Submit Tal
Submit Tal
Mechanical & Chemical Supplies Co. Ltd. (MCC) is one of the leading distributors of
electromechanical products in the kingdom of Saudi Arabia and other GCC countries with more than
40 years of experience, specializing in the supply and distribution of plumbing systems and sanitary
accessories for both private and governmental projects.
And as part of our success, we have demonstrated great partnership and commitment with our
affiliates in the field in order to support our customers with high quality products.
BENKAN
CHERO – Italy
TMK – Russia/UKRAINE
ASTORE - Italy
NIBCO – USA
REDI – Italy
Copper pipes and fittings
Mueller – USA (Pipes & Fittings)
Allpex – UK
Thermo Flex Rubber Insulation
NIBCO – USA
DESBORDES – FRANCE
ESSETI – ITALY
PEGLER – UK
S.M.H.M – FRANCE
HUWA – Holland
Water Heaters
A.O. Smith – USA
Sinks
Saudi Ceramics – KSA
Grooved Fittings
Grinnell - USA
Sanitary Fixtures Valves & Bathroom
Accessories
Bradley Corporation – USA
Mansfield – USA
GROHE – Germany
T&S - USA
Delta
Pressure Tanks
REFLEX – Germany
ZILMET – Italy
Test Plugs
Horobin - UK
Rubber and Fibers Insulation
ARMACELL – Germany
KIMMCO – KUWAIT
AFICO - KSA
Water Treatment
Arch Chemicals - USA
Drainage Systems
J.R. Smith– USA
Zurn - USA
Trap Primer
PPP – USA
Soldering Rod
HARRIS – USA
Neutralization Tanks
Orion tanks - USA
Highland Tank
Storage Tanks.
Blucher
Stainless Steel (304) or (316L) Channel &
Grating.
Drainage System, Stainless Steel.
KING
ABDULLAH UNIVERSITY OF SCIENCEAND
(KAUST)
TECHNOLOGY
PRINCESS
NORA BINT ABDULRAHMAN
UNIVERSITY
HILTON HOTEL – jEDDAH
HILTON HOTEL – MADINA
SULTAN BIN ABDULAZIZ HUMANITARIAN CITY
SAUDI ARAMCO
KING ABDULLAH FINANCIAL DISTRICT (KFD)
DR SULAIMAN AL HABIB HOSPITALS
DOKA ALQAL’A PROJECT
ROYAL COMMISSION
KING SAUD UNIVERSITY
HARAMAIN HIGH SPEED RAIL PROJECT
MINISTRY OF INTERIOR PROJECTS
KING
ABDULLAH UNIVERSITY OF SCIENCEAND
(KAUST)
TECHNOLOGY
KING SAUD UNIVERSITY
GENERAL AUTHORITY OF CIVIL AVIATION
PRINCESS
NORA BINT ABDULRAHMAN
UNIVERSITY
DOKA ALQAL’A PROJECT
IMAM
MUHAMMAD IBN SAUD ISLAMIC
UNIVERSITY
KING ABDULLAH FINANCIAL DISTRICT (KFD)
KING ABDUL AZIZ UNIVERSITY (KAUU)
KINGABDUL AZIZ INTERNATIONAL AIRPORT
(KAIA)
SHUMAISY & SHANIA MAKKAH
KING
ABDULLAH UNIVERSITY OF SCIENCEAND
(KAUST)
TECHNOLOGY
KING ABDULLAH ECONOMIC CITY ( KAEC )
KING ABDULLAH FINANCIAL DISTRICT (KFD)
GOSI OLAYA TWIN TOWERS
DEVELOPMENT OF KING ABDULAZIZ ENDOWMENT PROJECT
(DOKAAE)
PRINCESS NORA BINT ABDULRAHMAN UNIVERSITY
ALFAYSALIYA TOWER
THE KINGDOM TOWER
EMERGENCY LODGING CENTER – SHUMAISY
MINISTRY OF INTERIOR PROJECT
KING SAUD UNIVERSITY
PRINCESS
NORA BINT ABDULRAHMAN
UNIVERSITY
KING ABDULAZIZ INTERNATIONAL AIRPORT
KING KHALID INTERNATIONAL AIRPORT
THE TWO HOLY MOSQUES
ROYAL COMMISSION
ROYAL HALL – JEDDAH – RIYADH
KING SAUD UNIVERSITY (KSU)
PRINCESS
NORA BINT ABDULRAHMAN
UNIVERSITY
HARAM CAR PARKING ExTENSION – MADINA
KING ABDULAZIZ INTERNATIONAL AIRPORT
( KAUST)
KING SAUD UNIVERSITY (KSU)
KING ABDULLAH FINANCIAL DISTRICT
(KFD)
DAR ALQIBLA PROJECT -MADINA
EMERGENCY LODGING CENTER –
SHUMAISY
Quality design
In the BLÜCHER® stainless steel drainage system, these inherent advantages
of stainless steel are enhanced by sophisticated product design and carefully
prepared technical solutions. The BLÜCHER® products are made entirely from
high-performance austenitic stainless steel grade AISI 304 or, for the most
demanding corrosive environments, grade AISI 316L. All products are
chemically descaled to enhance their natural corrosion resistance and to
provide a uniform matt-silver surface finish.
