Api Training Classppt
Api Training Classppt
Together
API 570
In-service Inspection
Rating
Repair
Alterat
ion of
Piping
Syste
API 570
SCOPE
INSPECTION PLANS
S C O P E COVERS INSPECTION. . .
SERVICE
API 570
SCOPE-
INTENT
• PROCESS FLUIDS
• HYDROCARBONS
SCOPE
inspection intervals.
significant flow.
API 570
piping system to find conditions that could impact the piping systems’ ability
attachments
order to determine the structural integrity of the piping for continued service.
API 570
nature.
timing of the inspection activities for piping systems, which may include
design code calculations and code allowable stress that consider pressure,
piping systems while they are on-stream using NDE procedures to establish
process that is focused on inspection planning for piping systems for loss of
INSPECTION PLANS
An inspection plan shall be established for all piping systems within the
data.
API 570
INSPECTION PLANS
RBI
RBI can be used to determine inspection intervals and the type and
RBI
Probability Assessment
RBI
Consequence Assessment
RBI
defined in API 580. The RBI assessment shall also be updated each
time process or hardware changes are made or after any event occurs
INSPECTION PLANS
NOTE API 571 has a much more complete listing and description of
damage mechanisms experienced in the refining and petrochemical industry.
API 570
INSPECTION PLANS
Deadlegs
CUI
Fatigue Cracking
INSPECTION PLANS
API 570
General Types of Inspection & Surveillance
On-Stream Inspection
Thickness Measurement
Inspection
External Visual
Inspection
CUI Inspection
Supplemental Inspection
API 570
INSPECTION PLANS
CMLs
CMLs are specific areas along the piping circuit where inspections are to be
made.
The minimum thickness at each CML can be located by ultrasonic scanning or
radiography.
The rate of corrosion/ damage shall be determined from successive
measurements and the next inspection interval appropriately
established.
CMLs should be marked on inspection drawings and on the piping system to
allow repetitive measurements at the same CMLs. This recording
procedure provides data for more accurate corrosion rate
determination.
Careful identification of CMLs and examination points are necessary to
enhance the accuracy and repeatability of the data.
API 570
INSPECTION PLANS
UT and RT
As a general rule, each of the NDE techniques will have practical limits with
respect to accuracy .
API 570
INSPECTION PLANS
Other NDE Techniques for Piping Systems
Magnetic Particle
Liquid Penetrant
Flux Leakage
Eddy Current
Acoustic Emission
Thermography
Long Range UT
(GUL – Guided
API 570
General
Inspection Intervals
If RBI is not being used, the interval between piping inspections shall be established
and maintained using the following criteria:
Inspection Intervals
The owner/user or the inspector shall establish inspection intervals for thickness
measurements and external visual inspections and, where applicable, for internal
and supplemental inspections.
All process piping systems shall be categorized into different piping classes.
API 570
INTERVAL / FREQUENCY & EXTENT OF INSPECTION
Class 1
Services with the highest potential of resulting in an immediate emergency if a leak were to
Services not included in other classes are in Class 2. This classification includes the majority
Class 3
Services that are flammable but do not significantly vaporize when they leak and are not
maximum intervals listed in Table 2 to evaluate items such as those in API 574.
API 570
circuit.
INTERVAL / FREQUENCY & EXTENT OF INSPECTION
Recommended Maximum Inspection Intervals API 570
Type of Circuit Thickness Measurements Visual External
S/A b By class
NOTE Thickness measurements apply to systems for which CMLs have been established in accordance with 5.6.
a Inspection intervals for potentially corrosive injection/mix points can also be established by a valid RBI analysis in accordance with API 580.
b See API RP 574 for more information on S/A interfaces.
INTERVAL / FREQUENCY & EXTENT OF INSPECTION
Recommended Maximum Inspection Intervals API 570
1 75% 50%
2 50% 33%
3 25% 10%
4 Optional Optional
API 570
INSPECTION DATA EVALUATION, ANALYSIS & RECORDING
Long term and short term corrosion rates should be compared to see
which results in the shortest remaining life as part of the data assessment.
API 570
INSPECTION DATA EVALUATION, ANALYSIS & RECORDING
MAWP Determination
The wall thickness used in these computations shall be the actual thickness as
determined by inspection minus twice the estimated corrosion loss before the
The required thickness of a pipe shall be the greater of the pressure design
thickness or the structural minimum thickness.
Inspection History
Fitness-For-Service Assessment
API 510
External Inspection
Internal Inspection
Inspection Intervals
Together