3D/PDMS : 3D Model Design
 AutoCAD : 2D & 3D Drawing
 AutoCAD Plant 3D : 3D Drawing

Instrument Engineering
 InstruCalc : Instrumentation Sizing
 Pipesim : Pipeline Hydraulic Simulation

Electrical Engineering
 ETAP : Power System Studies
 Dialux : Lighting Calculation and Design

Civil Engineering
 Staad Pro : Steel Structural Design
 Tekla Structure: Fabrication Drawing
 Plaxis : Slope Stabilization
Design Data (Process Discipline)
Design Data Interdiscipline
Design Data Interdiscipline
Design Data Interdiscipline
PID Development Instrument &
Electrical Engineer

• Instrument is • Instrument
identified at Design Criteria
PID during PID • Instrument
development Index
• Motor Power is • Control System
identified at Narrative
PID • Electrical Load
• PID Drafting List
Design Data Interdiscipline
Design Data Interdiscipline
Design Data Interdiscipline
Design Data Interdiscipline
PID Piping Engineer
Development

• Equipment • Plot Plant


sizing Development
• Pipe size is • Piping
identified at Layout
PID • Piping
• PID Drafting Design
Criteria
Design Data All Discipline
Design Data All Discipline
PFD PID Discipline
Development Development Engineering

• Technology • Equipment • Plot Plan


selection sizing Layout
• Block Flow • PID • Equipment
Diagram Drafting List
Finalization • Electrical
• PFD Load List
Finalization • Civil
Design
• Building
Layout
Project Procurement Management
Project Procurement Management
THANK YOU