0% found this document useful (0 votes)
15 views9 pages

Risk Mitigation Nov'23

The document contains quality risk mitigation audit plans and risk assessment summaries for various products - piston, engine valve, and rings - from April 2023 to November 2023. Key details include: - Audit plans list the processes and activities to be audited monthly for each product. - Risk assessment summaries provide compliance percentages for each process area monthly, identifying risks as high (<=80%), medium (>80% but <100%) or low/acceptable (=100%). - The November 2023 washing process check list for engine valve identifies some medium risks around mix-up valve availability and water temperature that need addressed.

Uploaded by

VIKAS TIWARI
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
15 views9 pages

Risk Mitigation Nov'23

The document contains quality risk mitigation audit plans and risk assessment summaries for various products - piston, engine valve, and rings - from April 2023 to November 2023. Key details include: - Audit plans list the processes and activities to be audited monthly for each product. - Risk assessment summaries provide compliance percentages for each process area monthly, identifying risks as high (<=80%), medium (>80% but <100%) or low/acceptable (=100%). - The November 2023 washing process check list for engine valve identifies some medium risks around mix-up valve availability and water temperature that need addressed.

Uploaded by

VIKAS TIWARI
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
You are on page 1/ 9

3.

0 Quality Risk Mitigation Audit Plan (FY’23)

Product Apr’23 May’23 Jun’23 July’23 Aug’23 Sep’23 Oct’23 Nov’23 Dec’23

- Automat &
Assembly Oil hole Gauges availability, Identification
Piston Marking
Process drilling
Fine Boring Surface Treatment
calibration & handling management
- Packing

CNC Laser Side Face


Ring Packing
Turning Marking
Gap Grinding CRI
Grinding
Rail cut off KS Grinding Gas Nitriding

Engine - Leak Testing Friction Seat Eddy current Centre less Identification
Groove Grinding Washing
Valve - Packing Welding Grinding testing Grinding management

1
4.0 Quality Risk Assessment Summary - Oct’23 : Engine Valve

Product Risk Assessment area Apr’23 Mar’23 Apr’23 May’23 Jun’23 Jul’23 Aug’23 Sep’23 Oct’23 Nov’23

Centerless Grinding NA NA NA NA NA NA NA NA 90%  90% 


Groove Grinding NA NA NA NA NA NA NA 89%  86%  86% 
Eddy Current Testing NA NA NA NA NA 94%  100%  New check
points added

Leak Testing 83%  89%  89%  91%  89%  94%  95%  94%  - 76% 
Engine
Valve
Auto-gauging NA NA 80%
 85%  85%  93%  93%  93%  - -

Packing section NA NA 74%


 89%  96%  96%  94%  95%  - -

Friction Welding NA NA NA 92%  96%  98%  98%  98%  88%  -

Seat Grinding NA NA NA NA 94%  94%  88%  89%  88%  88% 


Washing NA NA NA NA NA NA NA NA NA 92% 
Criteria:-  If ≤ 80 %  If > 80 % and < 100%  If = 100%
2
4.0 Quality Risk Assessment Summary - Nov’23 : Piston

Product Risk Assessment area Mar’23 Apr’23 May’23 Jun’23 Jul’23 Aug’23 Sep’23 Oct’23 Nov’23

Gauges availability,
calibration & handling
NA NA NA NA NA NA NA 79%  89% 
Surface Treatment NA NA NA NA NA 86%  98%  96%  98% 
Fine Boring NA NA NA NA NA 86%  86%  91%  98% 
Piston Oil Hole drilling Process NA NA NA 92% 99%  99%  99%  99%  99% 
Assembly Process NA NA 67%  76%  82%  82%  89%  90%  95% 
Packing section NA 66%
 74%
 74%
 76%
 83%  87%  89%  91% 
Automat & Marking 86%  89%  91%  94%  96%  96%  96%  98%  91% 

Criteria:-  If ≤ 80 %  If > 80 % and < 100%  If = 100%


3
4.0 Quality Risk Assessment Summary - Nov’23 : Rings

Product Risk Assessment area Feb’23 Mar’23 Apr’23 May’23 Jun’23 Jul’23 Aug’23 Sep’23 Oct’23 Nov’23

