0% found this document useful (0 votes)
64 views

27 Day2 PM Aim For Datwg en

The document discusses the FAA's vision for modernizing Aeronautical Information Management to support the global ATM operational concept. It outlines the need for seamless information exchange to support all phases of flight on a global scale. It also presents the AIM modernization concept to provide a single source for aeronautical information services through integrated data collection and distribution.

Uploaded by

luishz25iphone
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPT, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
64 views

27 Day2 PM Aim For Datwg en

The document discusses the FAA's vision for modernizing Aeronautical Information Management to support the global ATM operational concept. It outlines the need for seamless information exchange to support all phases of flight on a global scale. It also presents the AIM modernization concept to provide a single source for aeronautical information services through integrated data collection and distribution.

Uploaded by

luishz25iphone
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPT, PDF, TXT or read online on Scribd
You are on page 1/ 49

Aeronautical Federal Aviation

Administration
Information
Management (AIM)
Modernization

For DATWG

By: Brett Brunk


Architecture and Planning
System Operations - AIM Group

Date: March 2009


Topics

• Vision for Aeronautical Information


Management
• AIM Modernization Architecture
– Performance, business, information and technology
• Current Activities
– Federal NOTAM System initial deployment
– SUA
• Consolidation of web sites
• Information exchange
– AIXM 5

AIM Modernization – JRC Briefing Federal Aviation 2 2


March 2009 Administration
Topics

• Vision for Aeronautical Information


Management
• AIM Modernization Architecture
– Performance, business, information and technology
• Current Activities
– Federal NOTAM System initial deployment
– SUA
• Consolidation of web sites
• Information exchange
– AIXM 5

AIM Modernization – JRC Briefing Federal Aviation 3 3


March 2009 Administration
From AIS to AIM
AIM as a core ATM enabler
• Traditional AIS
– AIS is a set of paper products and manual
processes

• Aeronautical Information Management


– System to system exchange of aeronautical
information
– Global interoperability
– Integrated data sets
– Single entry multiple views

• Customer Service (Civil and military)


– Flight planning and briefing
– Aircraft
– ATC automation
– Traffic management
– Notice to Airmen

AIM Modernization – JRC Briefing Federal Aviation 4 4


March 2009 Administration
Global ATM Vision
• Provide “a holistic, cooperative and collaborative
decision-making environment, where the diverging
expectations and interests of all members of the ATM
community are balanced to achieve equity and
access.”
From ICAO Doc 9854 Global ATM Operational Concept (1.9.1)

• “Information management provides accredited,


quality-assured and timely information used to
support ATM operations.”

From ICAO Doc 9854 Global ATM Operational Concept (2.15)

AIM Modernization – JRC Briefing Federal Aviation 5 5


March 2009 Administration
What does the Global ATM
Operational Concept tell us?
• Need a move to seamless global air traffic management
– Internationally harmonized and globally interoperable ATM system

• ATM includes seven capabilities


– Manage airspace
– Demand and capacity balancing
– Aeronautical operations
– Traffic synchronization
– Conflict management
– Airspace user operations
– ATM service delivery management

• AIM/Information Services
– Provide the information services necessary to support the seven ATM
capabilities

AIM Modernization – JRC Briefing Federal Aviation 6 6


March 2009 Administration
Role of AIM in supporting ATM

ATM AIM
• Enabling flight • Provide common
operations operating picture of
aeronautical situation
– Monitor quality
– Control quality
Aeronautical – Provide information sharing
Common – Integrate data (historical,
Operating planning and operational)
Picture – Provide decision information
support

AIM Modernization – JRC Briefing Federal Aviation 7 7


March 2009 Administration
What is missing in AIM today?

