OUTLINE OF PRESENTATION
Introduction
Construction
Construction Industry Overview
Construction Cost
Literature Review
Aim of the Study
Objectives of Study
Research Methodology
Problem Statement
References Project Phase 1, BE CIVIL (2021-22), Group No. 10
2
MET's Institute of Engineering, Civil Engineering Department (Project Phase I )
INTRODUCTION
What is Construction ?
Construction covers the processes involved in
delivering buildings, infrastructure and
industrial facilities, and associated activities
through to the end of their life. It typically starts
with planning, financing, and design, and
continues until the asset is built and ready for
use; construction also covers repairs and
maintenance work, any works to expand, extend
and improve the asset, and its
eventual demolition, dismantling
or decommissioning. Figure: Construction Site 3
Project Phase 1, BE CIVIL (2021-22), Group No. 10
MET's Institute of Engineering, Civil Engineering Department (Project Phase I )
5
Project Phase 1, BE CIVIL (2021-22), Group No. 10
MET's Institute of Engineering, Civil Engineering Department (Project Phase I )
7
Project Phase 1, BE CIVIL (2021-22), Group No. 10
MET's Institute of Engineering, Civil Engineering Department (Project Phase I )
Contd…
1. Building Construction
Contd…
2. Infrastructure Construction 3. Industrial Construction
CONSTRUCTION PROCESS
Planning
Finance
Legal
Procurement
Design
On-site Construction
Demolition 10
Project Phase 1, BE CIVIL (2021-22), Group No. 10
MET's Institute of Engineering, Civil Engineering Department (Project Phase I )
CONSTRUCTION COST
Expense incurred by a contractor for labour, material, equipment, financing, service utilities etc.
plus overheads and contractors’ profit.
Cost of land, architectural design, fee of consultant and engineer are not construction costs.
Construction costs form part of the overall costs incurred during the development of a built
asset such as a building.
Very broadly, construction costs will be those costs incurred by the actual construction
works themselves, and on some projects may be determined by the value of the contract with
the main contractor.
However, the construction contract may include costs that might not in themselves be considered
literal construction costs (hard costs), such as fees, profits, overheads, and so on.
11
Project Phase 1, BE CIVIL (2021-22), Group No. 10
MET's Institute of Engineering, Civil Engineering Department (Project Phase I )
TYPES OF COST
Cost
a) Fixed Cost :- Fixed costs are those that do not change throughout the life-cycle of a project.
b) Direct Cost :- Direct costs are expenses that come out of the project budget directly.
c) Sunk Cost :- Sunk costs are those that have been incurred in a project, but have not produced
value towards the project’s objectives.
12
Project Phase 1, BE CIVIL (2021-22), Group No. 10
MET's Institute of Engineering, Civil Engineering Department (Project Phase I )
5) Inflation Factor
6) Project Schedule
7) Quality of Plans & Specifications
8) Reputation of Engineer
9) Regulatory Requirements
10) Insurance Requirements
13
Project Phase 1, BE CIVIL (2021-22), Group No. 10
MET's Institute of Engineering, Civil Engineering Department (Project Phase I )
Cost
Managem Estimate Determine Control
ent Costs Budget Costs
Process
14
Project Phase 1, BE CIVIL (2021-22), Group No. 10
MET's Institute of Engineering, Civil Engineering Department (Project Phase I )
LITERATURE REVIEW
Sr. Title of Name of
References Highlights
No. Paper Journal
Author studied affordable housing: cost effective
construction materials for economically weaker
Affordable
section. In any populous country shelter for
Housing:
everyone is an emerging need. An experimental
Cost Science
investigation had been made with an aim to
Effective Direct:
suggest a cost effective construction technique in
Arun M. Constructio Materials
1 order to build an affordable house for EWS
et. al. [2021] n Materials Today:
people. In this attempt, various cost effective
for Proceedings
materials such as EPS (Expanded polystyrene),
Economica
coconut shell, Foundry sand, Fly ash were used.
lly Weaker
The cost analysis to cast every slab was made and
Section”,
obtained an optimum cost effective material with
high strength.
