L-Wait and Weight
L-Wait and Weight
• One circulation
• Kill mud pumped at the same time as
the influx is removed
TVD 10000’
E.Abdullah Mahmoud YouTube: Petroleum Capsules
Email: [email protected] FB: www.FB.com/abdullah.amar
Wait and weight
800
900
method
30 SPM Single circulation
• Bring pump to kill rate,
HOLDING CASING PRESSURE
CONSTANT
• Once at kill rate,switch to drill pipe
pressure
Mud wt KMW • Drill pipe pressure should be
10 ppg 11 ppg I.C.P. = SCRP + SIDPP
= 300 + 500
= 800 psi
SCR
30 spm
300 psi
TVD 10000’
E.Abdullah Mahmoud YouTube: Petroleum Capsules
Email: [email protected] FB: www.FB.com/abdullah.amar
Wait and weight
700
950
method
30 SPM Single circulation
• Bring pump to kill rate,
HOLDING CASING PRESSURE
CONSTANT
• Once at kill rate,switch to drill pipe
pressure
Mud wt KMW • Drill pipe pressure should be
10 ppg 11 ppg I.C.P. = SCRP + SIDPP
= 300 + 500
= 800 psi
• Allow drill pipe pressure to fall.
SCR
ICP = 800
30 spm to
300 psi FCP = 300 x 11 = 330 psi
10
as kill mud is pumped to the bit
TVD 10000’
E.Abdullah Mahmoud YouTube: Petroleum Capsules
Email: [email protected] FB: www.FB.com/abdullah.amar
Wait and weight
500
1000
method
30 SPM Single circulation
• Bring pump to kill rate,
HOLDING CASING PRESSURE
CONSTANT
• Once at kill rate,switch to drill pipe
pressure
Mud wt KMW • Drill pipe pressure should be
10 ppg 11 ppg I.C.P. = SCRP + SIDPP
= 300 + 500
= 800 psi
• Allow drill pipe pressure to fall.
SCR
ICP = 800
30 spm to
300 psi FCP = 300 x 11 = 330 psi
10
as kill mud is pumped to the bit
TVD 10000’
E.Abdullah Mahmoud YouTube: Petroleum Capsules
Email: [email protected] FB: www.FB.com/abdullah.amar
Wait and weight
400
1100
method
30 SPM Single circulation
• Bring pump to kill rate,
HOLDING CASING PRESSURE
CONSTANT
• Once at kill rate,switch to drill pipe
pressure
Mud wt KMW • Drill pipe pressure should be
10 ppg 11 ppg I.C.P. = SCRP + SIDPP
= 300 + 500
= 800 psi
• Allow drill pipe pressure to fall.
SCR
ICP = 800
30 spm to
300 psi FCP = 300 x 11 = 330 psi
10
as kill mud is pumped to the bit
TVD 10000’
E.Abdullah Mahmoud YouTube: Petroleum Capsules
Email: [email protected] FB: www.FB.com/abdullah.amar
Wait and weight
330
1100
method
30 SPM Single circulation
• Bring pump to kill rate,
HOLDING CASING PRESSURE
CONSTANT
• Once at kill rate,switch to drill pipe
pressure
Mud wt KMW • Drill pipe pressure should be
10 ppg 11 ppg I.C.P. = SCRP + SIDPP
= 300 + 500
= 800 psi
• Allow drill pipe pressure to fall.
SCR
ICP = 800
30 spm to
300 psi FCP = 300 x 11 = 330 psi
10
as kill mud is pumped to the bit
TVD 10000’
E.Abdullah Mahmoud YouTube: Petroleum Capsules
Email: [email protected] FB: www.FB.com/abdullah.amar
Wait and weight
330
1300
method
30 SPM Single circulation
• Bring pump to kill rate,
HOLDING CASING PRESSURE
CONSTANT
• Once at kill rate,switch to drill pipe
pressure
Mud wt KMW • Drill pipe pressure should be
10 ppg 11 ppg I.C.P. = SCRP + SIDPP
= 300 + 500
= 800 psi
• Allow drill pipe pressure to fall.
SCR
ICP = 800
30 spm to
300 psi FCP = 300 x 11 = 330 psi
10
as kill mud is pumped to the bit
TVD 10000’
1000
500
0
0 1 2 3 4 5 6 7 8 9 10 11
Stks x 100
E.Abdullah Mahmoud YouTube: Petroleum Capsules
Email: [email protected] FB: www.FB.com/abdullah.amar
Wait and weight method
ICP = SIDPP + SCR PRESSURE FCP = SCR X KILL MUD
OLD MUD
Step down from ICP to FCP using either graph or chart
800
SIDPP
330
0
STROKES TO BIT