Global ATM capabilities


– Manage airspace
– Demand and capacity
balancing
How should AIM
– Aerodrome operations
– Traffic synchronization
support these
– Conflict management ATM capabilities?
– Airspace user operations
– ATM service delivery
management

AIM Modernization – JRC Briefing Federal Aviation 8 8


March 2009 Administration
Supporting all phases of flight

AIM Modernization – JRC Briefing Federal Aviation 9 9


March 2009 Administration
Topics

• Vision for Aeronautical Information


Management
• AIM Modernization Architecture
– Performance, business, information and technology
• Current Activities
– Federal NOTAM System initial deployment
– SUA
• Consolidation of web sites
• Information exchange
– AIXM 5

AIM Modernization – JRC Briefing Federal Aviation 10 10


March 2009 Administration
The AIM Modernization Concept
Provide a ‘one stop shop’ for the aeronautical information services necessary for flight operations

Full Flight Plan On-Demand NAS


Flight data management 4D Trajectory
Airspace Status Situational Awareness

Enabling NextGen Capabilities


Performance
System Operations
Terminal En Route
Aircraft
Global ATM Operations

System Forecast Planning Performance


NAS ATM Support Services
Business
Common Operating Picture Airport Evaluation Airspace Design Geodectics Services
for Aeronautical Surface Evaluation Charting
Core Aeronautical Information Services
Information
Collect Evaluate Distribute
Information
Data Management

SWIM, DataComm, FTI


Standards &
Technologies
* Requirement to be validated and/or reallocated

AIM Modernization – JRC Briefing Federal Aviation 11 11


March 2009 Administration
The AIM Modernization Concept
Provide a ‘one stop shop’ for the aeronautical information services necessary for flight operations

Full Flight Plan On-Demand NAS


Flight data management 4D Trajectory
Airspace Status Situational Awareness

Enabling NextGen Capabilities


Performance
System Operations
Terminal En Route
Aircraft
Global ATM Operations

System Forecast Planning Performance


NAS ATM Support Services
Business
Common Operating Picture Airport Evaluation Airspace Design Geodectics Services
for Aeronautical Surface Evaluation Charting
Core Aeronautical Information Services
Information
Collect Evaluate Distribute
Information
Data Management

SWIM, DataComm, FTI


Standards &
Technologies
* Requirement to be validated and/or reallocated

AIM Modernization – JRC Briefing Federal Aviation 12 12


March 2009 Administration
Diverse customer community
Originators Customers
• Airport operators • Dispatchers
• Forest service • Pilots
• Procedure developers • General Aviation
• Military airfield • Business Jets
operators • Military
• Air Traffic Control • Military dispatch
• Air Traffic Control

AIM Modernization – JRC Briefing Federal Aviation 13 13


March 2009 Administration
Product-driven policy
Challenges facing AIM
Flight Restrictions
(Flow constraint rules, SOP, LOA)

National (FDC) NOTAM Weather data products


(IAPs, NAVAID,TFR)

Regional (Domestic) Special Activity Airspace


NOTAM (SAA) Activation
(SID, STAR, Airport)

Airport Field
Conditions (FICONS)

AIM Modernization – JRC Briefing Federal Aviation 14 14


March 2009 Administration
NOTAM User – Lessons Learned*
• User Studies
– Dispatchers
– Pilots

– Timeliness, consistency
– Single location

• Usability issues
– Confusing Q-Codes
– Cognitive problems with free
text
– Cognitive problems with
UPPERCASE and ABBRV *Kelley Krokos, Ph.D., American Institutes of Research
Florian Jentsch, Ph.D., University of Central Florida (UCF)

AIM Modernization – JRC Briefing Federal Aviation 15 15


March 2009 Administration
Program strategic deliverables
Provide a ‘one stop shop’ for the aeronautical information services necessary for flight operations

• Improve Safety
– Timely and accurate distribution of aeronautical
information
– Capturing and distributing digital aeronautical
information
• Improve efficiency NOTAM
– Digital capture and delivery Advisories
– Streamlined information management Special Use Airspace
• International Leadership Airport Field Conditions
– “Digital AIM” SNOWTAMS
Flow Constraints
– ICAO compliance
• Supporting NextGen
– Single Authoritative Source (i.e. Common
Operating Picture)
– Infrastructure for 4D flight planning, shared
situational awareness, …

