Risk Mitigation Nov'23
Risk Mitigation Nov'23
Product Apr’23 May’23 Jun’23 July’23 Aug’23 Sep’23 Oct’23 Nov’23 Dec’23
- Automat &
Assembly Oil hole Gauges availability, Identification
Piston Marking
Process drilling
Fine Boring Surface Treatment
calibration & handling management
- Packing
Engine - Leak Testing Friction Seat Eddy current Centre less Identification
Groove Grinding Washing
Valve - Packing Welding Grinding testing Grinding management
1
4.0 Quality Risk Assessment Summary - Oct’23 : Engine Valve
Product Risk Assessment area Apr’23 Mar’23 Apr’23 May’23 Jun’23 Jul’23 Aug’23 Sep’23 Oct’23 Nov’23
Leak Testing 83% 89% 89% 91% 89% 94% 95% 94% - 76%
Engine
Valve
Auto-gauging NA NA 80%
85% 85% 93% 93% 93% - -
Product Risk Assessment area Mar’23 Apr’23 May’23 Jun’23 Jul’23 Aug’23 Sep’23 Oct’23 Nov’23
Gauges availability,
calibration & handling
NA NA NA NA NA NA NA 79% 89%
Surface Treatment NA NA NA NA NA 86% 98% 96% 98%
Fine Boring NA NA NA NA NA 86% 86% 91% 98%
Piston Oil Hole drilling Process NA NA NA 92% 99% 99% 99% 99% 99%
Assembly Process NA NA 67% 76% 82% 82% 89% 90% 95%
Packing section NA 66%
74%
74%
76%
83% 87% 89% 91%
Automat & Marking 86% 89% 91% 94% 96% 96% 96% 98% 91%
Product Risk Assessment area Feb’23 Mar’23 Apr’23 May’23 Jun’23 Jul’23 Aug’23 Sep’23 Oct’23 Nov’23
1
Availability, Adequacy and display of Gauge calibration rule at work
stations 75% 85%
2 Awareness for usage of calibrated gauge on lines 85% 100%
3 Availability of required gauges on line 85% 95%
4 Adherence to usage of calibrated gauges with required colour coding 80% 90%
5 Gauge condition monitoring in lines 80% 85%
6 - Non
Awareness availability
among of gauge
associates for proper onthrough
inspection inspection
station gauges 75% 80%
- Inspection status not identified properly on fixtures
7 Proper calibration identification marking on fixtures 75% 85%
Overall Compliance %age 79% 89%
Criteria:-
Score≤ 80
Score> 80% but < 100% Score = 100%
8
4.4 KS Grinding M/c: Ring Plant
Criteria:- Score≤ 80% Score> 80% but < 100% Score = 100% 9