KRC (U-3,4) Factory Monthly KSM (May-22 To July-22)

The document summarizes a monthly knowledge sharing meeting for Palmal Group of Industries. It discusses key performance indicators for planning, production, industrial engineering, human resources, and quality assurance from May to July 2022. Some highlights include machine utilization rates between 85-90%, efficiency percentages, profit/loss status, on-time delivery rates, and analysis of top defects. It also includes comparisons of target versus actual production quantities and styles run on machines each month. Operator skill levels were analyzed, with most rated as B-level.

Uploaded by

Nitta Mallik
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPT, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
444 views34 pages

KRC (U-3,4) Factory Monthly KSM (May-22 To July-22)

The document summarizes a monthly knowledge sharing meeting for Palmal Group of Industries. It discusses key performance indicators for planning, production, industrial engineering, human resources, and quality assurance from May to July 2022. Some highlights include machine utilization rates between 85-90%, efficiency percentages, profit/loss status, on-time delivery rates, and analysis of top defects. It also includes comparisons of target versus actual production quantities and styles run on machines each month. Operator skill levels were analyzed, with most rated as B-level.

Uploaded by

Nitta Mallik
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPT, PDF, TXT or read online on Scribd
You are on page 1/ 34

1-1

Palmal Group of Industries

KRC(U-3&4) Monthly Knowledge Sharing Meeting-KSM


(May-22 To July-22)

Organized by:
Central-IE
Manufacturing Audit & Central Costing

1-2
Objectives of the Meeting:

To review factory last month performance


To understand our present position against
management expectation
To know about the scope of improvement
To set next month performance target

1-3
Key Discussion points:
1. Planning, Production & IE KPI:
Monthly Target Vs. achievement status
Monthly Machine utilization %
Monthly Efficiency %
Monthly Profit/Loss status
Monthly Revenue status
On-Time Delivery Status
Monthly Short/excess shipment status
Monthly Style Wise Line Plan Analysis
Monthly PCD Hit rate status
Monthly NPT Analysis
Operators Skill Matrix Analysis

2. Human Resource Department KPI:


 Monthly worker absenteeism status
3. Quality Assurance Department KPI:
 Monthly Final inspection pass status
 Monthly OQL% status
Monthly DHU% status
Monthly Top 5 Defects analysis
Fail report analysis against Top 5 Defect

4. Set next month performance target


1-4
1. Planning, Production & IE KPI:

1-5
Overview of Performance:

1-6
Month wise Plan & Floor Target Vs. Achievement status:

1-7
Month wise Machine utilization % :

1-8
Month wise efficiency %:

1-9
Month wise profit/Loss status (Excluding Abnormal Loss) :

1-10
Month wise per Machine Plan Vs. Achieve Revenue status:

1-11
Month wise On Time Delivery status:

1-12
Month wise short/excess shipment status :

1-13
Root Causes Analysis:

1-14
Month wise Plan Vs. Actual Style Allocation Analysis (May-22):
ALLOCATION PLAN STYLE ANALYSIS ACTUAL RUNNING STYLE ANALYSIS
Avg qty % out Avg qty % out
Produced Produced
SMV Type Style Type Style Qty Plan Qty of total SMV Type Style Type Style Qty Produced Qty of total
Minute Minute
Produce Qty Produce Qty
<4.5 Very Basic 0 0 0 0.0% <4.5 Very Basic 1 19737 4386 0.7%

4.51-7.5 Basic 25 3401376 628332 86.2% 4.51-7.5 Basic 18 2946501 547901 85.8%

7.51-10.5 Semi Critical 3 813660 87000 11.9% 7.51-10.5 Semi Critical 4 597419 63195 9.9%

10.51-15 Heavy Semi Critical 1 48289 3328 0.5% 10.51-15 Heavy Semi Critical 1 64134 4420 0.7%