AIM Modernization – JRC Briefing Federal Aviation 16 16


March 2009 Administration
Expected Benefits
• Decrease in incidents where NOTAMs are a
contributing factor

• Decrease data collection and interpretation costs


– Approximately $2M annually for major US carriers

• Decrease system operations costs


– Approximately $4M annually for US government

• Timely, accurate and complete aeronautical


information benefits flight operations
– Improvements for controllers and pilot situational awareness

AIM Modernization – JRC Briefing Federal Aviation 17 17


March 2009 Administration
The AIM Modernization Concept
Provide a ‘one stop shop’ for the aeronautical information services necessary for flight operations

Full Flight Plan On-Demand NAS


Flight data management 4D Trajectory
Airspace Status Situational Awareness

Enabling NextGen Capabilities


Performance
System Operations
Terminal En Route
Aircraft
Global ATM Operations

System Forecast Planning Performance


NAS ATM Support Services
Business
Common Operating Picture Airport Evaluation Airspace Design Geodectics Services
for Aeronautical Surface Evaluation Charting
Core Aeronautical Information Services
Information
Collect Evaluate Distribute
Information
Data Management

SWIM, DataComm, FTI


Standards &
Technologies
* Requirement to be validated and/or reallocated

AIM Modernization – JRC Briefing Federal Aviation 18 18


March 2009 Administration
Example of the legacy AIS challenges
NOTAM entry pathways today

Text Entry
Fax
Digital Entry
Phone
Airport System Interface Manual NOTAM Publish
Military Validation Databases
Forest Service
Security
Distribution of NOTAM is
Facilities
equally complicated
Procedures
today!

AIM Modernization – JRC Briefing Federal Aviation 19 19


March 2009 Administration
New Concept of Operations

DATALINK

Web
AIM
Web Page
Service (AIXM)
Web service (AIXM)
Originator Legacy Formats
AIM Modernization System

Accountable Sources Validate and Publish by an FAA


Authoritative Source
Digital Capture
(AIXM via templates) Integrated permanent and temporary
information
Computer readable
Electronic distribution to customers

AIM Modernization – JRC Briefing Federal Aviation 20 20


March 2009 Administration
Digital capture and delivery

Entry

AIXM XML
Charts
Plain Language
AIM Modernization – JRC Briefing Federal Aviation 21 21
March 2009 Administration
Capability roadmap
2008 2010 2012 2014+

AIM Modernization “Capital Investment Program”


Initial Segment 1 Final Segment 2 Final

Digital NOTAM Concept Development


EUROCONTROL xNOTAM trials

Federal NOTAM System FNS 2


(FNS 1) •TFRs •Center NOTAMs
•Tower Lights •ICAO •digital
•Field Conditions •FDCs
AIM
Advanced Dynamic ADAM 2 Common
Airspace Management (ADAM 1) •SUA
Operating
•ALTRV (CARF) •Create Airspace •digital Picture (COP)
•TFR •ATCAA

NextGen Common Status and Structure Data (CSSD)


•LOA/SOP •Digital flow constraints

AIS-Modernization (AIS-M)
•briefing •flight planning submission

AIM Modernization – JRC Briefing Federal Aviation 22 22


March 2009 Administration
Strategic Plan

Technical Policy
- Future Systems - ICAO compliance
- SWIM compliance - Digital capture and delivery
- Legacy support
AIM
Modernization

Outreach Safety
- Education - Minimize stakeholder impacts
- Human factors analysis - System transitions
- Stakeholder working group

