Applied Software Project Management
Applied Software Project
Management Introduction
http://www.stellman-greene.com 1 Andrew Stellman & Jennifer Greene
Applied Software Project Management
Why do software projects fail?
People begin programming before they understand the problem Everyone likes to feel that they’re making progress When the team starts to code as soon as the project begins, they see immediate gains When problems become more complex (as they always do!), the work gets bogged down In the best case, a team that begins programming too soon will end up writing good software that solves the wrong problem
http://www.stellman-greene.com 2 Andrew Stellman & Jennifer Greene
Applied Software Project Management
Why do software projects fail?
The team has an unrealistic idea about how much work is involved. From far away, most complex problems seem simple to solve Teams can commit to impossible deadlines by being overly optimistic and not thinking through the work Few people realize the deadline is optimistic until it’s blown
http://www.stellman-greene.com 3 Andrew Stellman & Jennifer Greene
Applied Software Project Management
Why do software projects fail?
Defects are injected early but discovered late. Projects can address the wrong needs Requirements can specify incorrect behavior Design, architecture and code can be technically flawed Test plans can miss functionality The later these problems are found, the more likely they are to cause the project to fail
http://www.stellman-greene.com 4 Andrew Stellman & Jennifer Greene
Applied Software Project Management
Why do software projects fail?
Programmers have poor habits – and they don’t feel accountable for their work. Programmers don’t have good control of their source code Code written by one person is often difficult for another person to understand Programmers don’t test their code, which makes diagnosing and fixing bugs more expensive The team does not have a good sense of the overall health of the project.
http://www.stellman-greene.com 5 Andrew Stellman & Jennifer Greene
Applied Software Project Management
Why do software projects fail?
Managers try to test quality into the software. Everyone assumes that the testers will catch all of the defects that were injected throughout the project. When testers look for defects, managers tell them they are wasting time. When testers find defects, programmers are antagonized because they feel that they are being personally criticized. When testers miss defects, everyone blames them for not being perfect.
http://www.stellman-greene.com 6 Andrew Stellman & Jennifer Greene
Applied Software Project Management
How can we make sure that our
projects succeed? Make sure all decisions are based on openly shared information It’s important to create a culture of transparency, where everyone who needs information knows where to find it and is comfortable looking at it. All project documents, schedules, estimates, plans and other work products should be shared with the entire team, managers, stakeholders, users and anyone else in the organization who wants them. Major decisions that are made about the project should be well-supported and explained.
http://www.stellman-greene.com 7 Andrew Stellman & Jennifer Greene
Applied Software Project Management
How can we make sure that our
projects succeed? Don’t second-guess your team members’ expertise Managers need to trust team members. Just because a manager has responsibility for a project’s success, it doesn’t mean that he’s more qualified to make decisions than the team members. If you don’t have a good reason to veto an idea, don’t.
http://www.stellman-greene.com 8 Andrew Stellman & Jennifer Greene
Applied Software Project Management
How can we make sure that our
projects succeed? Introduce software quality from the very beginning of the project Review everything, test everything. Use reviews to find defects – but don’t expect the review to be perfect. Use reviews to gain a real commitment from the team. It’s always faster in the long run to hold a review than it is to skip it.
http://www.stellman-greene.com 9 Andrew Stellman & Jennifer Greene
Applied Software Project Management
How can we make sure that our
projects succeed? Don’t impose an artificial hierarchy on the project team All software engineers were created equal. A manager should not assume that programming is more difficult or technical than design, testing or requirements engineering. Managers should definitely not assume that the programmer is always right, or the tester is always raising false alarms.
http://www.stellman-greene.com 10 Andrew Stellman & Jennifer Greene
Applied Software Project Management
How can we make sure that our
projects succeed? Remember that the fastest way through the project is to use good engineering practices Managers and teams often want to cut important tasks – especially estimation, reviews, requirements gathering and testing. If it were faster to build the software without these practices, we would never use them. Every one of these practices is about saving time and increasing quality by planning well and finding defects early. Cutting them out will cost time and reduce quality.
http://www.stellman-greene.com 11 Andrew Stellman & Jennifer Greene