This Presentation is divided in to three main parts
1. Introduction to Diamer-Bhasha Dam
I. Etymology and Brief History
II. Location
2. Problem we are facing in it’s construction
3. Advantages of Diamer-Bhasha Dam
Brief History
• The dam site is situated near a place called "Bhasha" District Diamer
Gilgit Baltistan,
• In 2006 President Pervez Musharraf announced 5 multi purpose dam .
Diamer-Bhasha was suppose to be built in first phase.
• Project was formally approved in 2006 .
• Out of 35700 acres of land 17000 acres of land was made available to
WAPDA in 2013.
• Recently this project got fame when our former Chief Justice took an
initiative to raise funds for this dam
Location
The Dam will be located on
the River Indus in Northern
Pakistan, about 315 km
upstream of Tarbela Dam,
165 km downstream of the
Northern Areas capital of
Gilgit and 40 km
downstream of Chilas.
Problems
Problem in construction of Dam are
• Financing Difficulties
• Land Acquisition and Resettlement of affected people
• 100km KH being affected in the region
• NOC from India
Financing Difficulties
• This project require 14 billion dollars. World Bank and Asian
Bank are not giving loan for the construction of this dam
• Supreme Court of Pakistan took initiative to raise fund for its
construction and is able to raise Rs. 15,738,598 till now
Land Acquisition and
Resettlement of Affected
People
• Out of 35700 acres of land 17000 acres of land was made
available to WAPDA . Yet still to be acquired a lot for the its
construction.
• Resettlement of the affected people is also a major concern.
Around about 35 villages will be effected .
• 100km of Karakorum Highway will also drown.
India and China
• India be an unconditional adversary is as always putting
hurdles in construction of this as she is not giving us NOC
so that we can ask for more loan form international banks .
Indian is claiming this land to be in disputed territory and at
the same time waring us to built dam on its side to stop
Indus river.
• Whereas our iron brother China did offer to build us this dam
but under some strict condition
Advantages
• Addition to National Grid station
• Increase in life of Tarbela dam
• Increase in Water storage
• Tourist attraction
Addition to National Grid station
• National grid will be feed
by 4,500 MW on the
completion of project.
• Which will eventually
result in reduction of load
shedding
• Electricity prices will
eventually reduce , a big
relief to masses
Increase in water storage
capacity.
• Currently Pakistan has capacity to store water for only 30 days .
After its construction We will be able to store water for 48 days.
• Construction of this dam will increase life of Tarbela dam by 35
years
Tourist Attraction