AIM Modernization – JRC Briefing Federal Aviation 23 23


March 2009 Administration
Monday – 28 January 2008 0500 UTC

AIM Modernization – JRC Briefing Federal Aviation 24 24


March 2009 Administration
Federal Aviation
Administration
NAV CANADA – FAA
ICAO NOTAM Harmonization

Charles Montgomery
By: NAV CANADA Director, AIS & Flight Operations

Barry Davis, FAA Manager, Aeronautical Information Management

Date:
Management Confidential 25
FAA-NAV CANADA Workgroup
Objectives……
• Work together to achieve seamless ICAO NOTAMs
between both states

• Facilitate a modernization movement from legacy


NOTAMs to ICAO formatted NOTAMs

• Enable the transition to digital NOTAMs

• Use AIXM technology (version 5 and beyond)

AIM Modernization – JRC Briefing Federal Aviation 26 26


March 2009 Administration
Joint System Harmonization

• Direct entry by NOTAM authority


• ICAO NOTAM format for both states
• Common Series to be used by both states
• Automation for upfront quality checks
• Continue legacy system support
• Transition activities required

AIM Modernization – JRC Briefing Federal Aviation 27 27


March 2009 Administration
ICAO NOTAM Series/1

• Series A – Aerodrome/Movement or Landing Area


• Series B – ATC Facilities and Services
• Series C – Special Use Airspace
• Series D – Obstruction
• Series E – Airspace NOTAMs
• Series F – 2nd Language Translations (e.g., French)
• Series G – GNSS NOTAMs (GPS, WAAS, LAAS)
• Series H – Chart Corrections

AIM Modernization – JRC Briefing Federal Aviation 28 28


March 2009 Administration
ICAO NOTAM Series/2

• Series J – Special Notices and Advisories


• Series L – Limited Distribution NOTAMs
• Series M – Military
• Series N – NAVAID NOTAMs
• Series O – Other Aeronautical Information
• Series P – Procedural
• Series V – Military Procedures
• Series W – Database Corrections
• Series Y – Test NOTAMs
• Series Z – Airway NOTAMs
AIM Modernization – JRC Briefing Federal Aviation 29 29
March 2009 Administration
The AIM Modernization Concept
Provide a ‘one stop shop’ for the aeronautical information services necessary for flight operations

Full Flight Plan On-Demand NAS


Flight data management 4D Trajectory
Airspace Status Situational Awareness

Enabling NextGen Capabilities


Performance
System Operations
Terminal En Route
Aircraft
Global ATM Operations

System Forecast Planning Performance


NAS ATM Support Services
Business
Common Operating Picture Airport Evaluation Airspace Design Geodectics Services
for Aeronautical Surface Evaluation Charting
Core Aeronautical Information Services
Information
Collect Evaluate Distribute
Information
Data Management

SWIM, DataComm, FTI


Standards &
Technologies
* Requirement to be validated and/or reallocated

AIM Modernization – JRC Briefing Federal Aviation 30 30


March 2009 Administration
Digital Aeronautical Information
Digital NOTAM

AIM Modernization – JRC Briefing Federal Aviation 31 31


March 2009 Administration
Aeronautical Information Exchange Model
Enabling AIM Modernization
•Complete data
model (Airport
AC 150/5300-18B)
Provides globally applicable conceptual •OGC GML 3.2
model and exchange format for aeronautical
information
Compliant
Models temporality •Static and
Accommodates ICAO standards and dynamic data
recommendations: Annex 4 and 15
•Common
Accommodates industry requirements: meanings and
Others… ARINC 424/EUROCAE ED-99/RTCA DO-272 definitions
Uses XML and GML
Is modular and extendable •Eliminate free
form text
More information at www.aixm.aero

AIM Modernization – JRC Briefing Federal Aviation 32 32


March 2009 Administration
Web Site
www.aixm.aero

••Design
Design Documents
Documents
••Model
Model Details
Details
••AIXM
AIXM 55 Forum
Forum
••Digital
Digital NOTAM
NOTAM