Rail Cut Off NA NA NA NA NA NA NA NA 90%  100% 


Side Face Grinding NA NA NA NA NA NA NA 90%  100%
 100%

CRI NA NA NA NA NA NA 80%
 96%  100%  100%

Gap Grinding M/c NA NA NA NA NA 86%  100%  100%  100%  100%

Rings

CNC Profile Turning NA 48%  78%  97%  99%  100%


 100%  100%  100%  100% 
Packing section 78%  83%  100%  100%  100%  100%  100%  100%  100%  100% 
Laser Marking NA NA NA NA 92%  100%  100%  100%
 100%  100% 
KS Grinding NA NA NA NA NA NA NA NA NA 94% 
Criteria:-  If ≤ 80 %  If > 80 % and < 100%  If = 100%
4
4.1 Washing process : Engine Valve
Sr. No. Check Points Compliance% Nov’23
1 Route card availability 100% 
2 M/C check sheet availability 100% 
3 Mix-up valve (Should not be available) 50% 
4 Alkali pH as per check sheet (Min.8) 100% 
5 Alkali Temp. as per check sheet (70±10°) 100% 
6 Water Temp. as per check sheet (70±10°) 50% 
7 No blockage of water suction filter 100% 
8 No blockage of alkali suction filter 100% 
9 Nozzle cleaning no blockage 100% 
10 Water tank cleaning (Should be cleaned) 100% 
- Model mix up
11 No blockage of Blower filter
- Process parameter not adhered like water temp.
100% 
12 No Oil & water leakage 100% 
Overall Compliance %age 92% 
Criteria:-
 Score≤ 80%
  Score> 80% but < 100%   Score = 100% 5
4.1 Washing process : Engine Valve
Sr. No. Check Points Compliance% Nov’23
1 Route card availability 100% 
2 M/C check sheet availability 100% 
3 Mix-up valve (Should not be available) 50% 
4 Alkali pH as per check sheet (Min.8) 100% 
5 Alkali Temp. as per check sheet (70±10°) 100% 
6 Water Temp. as per check sheet (70±10°) 50% 
7 No blockage of water suction filter 100% 
8 No blockage of alkali suction filter 100% 
9 Nozzle cleaning no blockage 100% 
10 Water tank cleaning (Should be cleaned) 100% 
11 No blockage of Blower filter 100% 
12 No Oil & water leakage 100% 
Overall Compliance %age 92% 
Criteria:-
 Score≤ 80%
  Score> 80% but < 100%   Score = 100% 6
4.2 Leak Testing : Engine Valve
Compliance
Sr. No. Check Points
(Nov’23)
1 Master valve availability (Seat Roundness) 100% 
2 Master valve availability (Effective length-SOR) 100% 
3 Pressure drop during testing 100% 
4 Testing time 100% 
5 Charging pressure/Judgment press 86% 
6 Hammer pressure 100% 
7 LT Fixture – Required model Vs Actual fixture used 100% 
8 Leak testing fixture life monitoring 0% 
9 Rubber pad condition (Circular shape , No damage & crack) 100% 
10 LT confirmatory marking unit (No ink overflow from base tray) 100% 
11 No taper Clamping of valve during confirmatory marking 100% 
12 No ink on output magazine/Chute 100% 
13 Insertion pressure more than spec. (0.45~0.55 MPa) 52% 
14 Pusher / ejector Pressure as per WI (0.2~0.3 MPa) 29% 
15 Pressure charging time (0.1 Sec.) 52% 
- No monitoring of LT fixture life
16 Head support dia. (OD Dia. +2.0 mm min) 14% 
- Process parameter not adhered like air insertion pressure, pusher pressure
17 No wear & tear - O ring 100% 
-
18 LT fixture Guide sizeMore clearance in LT fixture guide
(Clearance) 38% 
19 Valve tip alignment w.r.t. Ejector rod 86% 
Overall Compliance %age 76% 
Criteria:-
 Score≤ 80%   Score> 80% but < 100%   Score = 100% 7
4.3 Gauges availability, calibration & handling : Piston

Sr. No. Check Points Compliance% October’23 Compliance% November’23

1
Availability, Adequacy and display of Gauge calibration rule at work
stations 75%  85% 
2 Awareness for usage of calibrated gauge on lines 85%  100% 
3 Availability of required gauges on line 85%  95% 
4 Adherence to usage of calibrated gauges with required colour coding 80%  90% 
5 Gauge condition monitoring in lines 80%  85% 
6 - Non
Awareness availability
among of gauge
associates for proper onthrough
inspection inspection
station gauges 75%  80% 
- Inspection status not identified properly on fixtures
7 Proper calibration identification marking on fixtures 75%  85% 
Overall Compliance %age 79% 89% 
Criteria:-
 Score≤ 80
  Score> 80% but < 100%   Score = 100%
8
4.4 KS Grinding M/c: Ring Plant

Sr. No. Check Points Compliance status Nov’23

1 Availability of latest WI and visual standard. 100% 


2 Input & Output location defined for trolley and inspection ring 100% 
3 Is the direction for placing the ring on the trolley fixed? 70% 
4 Rejection location available on each inspection table with rejection identification. 100% 
5 Display and adherence to Mix-up rule. 100% 
6 Is it supposed that there is no ring other than the designated place? 60% 
7 Process card holding location define on trolley. 100% 
8 Instrument calibration / verification status 100% 
9 Does identification using "under process" · "process finished" identification tag? 100% 
- Ring direction alignment rule not followed
10 Record available for rejection and good Qty.
- Rings kept without proper identification in WIP
100% 
11 Are there any storage for nonconforming products? 100% 
Overall Compliance %age 94%

Criteria:-  Score≤ 80%   Score> 80% but < 100%  Score = 100% 9

You might also like