15
Project Phase 1, BE CIVIL (2021-22), Group No. 10
MET's Institute of Engineering, Civil Engineering Department (Project Phase I )
Contd…
Sr. Name of
References Title of Paper Highlights
No. Journal
This paper presented a comprehensive
cost comparative analysis of a mass
Analysis of Cost
timber building mainly developed with
Comparison and
cross-laminated timber (CLT). The actual
Effects of
Science construction cost of the project was
Change Orders
Shafayet A. Direct: compared with the modeled cost of the
During
2 et. al. Journal of same building designed as a concrete
Construction:
[2021] Building option. The result showed that the
Study of a Mass
Engineering construction cost of timber building is
Timber and a
6.43% higher than the modeled concrete
Concrete
building. The study was helpful to
Building Project
provide insight into the construction cost
of typical mass timber buildings.
16
Project Phase 1, BE CIVIL (2021-22), Group No. 10
MET's Institute of Engineering, Civil Engineering Department (Project Phase I )
Contd…
Sr. Title of Name of
References Highlights
No. Paper Journal
This paper explored the role of inflation
and how it affects the economy and the
construction industry. It had concluded that
Impact of
Science the inflation rate is neglected in most of the
Inflation
Direct: Ain construction projects economics and
Musarat M. Rate on
Shams budgeting that causes the project cost
et. al. Constructio
3 Engineering overrun as the building materials prices,
[2020] n Projects
Journal labour wages, and machinery hire rates
Budget:
were changing annually. The framework
A Review
was useful for the future budget estimation
model to eliminate project cost overrun
which occurs due to the inflation rate.
17
Project Phase 1, BE CIVIL (2021-22), Group No. 10
MET's Institute of Engineering, Civil Engineering Department (Project Phase I )
Contd…
Sr. Referenc Title of Name of
Highlights
No. es Paper Journal
The aim was to assess the relevance and impact of
the various delay causes on construction projects,
Systematic
to identify the responsible party as well as to
Processing
Science evaluate the effect of using the Building
Framework
Direct: Information Modeling (BIM) on delays. Thus, this
Elhussein for Analyzing
Ain paper promoted the use of a systematic processing
y H. The Factors
4 Shams framework to outline a course for examining delay
et. al. of
Engineeri factors of construction projects in Egypt while
[2020] Construction
ng validating the outcomes through a survey
Projects
Journal questionnaire. This leads to prioritize delay causes
Delays in
and hence to identify the most suitable approach for
Egypt
dealing with construction projects’ delays and their
associated cost impact.
18
Project Phase 1, BE CIVIL (2021-22), Group No. 10
MET's Institute of Engineering, Civil Engineering Department (Project Phase I )
Contd…
Sr. Referenc Title of Name of
Highlights
No. es Paper Journal
Author studied studied time and cost optimization
of construction project using mivan
technology.Mivan is comparatively a new
Time and Journal
construction technology upcoming for successful
Cost of
completion of mass project especially repetitive in
Gulhane Optimization Engineeri
nature. In this paper we have discussed about cost
A. of ng
5 as well as time comparison of mivan technology
et. al. Construction Research
with conventional formwork technology. The
[2018] Project Using and
Mivan technology is appreciably efficient with
Mivan Applicati
cost, quality and time saving as compare to
Technology on
conventional one. The basic ideology is to reach a
sturdy conclusion regarding the superiority of the
two techniques over another.
19
Project Phase 1, BE CIVIL (2021-22), Group No. 10
MET's Institute of Engineering, Civil Engineering Department (Project Phase I )
Contd…
Sr. Title of Name of
References Highlights
No. paper Journal
This study was carried out to identify the factors
affecting construction cost estimation. The
factors were identified based on questionnaire
Internation
Factors survey. Questionnaires were given to 64 experts
al Journal
Affecting in the construction industry to determine the
of Recent
Shabniya Construction importance of construction cost estimation and
Trends in
6 V. Cost to determine the score of each factor. Statistical
Engineerin
[2017] Estimation of analysis was carried out on the feedback of the
g&
Building respondents of the survey. The significance of
Research
Projects each factor used in the questionnaire was
(IJRTER)
determined. The significant factors were
identified using the mean score and their p-
value.