15.1-20 Critical 1 173884 10344 1.4% 15.1-20 Critical 3 325182 19035 3.0%

20.1- >=28 Heavy Critical 0 0 0 0.0% 20.1- >=28 Heavy Critical 0 0 0 0.0%

6.09 Basic 30 4437209 729004 100.0% 6.19 Basic 27 3952974 638937 100.0%

1-15
Month wise Plan Vs. Actual Style Allocation Analysis (June-22):
ALLOCATION PLAN STYLE ANALYSIS ALLOCATION PLAN STYLE ANALYSIS
Avg qty % out Avg qty % out
Produced Produced
SMV Type Style Type Style Qty Plan Qty of total SMV Type Style Type Style Qty Produced Qty of total
Minute Minute
Produce Qty Produce Qty
<4.5 Very Basic 3 309995 69500 6.7% <4.5 Very Basic 4 332628 74549 7.6%

4.51-7.5 Basic 18 4763956 889469 85.6% 4.51-7.5 Basic 19 4490990 835091 85.1%

7.51-10.5 Semi Critical 1 355779 45730 4.4% 7.51-10.5 Semi Critical 2 258906 32089 3.3%

10.51-15 Heavy Semi Critical 1 505287 34500 3.3% 10.51-15 Heavy Semi Critical 1 523155 35720 3.6%

15.1-20 Critical 0 0 0 0.0% 15.1-20 Critical 2 73223 3840 0.4%

20.1- >=28 Heavy Critical 0 0 0 0.0% 20.1- >=28 Heavy Critical 0 0 0 0.0%

5.71 Basic 23 5935017 1039199 100.0% 5.79 Basic 28 5678902 981289 100.0%

1-16
Month wise Plan Vs. Actual Style Allocation Analysis (July-2022):

Avg qty % out Avg qty % out


Produced Produced
SMV Type Style Type Style Qty Plan Qty of total SMV Type Style Type Style Qty Produced Qty of total
Minute Minute
Produce Qty Produce Qty
<4.5 Very Basic 3 148586 33740 5.5% <4.5 Very Basic 4 128869 29746 6.2%

4.51-7.5 Basic 12 2244295 421120 68.1% 4.51-7.5 Basic 18 1691691 319402 66.1%

7.51-10.5 Semi Critical 4 671156 86250 14.0% 7.51-10.5 Semi Critical 4 558925 71768 14.8%

10.51-15 Heavy Semi Critical 4 996253 77000 12.5% 10.51-15 Heavy Semi Critical 4 810235 62479 12.9%

15.1-20 Critical 0 0 0 0.0% 15.1-20 Critical 0 0 0 0.0%

20.1- >=28 Heavy Critical 0 0 0 0.0% 20.1- >=28 Heavy Critical 0 0 0 0.0%

6.57 Basic 23 4060289 618110 100.0% 6.60 Basic 30 3189719 483395 100.0%

1-17
Operators Skill Matrix Analysis :
KRC (U-3&4) Operator Skill Matrix
NO OF PERCENTAGE PERCENTAGE
GRADE GRADING
OPERATOR (%) (%)
A+ 0 0%
A 21 5% A 15%
A- 46 10%
B+ 110 24%
B 138 30% B 73%
B- 90 19%
C+ 30 6%
C 24 5% C 12%
C- 3 1%
D 0 0% D 0%
462 100% 100%

1-18
STYLE CHANGING ANALYSIS (LINE PLAN VS.EXECUTION COMPARISON OF KRC-U-3)
PLAN STYLE RUNNING HEAT MAP,KRC,U-3 Unit 3
No of
Line 2-Jul 3-Jul 4-Jul 5-Jul 6-Jul 7-Jul 16-Jul 17-Jul 18-Jul 19-Jul 20-Jul 21-Jul 23-Jul 24-Jul 25-Jul 26-Jul 27-Jul 28-Jul 30-Jul 31-Jul
Style
A LEGGING LEGGING LEGGING LEGGING LEGGING LEGGING LEGGING LEGGING LEGGING 1

