Scheduling
Scheduling
Sequential Activities
AON format e.g.
Network Conventions
AON format AOA format
Constructing the Network Dummy activities
• AON used mostly in softwares
• Begin with START activity • AON don’t need dummy activities
• Add activities without precedences as nodes • AOA needs dummy activities
• There will always be one • Dummies are used to aid precedence via dashed
• May be more line
• Add activities that have those activities as precedences
• Continue
Sample of
Network
Construction
Show network design manually
Advantages
Gantt (Bar) Charts • Easily understood
• Developed by Henry L. Gantt
• Provide a picture of the current state of a project
• Shows planned and actual progress
Disadvantage
• Easy-to-read method to know the current status
• Difficult to follow complex projects
Microsoft Project AON Network
Use three time estimates:
• Optimistic (a)
• Pessimistic (b) (Why?)
• Most likely (m)
TE
a 4m b
6
b a
2
2
6
2
LS - ES or LF - EF
AON showing earliest and latest start and finish times and
critical (bolded path)
Precedence Diagramming Restrictions
• Finish to start Precedence Diagramming Conventions
• Start to start
• Finish to finish
• Start to finish
Gantt Chart
AON Network
Microsoft Project Calendar
Uncertainty of Project Completion Time
Example
• Calculations are based on 1% chance of beating
estimates
• Calculations can also be based on 5% or 10%
Z
(D )
50 43
7
1.22 • Changing the percentage requires changing the
2 33 5.745 formulae for variance
• When using 5%, the divisor changes to 3.29
• When using 10%, the divisor changes to 2.56
D Z 43 5.7451.645 52.45
Risk Analysis Using Simulation with Crystal Ball
Incorporating Costs into the Simulation Analysis
Traditional Statistics or Simulation?