Ms Project Training Refresher
Ms Project Training Refresher
• Length of Course
• 2 Hours
• Pre-requisite
• Basic Skills in Ms Project Scheduling
• Background in Project Management
• Training Level
• Refresher
Course Outline 3
• Introduction
• Interface
• Getting familiar with MS Project Interface
• New Project
• Creating new project
• Defaults
• Setting Project Start Date
• Manually Scheduled vs Auto Scheduled
• Calendar
• Creating custom Calendar
• Activities
• Summary, Milestone, Task
Course Outline 4
• Assigning Relationship
• FS, SS, SF, FF
• Constraints
• Network Diagram
• PERT/CPM
Early Start/Finish
• Late Start/Finish
• Float/Slack
• Custom Fields
• Actual % Complete (2 decimal places)
• Planned % Complete
• Custom Filters
Course Outline 5
• Baseline
• Setting up Baseline
• Tracking
• Updating Progress
• Filters
• Printing
Introduction 6
• What is Ms Project?
• Microsoft Project is the world's most popular project management software
designed to assist project managers in developing schedules, assigning
resources to tasks, tracking progress, managing budgets and analysing
workloads.
“micromanage”
Network Diagram 7
• Ribbon >> View Tab >> Network Diagram
• PERT (Project Evaluation and Review Technique) / CPM (Critical Path Method)
• A tool used to schedule and organize tasks or activities in a project by putting them together in an activity
network form
• Use of a network of precedence diagram which clearly indicates which of the activities must be performed in
the sequence and which can be performed independently with each other.
• Used to determine the Critical Path by calculating Early Dates, Late Dates, and Float/Slack
ES = 11 EF = 18 ES = 19 EF = 25
Duration = 8 Float/Slack = Duration = 7 Float/Slack =
days 0 days 0
LS = 11 LF = 18 LS = 19 LF = 25
Activity A Activity F
Activity
ES = 5 EF = 10 ES = 26 EF = 30
Early Start Early Finish
Duration = 6 Float/Slack = Duration = 5 Float/Slack =
Duration Float/Slack
days 0 days 0
Late Start Late Finish
LS = 5 LF = 10 LS = 26 LF = 30
Activity C Activity E
ES = 11 EF = 14 ES = 15 EF = 23
Duration = 4 Float/Slack = Duration = 9 Float/Slack =
days 2 days 2
LS = 13 LF = 16 LS = 17 LF = 25
Critical Path 9
Activity B Activity D
ES = 11 EF = 18 ES = 19 EF = 25
Duration = 8 Float/Slack = Duration = 7 Float/Slack =
days 0 days 0
LS = 11 LF = 18 LS = 19 LF = 25
Activity A Activity F
Activity
ES = 5 EF = 10 ES = 26 EF = 30
Early Start Early Finish
Duration = 6 Float/Slack = Duration = 5 Float/Slack =
Duration Float/Slack
days 0 days 0
Late Start Late Finish
LS = 5 LF = 10 LS = 26 LF = 30
ES = EF = ES = EF =
Duration = 15 Float/Slack = Duration = 10 Float/Slack =
days days
LS = LF = LS = LF =
Activity A Activity F
ES = August EF =
• Compute for the Float/Slack ES = EF =
19, 2019 • Determine the Critical Patch Duration = 20 Float/Slack =
Duration = 10 Float/Slack = • Consider 6 Days Work Week days
days
LS = LF =
LS = LF =
Activity C Activity E
ES = EF = ES = EF =
Duration = 25 Float/Slack = Duration = 18 Float/Slack =
days days
LS = LF = LS = LF =
Exercise 1 11
Activity B Activity D
13
Project Timeline
Column
Head
• Assign Relationships
• 3 Ways to Assign Relationships
• Highlight Activities >> Ribbon >> Task Tab >> Link the Selected Tasks
• Add Predecessor Column
• Double Click Activity >> Predecessors Tab
• Project Table >> Right Click at Column Head >> Insert Column >> choose Predecessors
Exercise 3 22
Constraints 23
• Ribbon >> Task Tab >> Information >> Advanced Tab
• Client wants to move-in on December 23, 2022 just in time for Christmas Day and New Year’s.
Put a Finish no Later than constraint on Move-in and change the constraint date to December 23,
2022. Observe the changes.
Custom Fields 25
• Actual % Complete
• Project Table >> Right Click at Column Head >> Custom Fields
• Rename Text 1 to Actual % Complete
• Under Custom Attributes, edit the Formula
• format([Actual Duration]/[Duration]*100,"#.00") & "%"
• Click Ok
• Under Calculation for task and group summary rows, click Use
formula
• Click Ok
• Project Table >> Right Click at Column Head >> Insert Column >>
choose Actual % Complete
Custom Fields 26
• Planned % Complete
• Project Table >> Right Click at Column Head >> Custom Fields
• Rename Number 1 to Duration in Days
• Under Custom Attributes, edit the Formula
• Val(ProjDurConv([Baseline Duration],pjDays))
• Click Ok
• Under Calculation for task and group summary rows, click Roll Up: Sum
• Click Ok
• Project Table >> Right Click at Column Head >> Insert Column
>> choose % Complete, Actual Start, and Actual Finish
Tracking 30
• https://niksprojects.com
• https://www.trainingconnection.com
-END- [email protected]