B LEGGING LEGGING LEGGING LEGGING LEGGING LEGGING LEGGING LEGGING LEGGING LEGGING LEGGING LEGGING LEGGING LEGGING LEGGING LEGGING LEGGING LEGGING LEGGING LEGGING 2

C LEGGING LEGGING LEGGING LEGGING T-shirt T-shirt T-shirt 2

D T-shirt T-shirt T-shirt T-shirt T-shirt T-shirt T-shirt T-shirt T-shirt T-shirt T-shirt T-shirt T-shirt T-shirt T-shirt T-shirt T-shirt T-shirt T-shirt T-shirt 2

E HOODY HOODY HOODY HOODY HOODY HOODY HOODY HOODY LEGGING LEGGING LEGGING LEGGING LEGGING LEGGING LEGGING LEGGING LEGGING LEGGING LEGGING LEGGING 2

F TANK TOPTANK TOP T-shirt T-shirt T-shirt T-shirt T-shirt T-shirt 2

G JACKET JACKET JACKET JACKET JACKET JACKET JACKET JACKET JACKET JACKET JACKET JACKET JACKET JACKET JACKET JACKET JACKET JACKET JACKET JACKET 2

H TANK TOPTANK TOPTANK TOPTANK TOP 1

Style Running Heat Map- KRC U-3 Unit- 3


Number of No. of
Line 1-Jul 2-Jul 3-Jul 4-Jul 5-Jul 6-Jul 7-Jul 16-Jul 17-Jul 18-Jul 19-Jul 20-Jul 21-Jul 23-Jul 24-Jul 25-Jul 26-Jul 27-Jul 28-Jul 30-Jul 31-Jul styling style
Runned Runned
HOODY HOODY HOODY HOODY HOODY HOODY HOODY HOODY HOODY
A WITH ZIP WITH ZIP WITH ZIP WITH ZIP WITH ZIP WITH ZIP WITH ZIP WITH ZIP WITH ZIP
JACKET JACKET JACKET JACKET JACKET JACKET JACKET JACKET JACKET JACKET JACKET JACKET 2 3

LADIES
B T-SHIRT T-SHIRT T-SHIRT T-SHIRT T-SHIRT T-SHIRT T-SHIRT T-SHIRT T-SHIRT T-SHIRT T-SHIRT T-SHIRT T-SHIRT T-SHIRT T-SHIRT T-SHIRT T-SHIRT
DRESS
TANK TOP TANK TOP TANK TOP 3 5

C LEGGING LEGGING LEGGING T-SHIRT T-SHIRT T-SHIRT T-SHIRT T-SHIRT T-SHIRT T-SHIRT T-SHIRT T-SHIRT T-SHIRT T-SHIRT T-SHIRT T-SHIRT T-SHIRT T-SHIRT T-SHIRT T-SHIRT T-SHIRT 2 3

C2 LEGGING LEGGING LEGGING LEGGING LEGGING LEGGING LEGGING - - - - - - - - - - - - - - 1 1

D LEGGING LEGGING LEGGING LEGGING LEGGING LEGGING LEGGING LEGGING LEGGING LEGGING LEGGING LEGGING LEGGING LEGGING LEGGING T-SHIRT T-SHIRT T-SHIRT T-SHIRT T-SHIRT T-SHIRT 2 3

E T-SHIRT T-SHIRT T-SHIRT T-SHIRT T-SHIRT T-SHIRT T-SHIRT - LEGGING LEGGING LEGGING LEGGING LEGGING LEGGING JACKET JACKET JACKET - - - - 3 3

E+F - - - - - - - - - - - - - - - - - JACKET JACKET JACKET JACKET 1 1

F TANK TOP TANK TOP LEGGING LEGGING TANK TOP TANK TOP TANK TOP TANK TOP TANK TOP TANK TOP TANK TOP TANK TOP TANK TOP - - - - - - - - 2 4