This is a multi-site certificate, additional site(s) are listed on the next page(s)
BureauVertiasCertc
fi
iato
inHod ln
igSAS–UKBranchcerte
fi
isthatheManagement
Systemoftheaboveorgansiato
inhasbeenaudtiedandfoundtoben iaccordancewtihthe
requriementsofthemanagementsystemstandardsdetaelidbeo
lw
ISO 9001:2015
Scopeofcertc
fi
iato
in
Cerc
tfi
iato
inBodyAddress:5thFo
lo6
,r6PrescotStreetL
,ondonE
,18HGU
, ntiedKn
igdom
LocaO
l fice:16800Greenspon
itParkDrv
ieS
,ute
i300SH
, oustonT
,X77060U
, SA
Further clarifications regarding the scope and validity of this certificate, and the applicability of the management system
requirements, please call: +(800) 937-9311
1/3
NIBCO, INC.
ISO
9001:2015
Scopeofcertc
fi
iato
in
Site 2 6410 S. 33rd St. McAllen, TX 78502 USA Bronze Valve Assembly and Warehousing
Cerc
tfi
iato
inBodyAddress:5thFo
lo6
,r6PrescotStreetL
,ondonE
,18HGU
, ntiedKn
igdom
LocaO
l fice:16800Greenspon
itParkDrv
ieS
,ute
i300SH
, oustonT
,X77060U
, SA
Further clarifications regarding the scope and validity of this certificate, and the applicability of the management system
requirements, please call: +(800) 937-9311
2/3
NIBCO, INC.
ISO
9001:2015
Scopeofcertc
fi
iato
in
701 Eisenhower Dr North Goshen, IN 46526 Manufacturing of ABS, PVC, CPVC, PP,
Site 6
USA PVDF and PPSU Fittings and Valves
Cerc
tfi
iato
inBodyAddress:5thFo
lo6
,r6PrescotStreetL
,ondonE
,18HGU
, ntiedKn
igdom
LocaO
l fice:16800Greenspon
itParkDrv
ieS
,ute
i300SH
, oustonT
,X77060U
, SA
Further clarifications regarding the scope and validity of this certificate, and the applicability of the management system
requirements, please call: +(800) 937-9311
3/3
CERTIFICAT
E
Management system as per
ISO 9001 : 2015
The Certification Body TÜV NORD CERT GmbH hereby confirms as a result of the audit,
assessment and certification decision according to ISO/IEC 17021-1:2015, that the organization
operates a management system in accordance with the requirements of ISO 9001:2015 and will be
assessed for conformity within the 3 year term of validity of the certificate.
Scope
Certifcation Body
Plovdiv, 2021-02-17
at TÜV NORD CERT GmbH
NIBCO range of gate valves with bronze bodies, cast bronze wedge, PTFE stem packing and non-rising spindles. Maximum working pressure
20.0 bar. Maximum operating temperature 100°C.
https://www.wrasapprovals.co.uk/approvals-directory/?company=12821&perpage=all 1/1
Catalogues
Water Hammer Arrestors
w a t t s . c o m
What is
Water Hammer?
T
he noise from banging pipes is caused by shocks of Dishwashers, clothes washers, fast closing positive shutoff
high speed water flowing in the piping system when valves incorporated in the system, all contribute to creating
a fixture is suddenly closed. Sudden stoppage of the water shock which is not only annoying but damaging to
water (a non-compressible liquid) flowing at a given pres- pipes and appliances. Watts Water Hammer Arrestors
sure and velocity causes a surge or spike of pressure and incorporate a permanent pre-charged sealed air chamber
is called water hammer. When this occurs a pressure wave to absorb the shock. The sealed chamber prevents the loss
travels back through the piping until it finds a point of relief. of air to the water and ensures long and trouble-free life.