AIM Modernization – JRC Briefing Federal Aviation 33 33


March 2009 Administration
The AIM Modernization Concept
Provide a ‘one stop shop’ for the aeronautical information services necessary for flight operations

Full Flight Plan On-Demand NAS


Flight data management 4D Trajectory
Airspace Status Situational Awareness

Enabling NextGen Capabilities


Performance
System Operations
Terminal En Route
Aircraft
Global ATM Operations

System Forecast Planning Performance


NAS ATM Support Services
Business
Common Operating Picture Airport Evaluation Airspace Design Geodectics Services
for Aeronautical Surface Evaluation Charting
Core Aeronautical Information Services
Information
Collect Evaluate Distribute
Information
Data Management

SWIM, DataComm, FTI


Standards &
Technologies
* Requirement to be validated and/or reallocated

AIM Modernization – JRC Briefing Federal Aviation 34 34


March 2009 Administration
Federal NOTAM System SWIM architecture

NOTAM/CARF NOTAM/CARF NOTAM/CARF NOTAM/CARF Users


Origination Collection Processing Distribution

FAA Facilities
User User
DOD entry query CARF/NOTAM
FNS Users
Airports

System to System to External Systems


External Systems System System
Service Bus

AIM Modernization – JRC Briefing Federal Aviation 35 35


March 2009 Administration
System Architecture
• Open
Geospatial
Consortium
compliant
– GML, WFS,
WMS
• AIXM
• SWIM Web
Services
– SOAP, XML
• Extensible and
Modular

AIM Modernization – JRC Briefing Federal Aviation 36 36


March 2009 Administration
Topics

• Vision for Aeronautical Information


Management
• AIM Modernization Architecture
– Performance, business, information and technology
• Current Activities
– Federal NOTAM System initial deployment
– SUA
• Consolidation of web sites
• Information exchange
– AIXM 5

AIM Modernization – JRC Briefing Federal Aviation 37 37


March 2009 Administration
Federal NOTAM System
2009 operational demonstrations
2008 2010 2012 2014+

Federal NOTAM System


(FNS 1)

• Digital Entry Tower Operators and Airports


– AIXM Event Specifications System and Web Interfaces

– SNOW, Runways and Obstacles


Digital NOTAM Entry
• Web site concepts
– Airport NOTAM summary
– NOTAM queries US NOTAM System
• Concept validation Database of Record

– Technology, Policy, Safety and


Outreach
NOTAM Query and
• Field studies NOTAM Summary
• Limited deployment
demonstrations Legacy Users
Digital Consumers

AIM Modernization – JRC Briefing Federal Aviation 38 38


March 2009 Administration
Direct NOTAM entry at Denver Airport
Passur
DEN Airport Systems
DEN Airport
Operations Phone
Internet Airline/Public
eNOTAMS
Airport personnel IDS4
Passur
NOTAM Position
FSN
Phone/fax/
••Safety
Safetyrisk
riskanalysis
analysis
eNOTAM Coordination
Internet or
identified
identifiednonosignificant
significant
Phone

Back up to FNS
FNS Digital ATCT Air Traffic
hazards
hazardsassociated
associatedwith with
protopype
Flight Services Phone/fax

direct
directentry
entryat
atDenver
Denver Internet TRACON

FS21
Airport
Airport FTI OPS IP
NADIN ARTCC

ERIDS
••NOTAM
NOTAM USNS FTI OPS IP
AIS-R, etc

coordination
coordinationwith
with
NOTAM Desk

local
localATC
ATCfacilities
facilities https
FTI MS IP

https
••Training
Trainingand
and FNS Server

compliance
compliancewithwith
policies
policiesand
andadvisory
advisory
circulars
circulars

