Capacity Planning
Capacity Planning
Change Over Time (i,j) Total Processing Time Queuing Time (j) Dismantling Time (i) Setting Time (j) Processing Time
Waiting Time
Move Time
Loading Time
Run Time
Unloading Time
Work Center WC 1
Processing Time
Loading Time
Run Time
Dismantling Time
Work Center WC 1
Work Center WC 2
Production Planning and Master Scheduling involve the determination of future production levels over a time horizon of several months to 1 yr. They are tactical planning decisions They respond to a firms overall business plan
The production plan sets an intermediaterange goal for the companys products and capacity utilization in total The master schedule provides the input for detailed scheduling and control at the operational level
Manufacturing, Marketing, and Financial plans must be coordinated Poor production planning can lead to excessive inventory levels or backorders and thus increase cost or reduce service level.
Accurate forecasts can be made for aggregate groups of items, particularly over long time horizon Since production plans are made for up to 1 year time, demand and production/inventory levels are usually expressed by aggregate measures of capacity such as dollars, tons, gallons, machine hours, or units of product groups
Sales Forecasting
Quality Control
HR
Production
DISPAT CHING
Stores
Finance
Purchasing
Demand Estimation
Accounting
MPS
Marketing
Strategic Plans
Forecasts
Services
Orders
Inventory Adjustment
Materials
Marketing
Production Planning
Total Cap
11.1111 22.2222 33.3333 44.4444
MONTHLY PLAN
1 2 3 4 5 6 7 8 9
CAPACITY m/c center 1 WC1 WC2 WC3 WC4 2 3 4 5 Month 6 7 8 9 10 11 12 Cash in Cash out + or Total Cap
m/c center
ORDERS M/c AA BB CC DD
Category 11.1111 22.2222 33.3333 44.4444
Qty 50 20 70 10
Qty 500 300 400 200
On hand 55 70 5 20
Adj 20 30 20 -
FORECAST
DEMAND ESTIMATION
WAREHOUSE REQ Category Name 11.1111 22.2222 33.3333 44.4444 Troya Prothesis Plates Knee Qty 10 20 5 30
DEMAND ESTIMATION Category 11.1111 22.2222 33.3333 44.4444 Name Troya Prothesis Plates Knee Qty 580 370 495 230
DEMAND ESTIMATION Category 11.1111 22.2222 33.3333 44.4444 Name Troya DEMAND ESTIMATION Prothesis Plates Knee
SALES DISTRIBUTION
CAPACITY
Qty 580
m/c center 1 2 3 4
month 5 6 7 8 9
Total Cap
CAPACITY
WC1 WC2 WC3 WC4 MONTHLY PLAN Total CASH FLOW 1 2 3 4 5 6 7 8m/c 9 center 1 Cash in Cash out Total Cap
Wc7
1 2 3 4 5 6 7 8 9 11.1111 22.2222 33.3333 44.4444 11.1111 22.2222 33.3333 CAPACITY REQ PER UNIT 44.4444 Work Center
wc1 wc2
SALES DISTRIBUTION
CASH FLOW
month 5
Total 7 8 9
m/c center
+ or -
2 6 5 -
5 7 4
wc3
wc4
wc5
wc6
min 17 17 25 12
3 -
6 6 1
1 5 2
3 5
6 -
Aggregate Plan
Orders
Forecast
MPS
Product File
Inventory File
MRP SYSTEM
Manufacturing file
MRP
Material List
BOM
Purchasing
Production Planning
Insensitive to Capacity
MPS
Capacity Adequat e
YES
Hours
Work Load
MRP SYSTEM
Aggregate Plan
Production Planning
Material Issue Order Inspection Order Move order
Follow up
Planning section
Workshop
Tool Stores
ORDER DISPACTCHING
Aggregate production planning is the development of monthly or quarterly production requirements that will meet the estimates of demand. Gross capacity considerations must be taken into account during production planning.
If production to satisfy demand cannot be achieved within existing resource limitation, then management may have to make intermediate-range capacity adjustments. If long-term trends are evident, then management may also wish to consider strategic resource changes
The master schedule is not a forecast, but rather a schedule of when production should be completed. The MPS is used by operating personnel to make detailed plans for the procurement of materials, the production of components, and final assembly of the finished goods.
The Rough Cut Capacity Plan involves the analysis of the MPS to determine if sufficient capacity is available at critical points in the production process It focuses on specific operations such as final assembly, painting, or finishing to determine where bottlenecks will probability occur. This provides a rapid determination of the feasibility of the master production schedule.
Opening inventory from filters= 80,000 Ending inventory from filters = 50,000 Projected demand during the year=500,000 Total production required=
500,000 (50,000-80,000) = 470,000 Monthly production = 470,000/12 = 39,167 filter/month
Transportation model is useful in situations when several sources of production are available (for example, regular time, overtime, and subcontracting), where production and inventory costs are linear, and where there is a limited capacity for each source in each period.