Refinery
Subcontract For Construction of Site Office for
KNPC at MAA
Project Status as on: 4th Sep 2021
1. PACKAGE DETAILS
2. PROJECT SYNOPSIS
SCOPE OF WORKS:
Design & Engineering of Site Offices, Car Park, Electrical (Small Power & Lighting),
Plumbing, Air-conditioning (Split AC Type), Sanitary, Fire alarm,
Data/Telecom(Passive Components only).
External Works: Car park, walkway, water piping, OH Tank, Sewage System, Laying
of Milled Asphalt, Electrical power cable connection with existing facility, Fire alarm
connectivity with existing system.
Date of Date of
Approva
Description of drawing Document No Submissio last
l Status
n response
KNPC PD SITE OFFICE FLOOR 31-Aug- To be
KNPC-TCF-CS-AR-ARD-0001 14- Feb-2021
PLAN 2021 Submitted
KNPC PD SITE OFFICE
24-Jun- To be
DOOR,WINDOWS ROOF FLOOR KNPC-TCF-CS-AR-ARD-0002 14-Feb-2021
2021 Submitted
& WALL FINISHING SCHEDULE
GA&RC DETAILS OF FOOTING,
TIE BEAM & FLOOR SLAB FOR KNPC-TCF-CS-GC-RCD-0001 10-Mar-2021 3-Jun-2021 Approved
SITE OFFICE BUILDING
KNPC PD OFFICE EXCAVATION
Awaiting
LAYOUT & DETAILS FOR 3-Jun-2021
KNPC-TCF-CS-GC-LYD-0003 14-Mar-2021 Approval
FOUNDATION AND GROUND
IFC
BEAM
Awaiting
GA&STRUCTURAL STEEL
Approval
DETAILS OF SITE OFFICE KNPC-TCF-CS-GC-GAD-0001 28-Mar-2021 25-Jul-2021
IFC
BUILDING (kriby)
Date of
Date of Approva
Description of drawing Document No last
Submission l Status
response
WATER SUPPLY PLAN & 11-Aug- Awaiting
KNPC-TCF-CS-UG-SDT-0001 06-April-2021
SCHEMATIC DIAGRAM 2021 Approval
KNPC PD SITE OFFICE GA & RC
11-Aug- Awaiting
DETAILS FOUNDATION FOR KNPC-TCF-CS-GC-RCD-0003 14-April-2021
2021 Approval
OVER HEAD WATER TANK
KNPC PD SITE OFFICE
SUPPORTING STRUCTURAL 11-Aug- Awaiting
KNPC-TCF-CS-GC-GAD-0003 19-April-2021
STEEL DETAILS FOR OVER 2021 Approval
HEAD WATER TANK
24-Aug- Awaiting
DRAINAGE LAYOUT KNPC-TCF-CS-GC-LYD-0001 29-April-2021
2021 Approval
KNPC PD SITE OFFICE
11-Aug- Awaiting
EXCAVATION DETAILS FOR KNPC-TCF-CS-CC-LYD-0012 29-Jun-2021
2021 Approval
OVER HEAD WATER TANK
KNPC PD SITE OFFICE 24-Jun-
KNPC-TCF-EL-CC-LYD-0004 28- Feb -2021 Approved
EARTHING LAYOUT 2021
KNPC PD SITE OFFICE SMALL
KNPC-TCF-EL-CC-LYD-0001 3-Mar-2021 6-May-2021 Approved
POWER LAYOUT
Awaiting
CERAMIC TILE 24-Feb-2021 2-Aug-21
Approval
Awaiting
GYPSUM BOARD PARTITION WALL 2-Mar-2021 31-Aug-21
Approval
Approved With
GYPSUM CEILING/False Ceiling 2-Mar-2021 19-Aug-21
Comments
Approved with
GATCH MATERIAL 03-April-2021 06-Jun-2021
Comments
NON SHRINK CEMENTOUS GROUT
06-April-2021 29-May-2021 Approved
(WEBERTEC 304 VHS)
READY MIX CONCRETE SUPPLIER FOR
06-April-2021 26-May-2021 Approved
MIX DESIGN (C20 SRC& C35 SRC)
Awaiting
PAINTING SYSTEM OF INTERNAL 25-Aug-21
Approval
WALL
25-Aug-21
OPC & SRC 30-Aug-21 Approved
Awaiting
TILE ADHESIVE & CEMENT GROUT 31-Aug-21
Approval
To be Submitted
Exhaust Fan
Resubmission
HVAC Unit 6-Mar-21 3-Aug-21 After Approval of
tech Query
Done
Earthing System Approved
AWAITING
POWER CABLE
APPROVAL
THERMOWELD NR
Awaited
Wall Cladding Cement
Wooden Doors
Awaiting Approval
Paint
Awaiting Approval
Terrazo Tile
Awaiting Approval
Ceramic Tile
Awaiting approval
Carpet Tile
Awaiting approval
Carpet
Awaiting approval
Sanitary Fixtures
Awaiting approval
Interlock and Kerbstone
Awaiting approval
Air Condition
Awaiting approval
Man Hole Covers
To Submit
Exhaust Fan
Bus 1 Working
SUV 1 Working
CAR 1 Working
As on 5-Sep-
21
Submission GROSS Invoice Amount Received Amount
Sl No Invoice No. Cumulative
Date Amount IN KD IN KD IN KD