20
Project Phase 1, BE CIVIL (2021-22), Group No. 10
MET's Institute of Engineering, Civil Engineering Department (Project Phase I )
Contd…
Sr. Title of Name of
References Highlights
No. Paper Journal
The main goals of this paper were
getting buildings constructed or
Reducing Time modified in less time and cost by
and Cost of producing superior wall panels and
Construction improving the properties of normal
Ahmed AL. Projects by Science Direct weight concrete panels. Superior wall
7 et. al. improving the : Procedia panels were new panels that provide
[2016] Properties of Engineering the three properties listed above. The
Precast Normal- results from sample calculations
Weight Wall indicate considerable improvement in
Panels these properties and significant
savings in terms of construction time
and costs.
21
Project Phase 1, BE CIVIL (2021-22), Group No. 10
MET's Institute of Engineering, Civil Engineering Department (Project Phase I )
Contd…
Sr. Title of Name of
References Highlights
No. Paper Journal
Time and cost are two main concerns which
increase importance of cost reduction
techniques. Reduction of cost of
International construction was a constant goal for
Journal of construction industry. One way of reducing
Cost
Mahadik U. Engineering construction cost was to develop innovative
Reduction in
8 et. al. Technology, technologies as well as methodologies to
Construction
[2016] Management increase productivity. This paper covers
Projects
and Applied types of cost, factors affecting cost of
Sciences projects as well as discussion on
achievement of satisfactory results of time
and cost by applying cost reduction
techniques.
22
Project Phase 1, BE CIVIL (2021-22), Group No. 10
MET's Institute of Engineering, Civil Engineering Department (Project Phase I )
Contd…
Sr. Title of Name of
References Highlights
No. Paper Journal
The aim of project was to finish the projects
on time, within budget and to achieve other
project objectives. It was a difficult task
Internation
Effective undertaken by project managers in practice,
al Journal
Techniques in which include constantly measuring progress,
of Research
Rajguru A. Cost evaluation of plans, and corrective actions
in
9 et. al. Optimization should be taken whenever required.
Engineerin
[2015] of Construction Optimization is a systematic effort made to
g and
Project: An improve profit margins and obtain the best
Technology
Review results under given circumstances. There was
(IRJET)
a Systematic planning and programming with
effective management is necessary for timely
completion of the project.
23
Project Phase 1, BE CIVIL (2021-22), Group No. 10
MET's Institute of Engineering, Civil Engineering Department (Project Phase I )
Contd…
Sr. Title of Name of
References Highlights
No. Paper Journal
The paper deals with an introduction and
implementation of super performing
AICMT: building materials and techniques all in
National terms of energy saving efficiency of the
conference on material, cost efficiency, application
Smart
Dogne N. Alternative & feasibility, availability, vernacular
Construction
10 et. al. innovation characteristics, life span, etc. The paper
Materials &
[2014] Construction provided an overview of the types of
Techniques
Materials & materials available giving a new insight
Techniques into innovative methods and techniques that
will be available, and open new doors for
advancement and improvement in the
construction industry.
24
Project Phase 1, BE CIVIL (2021-22), Group No. 10
MET's Institute of Engineering, Civil Engineering Department (Project Phase I )
Contd…
Sr. Title of Name of
References Highlights
No. Paper Journal
Construction industry deserves the second
largest one in India. The infrastructure growth
of a country depends on the development of
Internation
Research construction industry since it teems with ample
al Journal
Methodology employment potential. Implementation of
Georgekut of
for Material infrastructure projects were usually failing in
ty K. Engineerin
11 Optimization each stage and ultimately failure occur, which
et. al. g Research
in leads to cost and time overrun. The real
[2012] &
Construction problem is construction become difficult since it
Technology
Projects will not complete with in the budget cost and
(IJERT)
time and finally leads to project failure as end
result. The methodology adopted had been
validated by a computer program.
25
Project Phase 1, BE CIVIL (2021-22), Group No. 10
MET's Institute of Engineering, Civil Engineering Department (Project Phase I )
Contd…
Sr. Title of Name of
References Highlights
No. Paper Journal
This paper was written to fill a void created by
the absence of proper materials management on
construction sites. To managing a productive
National
and cost efficient site efficient material
Construction Conference
management was very essential. Research has
Patel K. Materials on Recent
shown that construction materials and
12 et. al. Management Trends in
equipment may constitute more than 70% of the
[2011] on Project Engineerin
total cost for a typical construction project. This
Sites g&
paper described the main results of survey
Technology
carried out in Ahmedabad that investigated the
material management of 3 well known builders
of Ahmedabad.