All potential leak points are permanently sealed.
Table A — Fixture Units Sizing Information Table B — Series 15M2 Sizing and Selection
SIZE (DN) CROSS FIXTURE UNITS REF. PDI STANDARD
WEIGHT IN FIXTURE-UNITS
TYPE OF PUBLIC PRIVATE In. mm
FIXTURE SUPPLY TOTAL C.W. H.W. TOTAL C.W. H.W. ⁄
12 15 1-11 A
3⁄4 20 12-32 B
CONTROL
1 25 33-60 C
11⁄4 32 61-113 D
Water Closet 1.66 PF Flush Valve 8 8 – 5 5 – 11⁄2 40 114-154 E
Water Closet 1.66 PF Flush Tank 5 5 – 2.5 2.5 – 2 50 155-330 F
Pedestal Urinal 1.06 Flush Valve 4 4 – – – –
PF
Stall or Wall Urinal Flush Valve 1.06 4 4 – – – –
PF
Stall or Wall Urinal Flush Tank 1.06 PF 2 2 – – – –
Lavatory Faucet 2 11⁄2 11⁄2 1 1 1
Bathtub Faucet 4 2 3 2 11⁄2 11⁄2
Shower Head Mixing Valve 4 2 3 2 1 2
Bathroom Group Flush Valve Closet – – – 8 8 3
Bathroom Group Flush Tank Closet – – – 6 6 3
Separate Shower Mixing Valve –
For additional information, send for ES-15M2. – – 2 1 2
Service Sink Faucet 3 3 3 – – –
Features
• NPT solid hex brass adapter or solder end connection
for easy installation
15M2
• Approved for installation with no access panel 15M2
required S
• May be installed in new or existing plumbing systems with
a standard pipe tee vertically, horizontally or at any angle
• PDI Listed (PDI WH201)
• Maintenance free – unit piston is the only moving part Pre-charged
• Air pre-load is 60 psi (4.2 bar) Air Chamber
Permanently
• Factory air charged and permanently sealed Sealed from
Water System
Pressure — Temperature
Operating Pressure: Designed to operate on all domestic and B
commercial lines @150psi (10.6 bar) working pressure.
Temperature Range: 33°F to 180°F (0.5°C to 82°C).
Materials
Bodies: Copper tubing
Pistons: Polypropylene
O-Ring: EPDM
Adapter: Brass NPT Brass
Adapter
for Easy
Standards Installation
Listed by IAPMO, ASSE 1010 approved, ANSI A112.261M
approved, PDI WH201 approved and certified.
A
Dimensions — Weight
SIZE (DN) DIMENSIONS WEIGHT (lbs.) (kgs.)
A B
in. mm in. mm
Threaded
⁄"
12 15M2- 11⁄8 28.5 515⁄16 150.9 0.5 0.2
⁄"
34 A
15M2- 13⁄8 34.9 89⁄16 218.0 0.9 0.4
1" B
15M2- 15⁄8 41.3 813⁄16 223.5 1.3 0.6
1" C
15M2- 21⁄8 54.0 915⁄16 252.5 2.0 0.9
1" D
15M2- 21⁄8 54.0 1211⁄16 322.5 2.3 1.1
1" E
15M2- 25⁄8 66.7 115⁄32 283.5 2.7 1.2
Solder F
⁄"
12 15M2- 11⁄8 210.0 81⁄4 28.5 0.44 0.2
⁄"
34 AS
15M2- 11⁄8 254.0 10 28.5 0.54 0.2
1" BS
15M2- 13⁄8 317.5 121⁄2 34.9 0.92 0.4
1" CS
15M2- 21⁄8 280.0 11 54.0 1.63 0.7
1" DS
15M2- 21⁄8 343.0 131⁄2 54.0 1.98 0.9
1" ES
15M2- 21⁄8 406.5 16 54.0 2.32 1.1
FS
5
Sizing and Placement Rule 1 covers multiple fixture branch lines which do not exceed
20 feet length.
Explanation - Fixture unit sizing and selection table is used to
Water select the required PDI unit (water hammer arrestor).
