0% found this document useful (0 votes)
639 views

Weekly Plan - W46 2023 - Ext

This weekly plan document outlines production targets and schedules for week 46 (12-18 November 2023). It includes a review of the previous week's monitoring of elevations, slopes, and material movement. The plan forecasts moving over 91,000 bank cubic meters of material using loaders and haulers over a 7 day period. Distances and cycle times for haulers between the mine face and disposal areas are also scheduled. Standard operating hours and downtime allowances are allocated for the week.

Uploaded by

Doni Prasetyo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
639 views

Weekly Plan - W46 2023 - Ext

This weekly plan document outlines production targets and schedules for week 46 (12-18 November 2023). It includes a review of the previous week's monitoring of elevations, slopes, and material movement. The plan forecasts moving over 91,000 bank cubic meters of material using loaders and haulers over a 7 day period. Distances and cycle times for haulers between the mine face and disposal areas are also scheduled. Standard operating hours and downtime allowances are allocated for the week.

Uploaded by

Doni Prasetyo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
You are on page 1/ 15

WEEKLY PLAN

WEEK 46

12 – 18 November 2023
Contents

01 WEEKLY REVIEW

02 WEEKLY PLAN
01
REVIEW WEEK 45
Sequence November VS Progres Survey Week 2
Sequence November VS Progres Survey Week 2

Keterangan Disposal Keterangan Pit


Coal Expose

268.042 MT

32.269 MT
Monitoring Elevasi Air
Monitoring Lereng
M 01 M 02
DATE NORTHING EASTHING ELEVASI PERGERAKAN NORTHING EASTHING ELEVASI PERGERAKAN
DATA AWAL 9759415.922 361974.76 29.221 9759225.958 361621.693 37.343
01-Oct-23
02-Oct-23
03-Oct-23 9759415.927 361974.756 29.226 0.008 9759225.976 361621.688 37.343 0.019
04-Oct-23 9759415.933 361974.758 29.231 0.015 9759225.929 361621.726 37.365 0.049
05-Oct-23 9759415.923 361974.755 29.232 0.012 9759225.984 361621.684 37.354 0.030
06-Oct-23 9759415.925 361974.754 29.235 0.016 9759225.987 361621.688 37.358 0.033
07-Oct-23
08-Oct-23 9759415.931 361974.759 29.226 0.010 9759225.978 361621.690 37.348 0.021
09-Oct-23
10-Oct-23 9759415.934 361974.760 29.225 0.013 9759225.943 361621.715 37.347 0.027
11-Oct-23 9759415.924 361974.757 29.223 0.004 9759225.978 361621.691 37.347 0.020
12-Oct-23
13-Oct-23
14-Oct-23
15-Oct-23
16-Oct-23
17-Oct-23
18-Oct-23
19-Oct-23
20-Oct-23
21-Oct-23
22-Oct-23
23-Oct-23
24-Oct-23
25-Oct-23
26-Oct-23
27-Oct-23
28-Oct-23
29-Oct-23
30-Oct-23
02
PLAN WEEK 46
SPO

12-Nov 13-Nov 14-Nov 15-Nov 16-Nov 17-Nov 18-Nov Total


Sun Mon Tue Wed Thu Fri Sat forecast

STANDAR PARAMETER OPERATION


Day 1 1 1 1 1 1 1 7
Calender Hours hrs 24 24 24 24 24 24 24 168
-
days - - - - - - - 0
Holiday
hrs - - - - - - -
Hours After Holiday hrs 24 24 24 24 24 24 24 168
Rain Hours hrs 3.52 3.52 3.52 3.52 3.52 3.52 3.52 25
Slippery Hours hrs 1.76 1.76 1.76 1.76 1.76 1.76 1.76 12
Rain & Slippery hrs 5.3 5.3 5.3 5.3 5.3 5.3 5.3 37

Standby Hours Rest & Meal 2.0 hrs/day 2.00 2.00 2.00 2.00 2.00 2.00 2.00 14
Friday Praying 1.0 hrs/week - - - - - 1.00 - 1
Fasting 2.0 hrs/day -
Fuel & Lube 0.15 hrs/day 0.15 0.15 0.15 0.15 0.15 0.15 0.15 1
Safety Meeting 0.50 hrs/week - - - 0.5 - - - 0.5
Shift Change 1.0 hrs/day 1.0 1.0 1.0 1.0 1.0 1.0 1.0 7
Move/Relocate 0.08 hrs/day 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.6
Other - - - - - - - -
Total hrs 3.23 3.23 3.23 3.73 3.23 4.23 3.23 24
Total Stanby Hours hrs 8.51 8.51 8.51 9.01 8.51 9.51 8.51 61

Hours Before PA hrs 15.5 15.5 15.5 15.0 15.5 14.5 15.5 107
Plan Produksi

Jumlah PA UA SPO Forecast Day EWH Distance Prod'ty Prod.


Description Disposal

Material

Unit % % hrs/day days hrs mtr bcm/hrs bcm


Loader
CAT 340 4 90% 15 7 385 240 92,400 OB
92,400
Hauler
Fleet 1 4 90% 15 7 385 800 67 25,746 IPD BL2 OB

Fleet 2 4 90% 15 7 385 700 73 27,984 IPD BL2 OB

Fleet 3 3 90% 15 7 289 700 73 20,988 IPD BL2 OB

Fleet 4 2 90% 15 7 192 500 88 16,938 IPD BL2 OB

91,700
Fleet Position
Volume
OB 25,746

Volume

Volume
OB 16,938
Coal Exposed 18,000
Volume

CAPACITY SEQUENCE
OB 91,700 100,870.00
Coal Exposed 18,000
Distance 691
Distance

700/800 m

500 m

700/800 m

SUMPRODUCT: 691 m
Distance

12-Nov 13-Nov 14-Nov 15-Nov 16-Nov 17-Nov 18-Nov


Sun Mon Tue Wed Thu Fri Sat
Jalan BL2 Fase 2
EX2014
Pit Service

` Ket: Shift 1 & 2


Shift 1
Shift 2
THANK
YOU

; A N V

Head Office Address :


Jalan Berlian II No. 63
Cilandak Bar at,
Cilandak Jakart a
ndon - 12430
ISelatan
esia
P h o n e : +6221- 29126118
Email : [email protected]

You might also like