HOODY HOODY HOODY


G WITH ZIP WITH ZIP WITH ZIP
JACKET JACKET JACKET JACKET JACKET JACKET JACKET JACKET JACKET JACKET JACKET JACKET JACKET JACKET JACKET JACKET JACKET JACKET 2 3

H LEGGING LEGGING LEGGING LEGGING LEGGING LEGGING LEGGING LEGGING LEGGING LEGGING LEGGING LEGGING LEGGING LEGGING LEGGING LEGGING LEGGING LEGGING LEGGING LEGGING LEGGING 1 2
STYLE CHANGING ANALYSIS (LINE PLAN VS.EXECUTION COMPARISON OF KRC-U-4)
PLAN STYLE RUNNING HEAT MAP,KRC,U-4 Unit 4
No of
Line 2-Jul 3-Jul 4-Jul 5-Jul 6-Jul 7-Jul 16-Jul 17-Jul 18-Jul 19-Jul 20-Jul 21-Jul 23-Jul 24-Jul 25-Jul 26-Jul 27-Jul 28-Jul 30-Jul 31-Jul
Style
A T-shirt T-shirt T-shirt T-shirt T-shirt T-shirt T-shirt T-shirt T-shirt T-shirt T-shirt T-shirt T-shirt T-shirt T-shirt 2

B T-shirt T-shirt T-shirt T-shirt T-shirt T-shirt T-shirt T-shirt T-shirt T-shirt T-shirt T-shirt 2

C T-shirt T-shirt T-shirt T-shirt T-shirt T-shirt T-shirt T-shirt T-shirt T-shirt T-shirt T-shirt T-shirt T-shirt T-shirt T-shirt T-shirt T-shirt T-shirt T-shirt 2

D T-shirt T-shirt T-shirt T-shirt T-shirt T-shirt T-shirt T-shirt T-shirt 3


LADIES LADIES LADIES
E DRESS DRESS DRESS
T-shirt T-shirt T-shirt T-shirt TANK TOPTANK TOPTANK TOPTANK TOPTANK TOPTANK TOP 2

F T-shirt T-shirt T-shirt T-shirt T-shirt T-shirt T-shirt T-shirt T-shirt T-shirt T-shirt T-shirt T-shirt T-shirt 1

G T-shirt T-shirt T-shirt T-shirt T-shirt T-shirt T-shirt T-shirt T-shirt T-shirt JOGGER JOGGER JOGGER JOGGER JOGGER JOGGER JOGGER JOGGER JOGGER JOGGER 2

Style Running Heat Map- KRC U-4 Unit- 4


Number of No. of
Line 1-Jul 2-Jul 3-Jul 4-Jul 5-Jul 6-Jul 7-Jul 16-Jul 17-Jul 18-Jul 19-Jul 20-Jul 21-Jul 23-Jul 24-Jul 25-Jul 26-Jul 27-Jul 28-Jul 30-Jul 31-Jul styling style
Runned Runned

A T-SHIRT T-SHIRT T-SHIRT T-SHIRT T-SHIRT T-SHIRT T-SHIRT T-SHIRT T-SHIRT T-SHIRT T-SHIRT T-SHIRT T-SHIRT T-SHIRT T-SHIRT T-SHIRT T-SHIRT T-SHIRT T-SHIRT T-SHIRT T-SHIRT 1 4

B T-SHIRT T-SHIRT T-SHIRT T-SHIRT T-SHIRT T-SHIRT T-SHIRT T-SHIRT T-SHIRT T-SHIRT T-SHIRT T-SHIRT T-SHIRT T-SHIRT T-SHIRT T-SHIRT T-SHIRT T-SHIRT T-SHIRT T-SHIRT T-SHIRT 1 3