Hammer Arrestor
Riser
Up to 20'
Rule
1
Typical Branch Line
Rule 2 covers multiple fixture branch lines which exceed 20 feet
As shown above, it has been established that the preferred location in length.
for the water hammer arrestor is at the end of the branch line between Explanation - Fixture unit sizing and selection table is used to
the last two fixtures served. select the required PDI unit (water hammer arrestor). The sum of
The location of the water hammer arrestor shown above applies to the fixture unit rating of units X and Y shall be equal to or
branch lines that do not exceed 20 feet in length, from the start of the greater than the demand of the branches.
horizontal branch line to the last fixture supply on this branch line.
When the branch line exceeds the 20 foot length, an additional water
Over 20'
hammer arrestor should be used. This practice is best defined by two Rule
rules which have been established to cover the placement of water 2
hammer arrestors.
A Watts Water Technologies Company USA: No. Andover, MA • Tel. (978) 688-1811 • Fax: (978) 794-1848 • www.watts.com
Canada: Burlington, ONT. • Tel. (905) 332-4090 • Fax: (905) 332-7068 • www.wattscanada.ca
F-WHA 1050 © 2010 Watts
Authorization Certificate
December 1, 2022
Authorized Distributor, Saudi Arabia
This is to confirm that the company, Mechanical & Chemical Supplies Co., Ltd.
(MCC)
Located at:
Is an authorized Distributor of NIBCO INC. product, valves and fittings, for sale in the
Kingdom of Saudi Arabia. Sales and warranty for all NIBCO products are covered
through its authorized distributors.
If you have any questions or concerns regarding this authorization, please do not
hesitate to contact me via phone (574) 295-7962, or e-mail at [email protected]
Sincerely,
Khaled Adham
Senior International Manager
12/04/2022
Authorization Letter
