27 Day2 PM Aim For Datwg en
27 Day2 PM Aim For Datwg en
Administration
Information
Management (AIM)
Modernization
For DATWG
• AIM/Information Services
– Provide the information services necessary to support the seven ATM
capabilities
ATM AIM
• Enabling flight • Provide common
operations operating picture of
aeronautical situation
– Monitor quality
– Control quality
Aeronautical – Provide information sharing
Common – Integrate data (historical,
Operating planning and operational)
Picture – Provide decision information
support
Airport Field
Conditions (FICONS)
– Timeliness, consistency
– Single location
• Usability issues
– Confusing Q-Codes
– Cognitive problems with free
text
– Cognitive problems with
UPPERCASE and ABBRV *Kelley Krokos, Ph.D., American Institutes of Research
Florian Jentsch, Ph.D., University of Central Florida (UCF)
• Improve Safety
– Timely and accurate distribution of aeronautical
information
– Capturing and distributing digital aeronautical
information
• Improve efficiency NOTAM
– Digital capture and delivery Advisories
– Streamlined information management Special Use Airspace
• International Leadership Airport Field Conditions
– “Digital AIM” SNOWTAMS
Flow Constraints
– ICAO compliance
• Supporting NextGen
– Single Authoritative Source (i.e. Common
Operating Picture)
– Infrastructure for 4D flight planning, shared
situational awareness, …
Text Entry
Fax
Digital Entry
Phone
Airport System Interface Manual NOTAM Publish
Military Validation Databases
Forest Service
Security
Distribution of NOTAM is
Facilities
equally complicated
Procedures
today!
DATALINK
Web
AIM
Web Page
Service (AIXM)
Web service (AIXM)
Originator Legacy Formats
AIM Modernization System
Entry
AIXM XML
Charts
Plain Language
AIM Modernization – JRC Briefing Federal Aviation 21 21
March 2009 Administration
Capability roadmap
2008 2010 2012 2014+
AIS-Modernization (AIS-M)
•briefing •flight planning submission
Technical Policy
- Future Systems - ICAO compliance
- SWIM compliance - Digital capture and delivery
- Legacy support
AIM
Modernization
Outreach Safety
- Education - Minimize stakeholder impacts
- Human factors analysis - System transitions
- Stakeholder working group
Charles Montgomery
By: NAV CANADA Director, AIS & Flight Operations
Date:
Management Confidential 25
FAA-NAV CANADA Workgroup
Objectives……
• Work together to achieve seamless ICAO NOTAMs
between both states
••Design
Design Documents
Documents
••Model
Model Details
Details
••AIXM
AIXM 55 Forum
Forum
••Digital
Digital NOTAM
NOTAM
FAA Facilities
User User
DOD entry query CARF/NOTAM
FNS Users
Airports
Back up to FNS
FNS Digital ATCT Air Traffic
hazards
hazardsassociated
associatedwith with
protopype
Flight Services Phone/fax
direct
directentry
entryat
atDenver
Denver Internet TRACON
FS21
Airport
Airport FTI OPS IP
NADIN ARTCC
ERIDS
••NOTAM
NOTAM USNS FTI OPS IP
AIS-R, etc
coordination
coordinationwith
with
NOTAM Desk
local
localATC
ATCfacilities
facilities https
FTI MS IP
https
••Training
Trainingand
and FNS Server
compliance
compliancewithwith
policies
policiesand
andadvisory
advisory
circulars
circulars
TFR.FAA.GOV SUA.FAA.GOV
DOD
• Single authoritative sources
• Eliminate manual entries
• AIXM-compliant
• Consistent with AIM Modernization and
Federal NOTAM System!
• AIXM 5 Information
• Results of the OGC test bed
– Demonstration of AIXM to the cockpit
• Keynote speakers
– David Lewtas, ICAO
– Vicki Cox, FAA VP (NextGen)
– Ken Reid (Eurocontrol)
– Many others!
• Vendor booths May 12-14, 2009
Washington DC
Register at www.aixm.aero