F169-Water & FF System Training
F169-Water & FF System Training
PROJECT TRAINING
24/6/9 1
Contents
24/6/9 2
Ⅰ Design principle for water & fire fighting system
24/6/9 3
1. Flow sheet for water & fire fighting system
24/6/9 5
Treatment capacity
• Product water flow: 60m3/h, 1440m3/d.
• recovery of RO: 50%.
• ratio of desalinization: ≥98%.
• Product water quality: TDS < 500mg/L, Total hardness (as CaCO3) < 200mg/L, PH=7-
8.
24/6/9 6
3. Process water system
24/6/9 8
4. Potable water system
24/6/9 9
5. Fire fighting system
24/6/9 10
b. Fire fighting system for HFO & diesel oil tanks
One fire fighting water tank, divided into two, every one can independently work,
2×730m3.
Three diesel engine driven fire pumps, two use, one standby. Two jockey pumps, one use,
one standby. One pressure vessel. One foam tank. Ten foam monitors. Ten foam
hydrants. Ten water hydrants. Two foam chambers for every oil tank. Two flame
detectors for every oil tank. Wrapping temperature sensitive cable around every oil tank.
Loop water pipe for supplying water to water hydrants and sprinklers.
Loop foam pipe for supplying foam to foam hydrants.
Pumps draw water from this water tank and supply fire fighting water to water hydrants
& sprinklers and the foam tank. Jockey pump runs uninterruptedly in normal times in 24
hours and keep pressure of fire fighting pipe net at 11bar. Fire fighting main pump –
diesel pump will start when the pressure goes down to 9.5bar or fire alarm appears.
Dosing NaCLO into the fire fighting water tank in order to prevent breeding bacteria
and alga.
24/6/9 11
c. IG541 Gas (inergen) fire fighting system for CCR
IG541 agent is a mixture of three naturally occurring gases: Nitrogen(52%),
Argon(40%) and Carbon dioxide(8%). IG541 agent extinguishes fire by lowering the
oxygen content below 15% and above 10%, and it does no harm to people.
The min. design concentration shall be higher than 1.3 times of extinguishing
concentration at the min. temperature. The actual extinguishing concentration shall be
less than 52% at the max. temperature. The design temperature of the system is 20℃, the
ambient temperature is 0~50℃.
The design concentration shall achieve 95% during 48 to 60 seconds after extinguishing.
The concentration of agent must be maintained for a substantial period of time, 10
minutes is adopted for electrical equipment.
The system shall be provided with automatic, manual and mechanical emergency
actuation.
The volume of cylinder is 80L, the storage pressure is 15MPa. The total of cylinders 80.
Design concentration 37.5%.
24/6/9 12
d. fire fighting system for ER
Portable carbon dioxide extinguisher be used for electric control cabinets in ER.
Portable dry-power extinguisher be used for cable floor in ER.
24/6/9 13
6. Waste water treatment system
24/6/9 14
Treatment process
Treatment capacity
• capacity: 20m3/h, 480m3/d.
• treated water quality:
turbidity(NTU) ≤3
TDS ≤1500mg/L
BOD5 ≤10mg/L
NH3-N ≤10mg/L
24/6/9 15
7. Water pipe routing
a. Pipe category
cooling water supply & return pipe (XJ &XH)
spray water pipe (SJ)
potable water pipe (J)
fire fighting water pipe (XF)
reclaimed water pipe (ZJ)
sewage pipe (W)
b. Pipe material
Pressure flow pipe (XJ, XH, SJ, J, XF, ZJ, W) : Steel wire reinforced thermoplastics
(PE) composite pipe
Gravity flow pipe (W) : Metal reinforced polyethylene (PE) spiral corrugated pipe
24/6/9 16
c. Pipe laying method
All pipes are directly buried underground.
24/6/9 17
Ⅱ Control & operation for main equipment
1. Control for main equipment
Raw water treatment
All raw water treatment equipment in raw water treatment workshop automatically run
through control system of equipment itself. All kinds of working parameters, breakdown
signal and alarm signal is transmitted to CCR. All kinds of chemicals would be mixed
manually.
The raw water treatment system automatically starting or stopping is according to water
level of desalting water tank (treated water tank in combined pumping station workshop).
At the same time, the system starting or stopping is related to water level of raw water
tank.
Combined pumping station
All pumps (including process water pumps, potable water pumps, fire fighting pumps and
replenishing water pumps) are controlled by CCR. All kinds of working parameters
(such as water level, pressure, flow, etc.) breakdown signal and alarm signal is
transmitted CCR. Chemicals dosed into water tanks would be mixed manually.
24/6/9 18
Starting pump is permitted only when water level of water tank is higher than starting
pump level. Automatically stopping pump when water level reaches the minimum level.
Fire fighting system for oil tanks
Foam monitor, foam hydrant and water hydrant will be operated manually. All other
equipment (including fire pumps, jockey pumps, foam tank, foam chambers, spray
nozzles, and etc.) automatically run through control system of equipment itself. All kinds
of working parameters, breakdown signal and alarm signal is transmitted to CCR.
Sewage treatment
All sewage treatment equipment in sewage treatment workshop automatically run through
control system of equipment itself. All kinds of working parameters, breakdown signal and
alarm signal is transmitted to CCR. All kinds of chemicals would be mixed manually.
Spray pumping station for limestone crushing
Starting or stopping spray pump for unloading pit is through driver manually operating the
control push-button.
24/6/9 19
2. Operation for main equipment
24/6/9 21
Ⅲ Matters need attention in commissioning
24/6/9 22
4. Check the pressure gauges and thermometers in workshops. If damaged, they should
be repaired or changed according to design.
5. After completing the above work, it’s necessary to debug the circulating cooling
water system over the whole plant. Because of the different distance from the
circulating water pump room to different workshops, the inlet pressure of workshops
is different. Turn down the inlet valve of the workshops which are near to the pump
room, and open wide the inlet valve of the workshops which are distant from the
pump room, ensure cooling water flow of every equipment reach to design flow.
6. Check water meters, pressure gauges, thermometers and temperature rise of the
equipment at the same time of adjusting the valves, in order to ensure the equipment
in normal operation.
24/6/9 23
7. Debug all raw treatment equipment, including instrument, meter, valves, motors,
tanks, pipes and so on.
8. Debug all chemical dosing devices and chemicals.
9. Absolutely remove the packing of RO & UF membrane before installation, ensure full
of water in membrane housings after installation.
10. Trained personnel shall be needed to manage raw water treatment and circulating
cooling water system. All debugged valves should be marked and nobody could be
permitted to adjust the valves. Monitor the working condition of all equipment and
instrument constantly in the central control room. In case abnormal condition occur,
response and repair in time. Check of the equipments and pipes of raw water treatment
and circulating cooling water system regularly, and properly handle any discovered
problem.
24/6/9 24