0% found this document useful (0 votes)
8 views

Tss Upgrade

The document discusses the technical site survey process for an upgrade project. It outlines the roles and responsibilities of surveyors, integration engineers, and document controllers. The site survey workflow includes preparing for a site visit, performing an on-site investigation to collect data and photos, and sketching details. Surveyors use tools like cameras, GPS, and measuring tapes. After uploading the survey report to the SDE system, integration engineers and customers review and approve the documents. The presentation provides examples of site details to document, such as antennas, equipment, cabling, and sketches to capture a site layout.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
8 views

Tss Upgrade

The document discusses the technical site survey process for an upgrade project. It outlines the roles and responsibilities of surveyors, integration engineers, and document controllers. The site survey workflow includes preparing for a site visit, performing an on-site investigation to collect data and photos, and sketching details. Surveyors use tools like cameras, GPS, and measuring tapes. After uploading the survey report to the SDE system, integration engineers and customers review and approve the documents. The presentation provides examples of site details to document, such as antennas, equipment, cabling, and sketches to capture a site layout.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
You are on page 1/ 75

TSS SDE

• TECHNICAL SITE SURVEY & SDE

Presenter
MAZRILHISHAM MANSOR
TECHNICAL SITE SURVEY TRAINING
UPGRADE PROJECT
IE - SCOPE

• SURVEYOR • IE production • DOC CONTROLLER / IE LEAD


• - Site Survey • - prepare TSSR / dwg • - assign survey / PO
• - collect data • - prepare as-build / dwg • - monitoring survey progress
• - photos • - assign TSSR / as-build
• - sketching • IE QC • - TSSR progress
• - check doc • - approved / reject
• - TSSR / as-build • - update report
• - project meeting
Site Engineering Workflow
Preparation

Site Investigation

Customer
Site Dependent

Material

Drawings

Allocation and
Cabling documents

SID/CSD Compilation
and Delivery

© Ericsson AB 2015 | 038 13-LZU SDE Tool Part 1, Rev A | 2015-02-24 | Page 7
project workflow
• INTEGRATION 03 TESTING AND COMMISIONING

• INSTALLATION 02 INSTALLATION OF SITE

• SURVEY 01 SITE SURVEY AND REPORT


SITE
ENGINEERING
workflow
• SDD 03 SITE DESIGN DOCUMENT / AS-BUILT

• SID 02 SITE INSTALLATION DOCUMENT

• TSSR 01 TECHNICAL SITE SURVEY AND REPOT


W X Y X

Site Survey

UPLOAD in SDE

CLOU TSSR CLOUD


D
REJECTED

IE
(QC)

RF CLOUD CUSTOME INSTALLATION


APPROVED R APPROVED
REJECTED

RF CHECKING CHECKING
LEAD
TSSR
SDD
ASST LEAD

STAFF STAFF STAFF


Microwave
Fibre Optic
TOOLS
• CIDB, WAH CERT
• CAMERA – 30MP AND ABOVE
• GPS – LOCATION, ALTITUDE
• COMPASS
• MEASURING TAPE
• YELLOW TAPE
• BASIC TOOLS
• STATIONERY – PENCIL, PEN, PAPER,
• SAFETY & PPE – HARNEST, BOOTS, GLOVE,
HELMET
• FIRE EXTINGUISHER
• FIRST AID KIT
• BANNER
• INCLINOMETER
- SURVEY PURPOSE
- SITE LOCATION
- ACCESS
- CHECKLIST
PREPARATION
ACCESS
FULL
VIEW
GPS
ACCESS
SURROUNDIN
G
SURROUNDIN
G
4 WALL
POWER SYSTEM
EXISTING
RECTIFIER
EXISTING RECTIFIER
EXISTING
RBS
EXISTING
RBS
BBU RRU
RU & RRU
EXISTING
19“ RACK
INLET
OUTLET
TOWER
LEG
TOWER
LEG

D A
U

C B
MGB
CABLE ROUTE
CABLE ROUTE
RRU location
ANTENNA LOCATION
Antenna
ANTENNA PORT
ANTENNA TYPE & LABELS
ANTENNA E-TILT
ANTENNA M-TILT
SECTOR VIEW
MICROWAVE
PANORAMIC

0° 30°
PANORAMIC

0° 30°
PANORAMIC

0° 30°
MEASURING
SKETCHING
Sample Sketch

Points to take note


•Reference point with North indication
•Dimension and offset
•Tower width dimension & tower leg
indication (A,B,C)
•Cable ladder dimension + Cable length
•Existing antenna info
•Proposed antenna info
•Proposed equipment info
•Grounding link info
•Power tapping info
•Transmission info
Sample Sketch cont.
SDE: https://cx-site-survey.nro.ericsson.net/

Login: [email protected]
Password: $yahrulSS27
Mazrilhisham Mansor
0163352083
[email protected]
[email protected]

You might also like