0% found this document useful (0 votes)
16 views15 pages

Presentation Updated Wo Read-Only Read-Only 2023.11.07

j j
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
16 views15 pages

Presentation Updated Wo Read-Only Read-Only 2023.11.07

j j
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
You are on page 1/ 15

WEEKLY PROGRESS MEETING

MEETING NO: 34
DATE: 08-11-2023

CONSTRUCTION OF CYCLE PATH (SECTION F-G-C)


PROJECT NO:- RPD:23/007
CONTRACT VALUE: 2,445,035.353 BHD (LUMPSUM)
EMPLOYER: MINISTRY OF WORKS
ENGINEER: PARSON GLOBAL SERVICES LIMITED
CONTRACTOR: KINGDOM ASPHALT CO. W.L.L
COMMENCEMENT DATE: 05 th MARCH 2023
DATE OF COMPLETION: 02 nd JULY 2023
REVISED(1st) COMPLETION DATE: 17 th AUG 2023
REVISED(2nd) COMPLETION DATE: 10 th DEC 2023
CONTRACT DURATION: 17 WEEKS+7 WEEKS+
EMPLOYE
ENGINEER CONTRACTOR
R
PROJECT STAGES

CH 33+050.00

Ch 10+893
STAGE 3

STAGE 1 Ch 6+326.060 STAGE 2 Ch 29+600


Ch 0+060
`

Ch 25+000
EMPLOYE CONTRACTOR
ENGINEER
R
WORK progress in stage 1(Ch 0+060 ~
6+326.060)
Start of project Ch
Sta.0+060.000
6+326.060
--- ch 0+060 to ch 1+420
WEARING COURSE(GL10)
COMPLETED

--- Ch 4+160
CULVERT IN
--- Ch 1+340 FINISHING STAGE --- Ch 1+420 TO
CULVERT in 6+326
finishing WEARING
stage COURSE(GL10)
--- Ch 3+440 CULVERT COMPLETED
IN FINISHING STAGE
WORK progress in stage 2(CH 6+326~10+893)
Ch
10+893.00
--- Ch 6+326 TO
10+843
ASPHALT WEARING
COURSE (GL10)
COMPLETED

Ch 6+243.00
--- RCd Duct work
done
CARRIAGEWAY
EMPLOYE CONTRACTOR
R 6.6m ENGINEER
WORK progress in stage 2(CH 25+000~29+640)
--- Ch 25+000 TO 29+600 RCd
& EDD Duct works are
completed

cc
oo

--- Ch `25+000 TO
EMPLOYE 29+600 --- Ch 25+000 TO 29+600
CONTRACTOR
ENGINEER
R ASPHALT wearing IRRIGATION Duct works are
COURSE COMPLETED COMPLETED
WORK progress in stage 3(CH 29+600~33+050)
--- Ch 50+000 TO
50+327
ASPHALT BASE
CH.50+000 . COURSE completed
--- Ch 32+045 TO 00
33+045 RCd & EDD CH.50+327.0
Duct completed for CYCLE TRACK 5.3m 0
cw& ct
CH.33+045 .
00
--- Ch 32+030 to
33+045
CH.10+893 . CARRIAGEWAY ASPHALT BASE
00 6.6m COURSE ongoing

Ch 31+000 to 32+030
Laying of road base
final layer
CH.29+600 . Ch 29+566 to 31+000
00 formation preparation --- Ch 32+045 TO
works in progress 33+045 irrigation
ducts completed for
cw& ct
OVERALL
PLANNED OVERALL
PROGRESS
86%
ACTUAL OVERALL
83.44%

EMPLOYE CONTRACTOR
ENGINEER
R
Contract Financial Progress
(Status of Payment)
IPC NO. Claimed Certified Payment Outstanding
amount amount Received amount

IPC #1 310,736.700 159,600.840 159,600.84 -


0
IPC #2 423,356.160 196,562.057 196,562.05 -
7
IPC #3 525,912.702 262,070.302 262,070.30 -
2
IPC #4 714,604.701 367,586.172 367,586.17 -
Total Claimed amount 3,051,166.23 2 % 100%
IPC Certified
Total #5 525,483.129
amount 101,282.391
1,087,101.76 N/A Planned
101,282.391
IPC Payment
Total #6 551,072.838
Received N/A
985,819.37 %N/A
Actual
N/A Total Project Value 76.96%
Total Outstanding amount 101,282.391 (Excl. street light & 1,724,912.54
Provisional Sum)
EMPLOYE Incl. VO CONTRACTOR
ENGINEER
R
PROGRESS PHOTOGRAPHS
Removing of existing road base of the carriageway

EMPLOYE CONTRACTOR
ENGINEER
R
PROGRESS PHOTOGRAPHS
formation preparation of the carriageway sta@ ch 33+045

EMPLOYE CONTRACTOR
ENGINEER
R
PROGRESS PHOTOGRAPHS
Laying of Road base materials for carriageway sta@ ch 33+020

EMPLOYE CONTRACTOR
ENGINEER
R
PROGRESS PHOTOGRAPHS
Prime coat application for the carriageway sta@ cH 33+020 to CH 32+030

EMPLOYE CONTRACTOR
ENGINEER
R
PROGRESS PHOTOGRAPHS
Road marking works for cycle track sta at ch 10+843