Capacity Multiple Flow-0

Capacity planning and in operations management

Uploaded by

Francis Nyeko
Copyright
© © All Rights Reserved
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
3 views

Capacity Multiple Flow-0

Capacity planning and in operations management

Uploaded by

Francis Nyeko
Copyright
© © All Rights Reserved
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
You are on page 1/ 4

Multi-Flow Capacity

A Process With 3 Activities and Partitioned or Multi Flows


Subprocess A
Review
40% Tp = 20 mins.
c=2 Compute the
R= 10/hr Initial
Review Capacity of this
Tp=10 process.
mins Subprocess B
c=2 60% Review
Tp = 30 mins.
c=4

R (/ hr)= 10 12
Tp c Rp/ min Rp/ hr % R U
10 2 0.2 12 1 10 0.83333
20 2 0.1 6 0.4 4 0.66667
30 4 0.13333 8 0.6 6 0.75
Capacity Practice, A. Asef-Vaziri, Operations, Information, and Analytics. 2
A Process With 3 Activities- Relax The Bottleneck
R (/ hr)= 10
Relax the bottleneck
Tp c Rp/ min Rp/ hr % R U Resource Pool by one
10 2 0.2 12 1 10 0.83333 12 Resource Unit. Compute
20 2 0.1 6 0.4 4 0.66667 the new Capacity.
30 4 0.13333 8 0.6 6 0.75

R (/ hr)= 12 / hr Relax the bottleneck


Tp c Rp/ min Rp/ hr % R U Resource Pool by one
10 3 0.3 18 1 12 0.66667 13.3333 Resource Unit. Compute
20 2 0.1 6 0.4 4.8 0.8 the new Capacity.
30 4 0.13333 8 0.6 7.2 0.9

R (/ hr)= 13.3333 / hr
Tp c Rp/ min Rp/ hr % R U
10 3 0.3 18 1 13.3333 0.74074 15
20 2 0.1 6 0.4 5.33333 0.88889
30 5 0.16667 10 0.6 8 0.8

Capacity Practice, A. Asef-Vaziri, Operations, Information, and Analytics. 3


A Process With 3 Activities and Partitioned or Multi Flows
Subprocess A
Review
40% Tp = 20 mins.
c=2 Compute the
R= 10/hr Initial
Review Capacity of this
Tp=10 process.
mins Subprocess B
c=2 60% Review
Tp = 30 mins.
c=4
R (/ hr)= 10
Tp c Rp/ min
10 2 0.2
20 2 0.1
30 4 0.13333

Capacity Practice, A. Asef-Vaziri, Operations, Information, and Analytics. 4