Process Flow - Additional Problems Basic 2021
Process Flow - Additional Problems Basic 2021
In all these cases, Inventory in processes A and B are 200 and 100,
respectively.
3. Process Flow Measures
20% Reject
4 24
3 1
0
Agent
a) How long on average s
does an agent work for this call
center?
R = 50 people/month
I = 1000 people
Average working time = Throughput Time
= I/R = 1000/50 = 20 months or 20/12 = 1.67
years
Suppose the cost of hiring and training a new agent is
$1000. The manager of this call center believes that
increasing agents’ salary would keep them working
longer term in the company. The manager wants to
increase the average time that an agent works for the
3. Process Flow Measures
Agent Agent
20 2
s s
months years
Current annual cost for hiring and training:
Throughput Rate = 50 people/month
= 600 people/year
Annual hiring and training cost is 600 (1000) =
$600,000
3. Process Flow Measures