AIM Modernization – JRC Briefing Federal Aviation 39 39


March 2009 Administration
Digital NOTAM Capture Demo
notamdemo.aim.nas.faa.gov

AIM Modernization – JRC Briefing Federal Aviation 40 40


March 2009 Administration
Field Summary Demo
notams.aim.faa.gov

AIM Modernization – JRC Briefing Federal Aviation 41 41


March 2009 Administration
System to System NOTAM Entry
“Lights Out” Entry Sample Airport Entry

• “Lights out” NOTAM Capture (42% of all NOTAMs, 75% of D NOTAMs)


• NavAid Capture
• Procedures Capture
• Airports Capture
– Electronic System Interface Capture for large airports (SWIM compliant web services)
– Web Capture as backup and other airports

AIM Modernization – JRC Briefing Federal Aviation 42 42


March 2009 Administration
TFR and SUA web site merge
•• One
One stop
stop shop
shop
•• Situational
Situational awareness
awareness issues
issues
•• Explore
Explore concepts
concepts for
for spatial-temporal
spatial-temporal
representation
representation of
of aeronautical
aeronautical information
information

TFR.FAA.GOV SUA.FAA.GOV

AIM Modernization – JRC Briefing Federal Aviation 43 43


March 2009 Administration
SUA Information Exchange
• Improve scheduling
• Information dissemination
• SWIM Service Oriented Architecture

NASR SAMS ERAM

Service Oriented Architecture (SOA)

DOD
• Single authoritative sources
• Eliminate manual entries
• AIXM-compliant
• Consistent with AIM Modernization and
Federal NOTAM System!

AIM Modernization – JRC Briefing Federal Aviation 44 44


March 2009 Administration
AIXM/WXXM Conference

• AIXM 5 Information
• Results of the OGC test bed
– Demonstration of AIXM to the cockpit
• Keynote speakers
– David Lewtas, ICAO
– Vicki Cox, FAA VP (NextGen)
– Ken Reid (Eurocontrol)
– Many others!
• Vendor booths May 12-14, 2009
Washington DC
Register at www.aixm.aero

AIM Modernization – JRC Briefing Federal Aviation 45 45


March 2009 Administration
DOD Coordination

• The Value Proposition


– Well-established standards for accessing aeronautical data
– Digital data access
– Timeliness and quality improvements

• For your consideration


– Transition from analog to digital products
– Network enabled operations (SWIM)
– Security and Access
– Transition to military systems
Acknowledgements:
DOD NOTAM office
NGA
US AF AMC

AIM Modernization – JRC Briefing Federal Aviation 46 46


March 2009 Administration
Conclusions and Questions
• AIM is about
– Digital capture and delivery of aeronautical information
– Timely and high quality access to information for all customers
– Information necessary to support future ATM
• AIM Modernization
– Customer focus
– System designed for interoperability
• Key short term initiatives
– Federal NOTAM System trials – Denver
– SUA
– AIXM Conference – May 12-14

AIM Modernization – JRC Briefing Federal Aviation 47 47


March 2009 Administration
Thank you
• Information on AIM modernization
– Nfdc.faa.gov/aimnews
– www.aixm.aero
– Notams.aim.faa.gov
– Notamdemo.aim.nas.faa.gov
• Contacts
– Brett Brunk
• AIM Architecture and Planning
[email protected]
– Barry C Davis
• Manager of AIM
[email protected]

AIM Modernization – JRC Briefing Federal Aviation 48 48


March 2009 Administration
Benefits for customers
Provide new digital capabilities while maintaining legacy support

Federal NOTAM System

Format Traditional (Legacy) ICAO Digital (AIXM)


RWY 4/22 CLSD EXC TAXI QMRLC… A) B) C) D) E) F) <RUNWAY>…</RUNWAY>

Benefit Faster Some filtering Graphical


Standardized Terms Data fusion
Advanced filtering
Computer readable

End Date Approx. 2015 Following ICAO


SARPS

AIM Modernization – JRC Briefing Federal Aviation 49 49


March 2009 Administration

You might also like