RF Optimization Guide V3
RF Optimization Guide V3
RF OPTIMIZATION
GUIDE
Prepared for MTN CONGO
DRAFT VERSION
ME
Generate Radio Maps, DT Statistics and Events Maps.
RG
Analyze Layer 3 signaling Messages
ACTIVITIES
PRIMARY
E
VIRTUAL DRIVE TEST [VDT]
Export VDT Maps & Stats for coverage and pollution
Compare and Analyze variations
E
RG
Export Missing Neighbor relations from DT Analysis software
Compare Missing Neighbors by Top count
ME
PROPAGATION DELAY TIMING ADVANCE POWER INBALANCE
ACTIVITIES
INTER-SITE DISTANCE
SUPPORT
END
End
2 4
1 3 5
QUALITY CALL DROP
Check Missing Neighbor Relations
Check Call drop events
Check CELL Load on UL & DL.
Check Traffic In-balance between
layers and PRB Utilization
Propagation Delay ZTE
Compare ISD with Max Cell footprint & traffic
Start
Export Propagation Delay Calculate Inter-Site Cell Has its HIGHEST YES No Action.
Data and express in Distance (ISD) of the distribution of Propagation
percentages of ROW
ISD is >= X? Monitor the Cell
Cells Delay at distance X
NO
Inter-site distance (ISD)
YES
CELL is already identified in Cell is TOP Priority for
DT Analysis? Optimization
NO
Is the variable densely
sampled?
Step 1: Export Source and Target Neighbor relations Cell is TOP Priority for
Cell should be monitored as End
Step 2: Fill in the table (Columns A to F) as above Optimization
a candidate for Optimization
Step 3: Use the formula =RADIANS(C2), (D2), (E2) and (F2) as above to fill columns G to J.
Step 4: For Column K, Unique Inter Site Distance (source-target only)
=6371.012*ACOS(COS(H)*COS(J)*COS(G-I)+SIN(H)*SIN(J))
Step 5: Do Pivot table to get the AVERAGE of all the unique ISDs.
Start
Export Timing Advance Calculate Inter-Site Cell Has its HIGHEST YES No Action.
Data and express in Distance (ISD) of the distribution of Timing
percentages of ROW
ISD is >= X? Monitor the Cell
Cells Advance at distance X
NO
Inter-site distance (ISD)
YES
CELL is already identified in Cell is TOP Priority for
DT Analysis? Optimization
NO
Is the variable densely
sampled?
Step 1: Export Source and Target Neighbor relations Cell is TOP Priority for
Cell should be monitored as End
Step 2: Fill in the table (Columns A to F) as above Optimization
a candidate for Optimization
Step 3: Use the formula =RADIANS(C2), (D2), (E2) and (F2) as above to fill columns G to J.
Step 4: For Column K, Unique Inter Site Distance (source-target only)
=6371.012*ACOS(COS(H)*COS(J)*COS(G-I)+SIN(H)*SIN(J))
Step 5: Do Pivot table to get the AVERAGE of all the unique ISDs.
Check Max TX
Start
Power. CELL
No
Check PCPICH (TX Power – PCPICH) No Action. End
=> 10 Monitor the Cell
Yes
TILT
AZIMUTH
H EIGHT
L OCATION
TYPE
MTN CONGO ZTE
BZV CLUSTER DEMOGRAPHICS
BZV NORTH BZV CENTER
Class: Sub-Urban Class: Urban
Function: Political , Commercial and Administrative Function: Commercial, Markets and Administrative
Site Density: 50 Site Density: 87
AVE Inter-Site Distance: 3.3KM (High) AVE Inter-Site Distance: 2.5KM (Low)
AVE HBA: 25 - 50m AVE HBA: 25 - 30m
AVE Noise Level: -89Bm AVE Noise Level: -89Bm
Comments: Comments:
Undulating and mountainous terrain Highest site density
Irregular Antenna Heights High Buildings and Reflections
High Number of trees Big Markets
RET limitations RET limitations
Capacity requirements Capacity requirements
Comments: Comments:
High Number of Rooftops High Interference levels
High Buildings and Reflections High Buildings and Reflections
RET limitations RET limitations
Capacity requirements Capacity requirements
MTN CONGO ZTE
PNR CLUSTER DEMOGRAPHICS (Not
updated)
PNR NORTH PNR CENTER
Comments: Comments:
Undulating and mountainous terrain Highest site density
Irregular Antenna Heights High Buildings and Reflections
High Number of trees Big Markets
RET limitations RET limitations
Capacity requirements Capacity requirements
Comments: Comments:
High Number of Rooftops High Interference levels
High Buildings and Reflections High Buildings and Reflections
RET limitations RET limitations
Capacity requirements Capacity requirements
MTN CONGO ZTE
RF OPTIMIZATION LIMITS
AZIMUTH MECH TILT E TILT CELL PWR HBA …
PNR NORTH
PNR LITTORAL
PNR SOUTH
PNR CENTER
UPCOUNTRY
These settings are the maximum allowable adjustment per optimization action per sector in the specific cluster
Brazzaville scenarios have been captured.
Point-Noire scenarios will be summarized after PNR Cluster optimization
CUSTOMER COMPLAINT PROCESS ZTE
Call Centre
D Open ticket with SLA Customer
Other Sources &Transfer to relevant domain happy?
Yes Close ticket
E
S Deep investigation
K
Health Check No
Transferred Unusual cases Engage RnD
N
complaints
P Pre cc- Define procedure Visit & RF & Soft update
Approval
Solved? Yes Final
M (MTN) Yes
optimization
analysis Set date for visit Report Report tracker
& Send to MTN
No
B No
Update
O Change
Database
T Take into account
E MTN inputs
A
M
Provide new
S
set of actions
Pre CC-analysis checks: Actions during the field visit: Report per template should contain: SLA
1. Complaint location 1. Assess the indoor/Outdoor network experience 1. General Customer Complaint details VIP: 6 hrs
2. Is it a known or new complaint (Coverage & Quality) 2. Findings for the field and Office Assessment. High Profile: 24 hrs
3. Any activities/ Event in the area in recent 2. Identify serving and neighboring cells. 3. General Radio Conditions Normal : 48 hrs
days 3. Check physical parameters (HBA, Tilt, Azimuth) of 4. Recommended actions (short term and long terms)
4. General OSS/Netmax KPIs in the area the cells involved 5. Any other important information
5. Any other important information 4. Check the power settings on the cells involved
5. Any other important information on the ground
Go beyond