Group 2 Total Project Cost
Group 2 Total Project Cost
PROJECT
COST
Kurt Faustino
Marc Arvin Legaspi
01
PROFESSIONAL
ENGINEERING
COST
PROFESSIONAL ENGIEERING COST
REFERS TO THE EXPENSES INCURRED
FOR THE SERVICES PROVIDED BY LICENSED
PROFESSIONAL ENGINEERS. THESE COSTS
COVER A WIDE RANGE OF ACTIVITIES
RELATED TO ENGINEERING PROJECTS,
INCLUDING DESIGN, ANALYSIS,
CONSULTATION, PROJECT MANAGEMENT,
PROFESSIONAL ENGIEERING COST
EXAMPLE:
A HOMEOWNER PLANS TO BUILD A SMALL
SHED IN THEIR BACKYARD AND NEEDS TO
DETERMINE THE SOIL'S BEARING CAPACITY TO
ENSURE THE FOUNDATION CAN SUPPORT THE
STRUCTURE. THEY HIRE A LOCAL ENGINEERING
FIRM TO CONDUCT SOIL TESTING AND PROVIDE A
REPORT ON THE SOIL'S BEARING CAPACITY. THE
PROFESSIONAL ENGIEERING COST
LABOR COST: PHP 3500/HOUR
2500(8) = PHP 28,000
MATERIAL COST: ESTIMATED EQUIPMENT AND
MATERIAL COST IS PHP 15,000
OVERHEAD EXPENCES: 15% OF THE LABOR COST
28,000(0.15) = PHP 4,200
TOTAL COST: PHP 47,200
02
CONSTRUCTION
COST
CONSTRUCTION COST
IT REFERS TO THE TOTAL EXPENSE
INCURRED IN COMPLETING A
CONSTRUCTION PROJECT. IT ENCOMPASSES
ALL COSTS ASSOCIATED WITH THE
PROJECT, INCLUDING SUPERVISION,
MATERIALS, SUPPLIES, LABOR, TOOLS,
EQUIPMENT, TRANSPORTATION, AND OTHER
FACILITIES UTILIZED
CONSTRUCTION COST
THERE ARE FOUR MAIN ELEMENTS THAT MAKE UP
CONSTRUCTION COSTS.
COST OF MATERIALS – IT REFERS TO THE EXPENSES INCURRED
IN ACQUIRING THE NECESSARY RAW MATERIALS AND SUPPLIES
TO BUILD STRUCTURES
real estate and land acquisition fees- various costs associated with
closing on an investment property. The fee is paid from a buyer to a
lender and can include expenses like underwriting, agent commissions,
and construction charges.