Week 3 - Intro To Demolition
Week 3 - Intro To Demolition
DEMOLITION WORKS
By using SMM2
(Malaysian Standard Method of Measurement of Building Works)
NURHIDAYAH SAMSUL RIJAL
PROGRAMME OF BUILDING SURVEYING (AP119)
UITM PERAK BRANCH
OBJECTIVE AND OUTCOME
► Lesson Objective
Lesson Outcome
Each of student able to understand and choose
the right section regarding demolition works
according to SMM2
MAIN TOPICS
NEW WORKS
DEMOLITION
CONSTRUCTION
ALTERATION
Item : Item
C.3 MEASUREMENT
DESCRIPTION CLAUSE
Remove existing external Doors in Wet Kitchen overall D03 size C.3.4
900mm x 2100mm high with and including all necessary frames State the description)
and ironmongeries carefully to be set aside and re- fixing, and
make good all works disturbed
Hacking off existing Parquet in Family area, including all C.3.6
backing screed 19mm thick and prepare surface for new State the description)
finishes and make good work disturbed (Approximately
10.10m2 total area)
SEE YOU NEXT WEEK …..