C T-SHIRT T-SHIRT T-SHIRT T-SHIRT T-SHIRT T-SHIRT T-SHIRT T-SHIRT T-SHIRT T-SHIRT T-SHIRT - - - - - - - - - - 1 2

C2 - - - - - - - - - - - - - - - - - - - - - 0 0

D T-SHIRT T-SHIRT T-SHIRT T-SHIRT T-SHIRT T-SHIRT T-SHIRT T-SHIRT T-SHIRT T-SHIRT T-SHIRT T-SHIRT T-SHIRT T-SHIRT T-SHIRT T-SHIRT T-SHIRT T-SHIRT T-SHIRT T-SHIRT T-SHIRT 1 4

E JOGGER JOGGER JOGGER JOGGER JOGGER T-SHIRT T-SHIRT - - JOGGER JOGGER T-SHIRT LEGGING LEGGING LEGGING LEGGING LEGGING LEGGING LEGGING LEGGING LEGGING 3 4

E+F - - - - - - - - - - - - - - - - - - - - - 0 0

F T-SHIRT T-SHIRT T-SHIRT T-SHIRT T-SHIRT T-SHIRT T-SHIRT T-SHIRT T-SHIRT T-SHIRT T-SHIRT T-SHIRT T-SHIRT T-SHIRT T-SHIRT T-SHIRT T-SHIRT T-SHIRT T-SHIRT T-SHIRT T-SHIRT 1 1

LADIES LADIES LADIES SHORT SHORT LADIES


G DRESS DRESS DRESS PANT
T-SHIRT
PANT
T-SHIRT T-SHIRT
DRESS
JOGGER JOGGER JOGGER JOGGER JOGGER JOGGER JOGGER JOGGER JOGGER T-SHIRT T-SHIRT T-SHIRT 4 6

H - - - - - - - - - - - - - - - - - - - - - 0 0
PCD Hit & Fail Status (May-22):

1-21
PCD Hit & Fail Status (June-22):

1-22
PCD Hit & Fail Status (July-22):

1-23
Month wise NPT status :
Non Total Earning
NPT Value in NPT (Man- Revenue/MC
Productive NPT Value NPT% NPT (Pcs) NPT MC/Day (Including NPT
Tk. Hour) (Without NPT)
Minute Value)

63205 Min. $ 4,424.35 367,221৳ 0.97% 10216 Pcs 1053 5.2 MC $ 343,893.84 BDT 86562

136475 Min. $ 9,553.25 792,920৳ 1.63% 23582 Pcs 2275 9.1 MC $ 473,161.80 BDT 92624

62182 Min. $ 4,352.74 361,277৳ 1.07% 9424 Pcs 1036 5.6 MC $ 271,491.04 BDT 69293

261862 Min. $ 18,330.34 1,521,418৳ 1.26% 43222 Pcs 4364 6.6 MC $ 1,088,546.67 BDT 83739

1-24
NPT status (MAY-2022):

1-25
NPT status (JUNE-2022):

1-26
NPT status (JULY-2022):

1-27
2. Human Resource Department KPI:

1-28
Month wise worker absenteeism status :

1-29
Factors influencing on efficiency %:
1. Style Analysis : Allocating the styles in such a way that maximum line days can be
achieved.
2. PCD hit Rate : Ensure PCD to ensure right style line feeding at right time.
3. Set a standard Target : Target has to be as per feasibility learning curve to get
expected efficiency.
4. Production Monitoring : Ensure process wise production which leads to target
achievement of full line.
5. Line Balancing : Set right person at right place to get maximum utilization of
manpower and get output.
6. Operators Skill Matrix : Identify the right person as per process & requirement.
7. Operators Availability : Reduction of absenteeism to ensure operators availability
as per requirement.

1-30
SUMMARY OF TODAY DISCUSSION :
Order Execution Flow Chart

Order Confirmation

Fabric Delay
Sample Approval Planning Fabric & Accessories planning

File Handover PCD delay

Style Analysis during size set & PP Meeting

Cutting Plan

Print/Emb. Plan

Sewing Start Plan

Productivity Loss
Sewing Production

FRI Plan
1-31
3. Quality Assurance Department KPI:

1-32
Final Inspection Pass Status

1-33
Thank You