0% found this document useful (0 votes)
22 views

Kelompok 2 Marshalling Terminal and RTU's

This document discusses the marshalling of terminals and RTUs at a facility. It includes a diagram of the network infrastructure showing connections between an operator workstation, engineer workstation, printer, PAGA system, data highway, FTE switches, RTUs, and various control cabinets. It also provides details on maintenance and troubleshooting of the DCS, marshalling terminal, transmitters, and other devices. Key parameters that can be viewed on the HMI include pressure, liquid level, and temperature.

Uploaded by

evelynkarina45
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
22 views

Kelompok 2 Marshalling Terminal and RTU's

This document discusses the marshalling of terminals and RTUs at a facility. It includes a diagram of the network infrastructure showing connections between an operator workstation, engineer workstation, printer, PAGA system, data highway, FTE switches, RTUs, and various control cabinets. It also provides details on maintenance and troubleshooting of the DCS, marshalling terminal, transmitters, and other devices. Key parameters that can be viewed on the HMI include pressure, liquid level, and temperature.

Uploaded by

evelynkarina45
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
You are on page 1/ 8

Marshalling Terminal and RTU’s

Kelompok 2
Martines Minarwaty 22500
Bian Febiyanto 22500
Zainal Anwar 22500
Nazarudin Faqih 22500
Ganjar Pangestiadi 22500
Fajar Muhamad Ramadan 2250017063
Gilang Rachmatulloh 22500
Operator Workstation Engineer Workstation
Printer PAGA
System

Data Highway/TCP/IP
The FTE infrastructure
(2 FTE Switches)

RTU PCS Cabin et SSS Cabinet FGS Cabinet

Flaring
PCS SSS FGS
Marshalling
Marshalling Marshalling Marshalling
Terminal Cabinet Cabinet
Cabinet
Shutdown
Gas Detector Valve
Equipment Equipment F&G System
Control Device Safety Device Device

Transmitter Control TransmitterShutdown


Flame
Valve Valve Deludge Valve Diesel Fire Water Pump
Detector
Data that can show at PCS :
 Pressure
 Level Liquid
 Temperature
Sample

“Close Drain” Vessel


Liquid Level Setting
Parameter
HHLL HLL LLL LLLL
HMI
Set Point 54” 48” 18” 12”
Process Alarm,
Process Alarm,
SSS take action to
SSS take action to
Mitigation or Action Pump Start Pump Stop Close SDV
Close SDV Upstream
Downstream of
of Vessel
Vessel
DCS
Maintenance Troubleshooting
● Update Firmware ●-
● Aman karena Redundant
● Tidak menimbulkan shutdown
Marshalling Terminal
Maintenance Troubleshooting
● Verify Tag Cable with Equipment ●-
● Replace Fuse if needed
● Replace Surge Arrestor if needed
Level, Pressure, or Temperature Transmitter
Maintenance Troubleshooting
● 3M PM Transmitter ● Pembacaan HMI tidak actual
● Verification Parameter ● Re-Calibration
● Calibrations ● Monitoring
● Cleaning Unit
● Check Fisik / Routing Cable
● Check Parameter
● Kabel terkelupas didalam Cable Gland
● Repair Cable
Do you have any questions?

Thanks! [email protected]
+62 858 *** ****

CREDITS: This presentation template was created by


Slidesgo, and includes icons by Flaticon and
infographics & images by Freepik

You might also like