26
Project Phase 1, BE CIVIL (2021-22), Group No. 10
MET's Institute of Engineering, Civil Engineering Department (Project Phase I )
RESEARCH GAP
In research work there is lack of study on cost optimization of construction projects.
Hence it is taken into account for the study. Also, there is lack of research work available on cost
optimization of construction projects.
SIGNIFICANCE OF RESEARCH
The research will encourage the new approach in construction field.
The study surely is a step forward in the right direction to achieve economical construction and
low cost housing. it also helpful low income group of peoples.
27
Project Phase 1, BE CIVIL (2021-22), Group No. 10
MET's Institute of Engineering, Civil Engineering Department (Project Phase I )
28
Project Phase 1, BE CIVIL (2021-22), Group No. 10
MET's Institute of Engineering, Civil Engineering Department (Project Phase I )
29
Project Phase 1, BE CIVIL (2021-22), Group No. 10
MET's Institute of Engineering, Civil Engineering Department (Project Phase I )
RESEARCH METHODOLOGY
Problem statement from literature survey :-
Introduction
Literature Review
Comparative Analysis
Conclusion 31
Project Phase 1, BE CIVIL (2021-22), Group No. 10
MET's Institute of Engineering, Civil Engineering Department (Project Phase I )
33
Project Phase 1, BE CIVIL (2021-22), Group No. 10
MET's Institute of Engineering, Civil Engineering Department (Project Phase I )
Phase – II Work
Case Study for Different Projects
Comparative Analysis
REFERENCES
[1] M. Arun, K. Baskar, B. S. Geethapriya, M. Jayabarathi and R. Angayarkkani, “Affordable Housing:
Cost Effective Construction Materials for Economically Weaker Section”, Science Direct: Materilas
Today: Proceedings, January 2021.
[2] Shafayet Ahmed and Ingrid Arocho, “Analysis of Cost Comparison and Effects of Change Orders
During Construction: Study of a Mass Timber and a Concrete Building Project”, Science Direct:
Journal of Building Engineering, 33, 101856, 2021.
[3] Muhammad Ali Musarat, Wesam Salah Alaloul and M.S. Liew, “Impact of Inflation Rate on
Construction Projects Budget: A Review”, Science Direct: Ain Shams Engineering Journal, 2020.
[4] Hayssam O. Elhusseiny, Ibrahim Nosair and A. Samer Ezeldin, “Systematic Processing Framework
for Analyzing The Factors of Construction Projects Delays in Egypt”, Science Direct: Ain Shams
Engineering Journal, 2020.
35
Project Phase 1, BE CIVIL (2021-22), Group No. 10
MET's Institute of Engineering, Civil Engineering Department (Project Phase I )
Contd…
[5] Akshay Gulghane, Nikhil Pitale and Sanket Sanghai, “Time and Cost Optimization of Construction
Project Using Mivan Technology”, Journal of Engineering Research and Application, ISSN: 2248-
9622, Volume 8, Issue 8 (Part -II), pp. 70-74. August 2018.
[6] Shabniya V, “Factors Affecting Construction Cost Estimation of Building Projects”, International
Journal of Recent Trends in Engineering & Research (IJRTER), Volume 03, Issue 04, pp. 379-387,
April 2017.
[7] AL Kulabi Ahmed and Hakob Avetisyanb, “Reducing Time and Cost of Construction Projects by
improving the Properties of Precast Normal-Weight Wall Panels”, Science Direct : Procedia
Engineering, Volume 145, pp. 1066 – 1073, 2016.
[8] Urmila A Mahadik, “Cost Reduction in Construction Projects”, International Journal of Engineering
Technology, Management and Applied Sciences, Volume 3, Special Issue, pp. 397-400, September
2015.
36
Project Phase 1, BE CIVIL (2021-22), Group No. 10
MET's Institute of Engineering, Civil Engineering Department (Project Phase I )
THANK
YOU
37
Project Phase 1, BE CIVIL (2021-22), Group No. 10