SPECIFICATION
a) Time Limit: The work is to be completed within stipulated time limit as specified in the
Notice inviting tender which shall be reckoned from the date of written order of
commencing the work and shall be inclusive of monsoon period.
b) Tender Rate : No alteration in the form of tender and the schedule of tender and no
additions in the scope or special stipulation will be permitted. Rates quoted for the
tender shall be taken as applicable to all leads and lifts.
c) Tender Units : The tenderers should particularly note the unit mentioned in the
Schedule "B" on which the rates are based . No change in the units shall be allowed. In
the case of difference between rates written in figures and words the correct rate will
be the one which is lower of the two.
d) The Income Tax @ 2% or percentage in force from time to time or at the rate as
intimated by the competent Income Tax authority shall be deducted from bill amount
whether measured bill advance payment or secured advance .
TENDERING PROCEDURE
Contractors can ask questions online (check the tender notice). A pretender meeting is
open to all who have downloaded the tender form before the meeting. In this meeting
contractors can get clarification about the work and tender conditions. Contractors
can also submit their questions online through the "post query" option and the
answers will be posted as a Common Set of Conditions/Deviations (C.S.D.) which will
apply to everyone. Any question not included in the C.S.D. will be considered rejected.
Tenders must be based on these clarifications and cannot have any conditions or they
will be rejected. No further individual replies will be given after this
Landline no 02030187500 for any assistance on the use of electronin
tendering system
Envoloped 2 :
Quote your offer in itemwise rates in the tender documents but only in
Envelope No. 2—do not mention prices anywhere in Envelope No. 1.
EARNEST MONEY
(a) Earnest money shall be paid via online using NEFT/RTGS or payment gateway mode
After Tender opening the EMD of the unsuccessful bidder will be returned to account
provided by the bidder during the bid preparation as given in challan under Beneficiary
Account Number.
(b) The amount will be refunded to the unsuccessful tenderers on deciding about the
acceptance or otherwise of the tender. In case of successful tenderer it will be refunded on
his paying initial Security Deposit and completing the tender documents.
SECURITY DEPOSIT
The successful bidder must provide 50% of the initial security deposit in the form of a
National Saving Certificate Fixed Deposit Receipt or Bank Guarantee payable at
Aurangabad pledged to the Maharashtra Pollution Control Board Mumbai.
1. The successful bidder must Submit 50% of the initial security deposit through:
National Saving Certificate (NSC)
Fixed Deposit Receipt (FDR)
Bank Guarantee (BG)
Payable at Aurangabad and pledged to Maharashtra Pollution Control Board Mumbai
or via a Nationalised or Scheduled Bank payable at Mumbai.
Failure to provide this will result in forfeiture of earnest money.
2. Deduct the remaining 50% from the running account bill at 1% with the total security
deposit equaling 2% of either:
The accepted tender value or
The estimated tender value whichever is higher.
3. Option to submit the security deposit through a Bank Guarantee covering the entire
project period which should be extendable if required by the Engineerincharge.
4. Deductions for compensation or amounts owed under this or other contracts can be
made from the security deposit with a requirement to replenish the deposit within 10
days after notice if deductions reduce the amount.
5. No interest on the security deposit.
6. Refund of the deposit will occur after the defect liability period is completed in line
with Clauses 1 and 20 of the contract.
CONDITION FOR PAYMENT OF ADDITIONAL PERFORMANCE SECURITY
DEPOSIT IF THE OFFER IS RECEIVED LOWER MORE THAN 1% BELOW (As per
G R. 26.11.2018)
1.Additional Performance Security Deposit Requirement: If the lowest successful
bidder's offer is more than 1.00% below the estimated cost an Additional Performance
Security Deposit must be paid within 8 days of opening the financial bid (2nd envelope).
This deposit should be drawn in favor of the concerned Member Secretary
Maharashtra Pollution Control Board Mumbai via Demand Draft only.
The 8day deadline will not be extended.
F) The Additional Performance Security amount must be rounded to two decimal places.
G) The deposit should be submitted via Demand Draft from a Government or Scheduled
Bank payable to the Concerned Member Secretary Maharashtra Pollution Control Board
Mumbai and must include the bank's MICR and IFSC codes.
H) The Additional Performance Security will be refunded upon issuance of the Certificate of
Satisfactory Completion of Works by the Member Secretary. In any other case the deposit
will be forfeited.
I) If the lowest successful bidder (with an offer more than 1% below the estimated cost)
fails to deposit the Additional Performance Security within 8 days the Earnest Money
Deposit (EMD) will be forfeited and the second lowest bidder will be invited for negotiation.
J) No interest will be paid on the Additional Performance Security deposit during the period
it is held by the Maharashtra Pollution Control Board.
19.0 VALIDITY PERIOD:
The offer shall remain open for acceptance for minimum period of 90 days from the Date of
opening of Envelope No.2 (Financial Bid) and thereafter until it is withdrawn by the
contractor by notice in writing duly addressed to the authority opening the tender and sent
by Registered Post Acknowledgment due.
20.0 After completion of the etendering process the successful bidder will have to submit
the hard copy of downloaded tender document and drawings duly signed on each page by
the contractor or his authorised signatory. The tender should be full signature of the
tenderer or his authorized power of attorney holder in case of Firm.
23.0 The Goods and Services Tax @ 2 % of the contract amount will be recovered from the
bill of the registered contractors who are registered under Act. (1% CGST + 1 % SGST).
24.0 Contractor shall submit a certificate to the effect that “All the payments to the staff are
made in bank accounts of labou linked to Unique Identification Number (AADHAR CARD).”
The certificate shall be submitted by the contractor within 60 days from the commencement
of contract. If the time period of contract is less than 60 days then such certificates shall be
submitted within 15 days from the date of commencement of contract.
26.0 Clause 38 : Claims for Quantities Entered in the tenders
Excess quantity of any work shall be executed by prior permission of competent
authority. The Quantities Shall be payable at accepted tender rates only.
27.0 No negotiations will be held for rates terms and conditions therefore bidders
have to quote their comparative rates.
28.0 OTHER CONDITIONS :
1) The contractor shall submit the “Hard Copy” of the tender documents within 72
hours from the date of bid lock (In case of www.maharashtra.etenders.in). The
hard copy shall invariably contain all the documents which are submitted online.
2) The contractor shall submit only those documents which are required in the
tender documents. Uploading of unnecessary attachments with the tender should
be avoided.
3) This hard copy shall be referred only in case of any problem in online tender
opening process.
4) The contractor shall submit valid proof of deduction and payment of Profession
Tax of “technical persons employed by the contractor”
ADDITIONAL GENERAL CONDITIONS AND SPECIFICATIONS
1. CONTRACTOR TO STUDY SITE CONDITIONS
The contractor shall be deemed to have carefully examined the work and site
conditions including labour the general and the special conditions specifications
schedules and drawings and shall be deemed to have visited the site of work and to
have fully informed himself regarding the local conditions and carried out his own
investigation to arrive at the rates quoted in the tender system. In this regard he will
be given necessary information to the best of the knowledge of MPCB but without any
guarantee about it.