Furthermore, we trust Mechanical & Chemical Supplies Co., with its technical knowledge,
commitment and the means required, will provide you with the solutions attainable for important
projects.
Respectfully yours,
Hamza Alnaser
Senior sales engineer
Watts is a 148-year-old company with presence in the Middle East for more than 25 years. We confirm that Watts Water Technologies, Inc., (Watts)
has many production facilities across the world (Americas, China, Europe, etc.) from which we manufacture and market globally. Watts has been
a high quality supplier of specification products, both domestically and internationally, for several decades. All manufacturing, quality control,
assembly, and related operations are executed in accordance with Watts’s global manufacturing and procurement standards. Our uniquely
functional designs and rigid quality standards continue to set us apart from other manufacturers.
Company Certificates
١٤٤٤/١١/٠٣ ﺦﻳﺭﺎ
٢٣/٠٥/٢٠٢ ﺘﻟﺍ
٣ ﻖﻓﺍ
ﻮﻤﻟﺍﺓﺩﺎﻬﺸﻟﺍ ﺰﻣﺭ
٥٤٦٧٥١٨٨
ﺓﺩﺎﻬﺷ
ﺔﺑﺎ ﺎﻤ
ﺘﻛ ﺎﻛﺮﺘﺸﻣ ﻩﺮﺸﻋ ﻗﺭ ﻦﻴﻳﺩﻮﻌﺴﻟﺍ
ﺔﺛﻼﺛ ﺎﻛﺮﺘﺸﻣ ١٣ ﻦﻴﻛﺮﺘﺸﻤﻟﺍ ﺩﺪﻋ
ﻥﻭﺮﺸﻋ ﻭ ﻪﻌﺑﺭﺃ ٢٤ ﻦﻴﻳﺩﻮﻌﺴﻟﺍ ﺮﻴﻏ
ﺎﻛﺮﺘﺸﻣ ﻥﻮﺛﻼﺛ ﻭ ٣٧ ﻦﻴﻛﺮﺘﺸﻤﻟﺍ ﺩﺪﻋ
ﺔﻌﺒﺳﺔﻴﻋﺎﻤﺘﺟﻹﺍ
ﺔﺴﺳﺆﻤﻟﺍ ﻩﺎﺠﺗ ﺎﻬﺗﺎﻣﺍﺰﺘﺈﻟﺑ ﺖﻓﻭﺃ ﺪﻗ ﻩﻼﻋﺃ ﺓﺭﻮﻛﺬﻤﻟﺍ ﺓﺄﺸﻨﻤﻟﺍ ﻥﺄﺑ
ﻉﻮﻤﺠﻤﻟﺍ
ﺕﺎﻨﻴﻣﺄﺘﻠﻟ ﺔﻣﺎﻌﻟﺍ ﺔﺴﺳﺆﻤﻟﺍ ﺪﻬﺸﺗ ﻲﻫﻭ ،ﺎﻬﺒﻠﻄﺗ ﺔﻬﺟ ﺔﻳﻷ ﺎﻬﻤﻳﺪﻘﺘﻟ ﺎﻬﺤﻨﻣ ﻢﺗ ﻲﺘﻟﺍﻭ ،
ﺓﺩﺎﻬﺸﻟﺍ ﻩﺬﻫ ﺭﺍﺪﺻﺇ ﺦﻳﺭﺎﺗ ﻰﺘﺣ ﺎﻬﻨﻣ ﺔﻣﺪﻘﻤﻟﺍ ﺕﺎﻧﺎﻴﺒﻟﺍ ﻖﻓﻭ
ﻪﻨﻣ ( )١٩/٦ﺓﺩﺎﻤﻟﺍ ﻲﻓ ﺔﻴﻋﺎﻤﺘﺟﻹﺍ ﺕﺎﻨﻴﻣﺄﺘﻟﺍ ﻡﺎﻈﻧ ﺎﻬﻴﻠﻋ ﺺﻧ ﻲﺘﻟﺍ ﺽﺍﺮﻏﻷﺍ ﻊﻴﻤﺠﻟ.
ﻡﺍﺪﺨﺘﺳﺍ ﻖﻳﺮﻃ ﻂﺑﺍﺮﻟﺍ ﺓﺭﺎﻳﺯ ﺮﺒﻋ ﺓﺩﺎﻬﺸﻟﺍ ﺔﻴﺣﻼﺻﻭﺔﺤﺎﻟﺻ
ﻭﺃ ﻦﻋ ﺔﻴﻋﺎﻤﺘﺟﻹﺍ ﺕﺎﻨﻴﻣﺄﺘﻠﻟ ١٤٤٤ﻡﺰﻠﻳ
ﻰﺘﺣ ﻝﻮﻌﻔﻤﻟﺍ. ﻖﻘﺤﺘﻟﺍ ﻦﻣ
/١٢/٠٣ ﺔﺤﺻ ـﻫ
ﻲﺎﻟﺘﻟﺍ ﻑﺮﻌﻤﻟﺍ : ﻊﻗﻮﻤﻟﺍ ﻲﻓ ﻲﻧﻭﺮﺘﻜﻟﻹﺍ
ﻩﺬﻫ ﺔﻣﺎﻌﻟﺍ ﺔﺴﺳﺆﻤﻠﻟ
ﺔﻳﺭﺎﺳ ﺓﺩﺎﻬﺸﻟﺍ
ﺰﻣﺮﻟﺍ ﻩﺎﻧﺩﺃ
www.gosi.gov.sa/vc
ﻑﺬﺤﻟﺍ ﻭﺃ ﺔﻓﺎﺿﻹﺎﺑ ﺀﺍﻮﺳ ﺎﻬﻴﻠﻋ ﺕﻼﻳﺪﻌﺗ ﻱﺃ ﻝﺎﺧﺩﺇ ﻭﺃ ﺎﻫﺪﻴﻠﻘﺗ ﺎﻴﻌﻄﻗ ﺮﻈﺤﻳﻭ ،ﺔﻴﻤﺳﺮﻟﺍ
ﺔﻴﻣﻮﻜﺤﻟﺍ ﺔﻴﻧﻭﺮﺘﻜﻟﻻﺍ ﻖﺋﺎﺛﻮﻟﺍ ﻦﻣ ﺓﺩﺎﻬﺸﻟﺍ ﻩﺬﻫ ﺪﻌﺗ ﺔﻴﻣﺎﻈﻨﻟﺍ ﺔﻘﺣﻼﻤﻠﻟ ﺎﻬﺒﺣﺎﺻ ﺽﺮﻌﺗ ﺎﻤﻛ ،
ﻚﻟﺫ ﻦﻣ ﺀﻲﺷ ﺎﻬﺑﺎﺷ ﺍﺫﺇ ﺔﻴﻏﻻ ﺓﺩﺎﻬﺸﻟﺍ ﺪﻌﺗﻭ ،ﻞﻳﺪﻌﺘﻟﺍ ﻉﺍﻮﻧﺍ ﻦﻣ ﻚﻟﺫ ﺮﻴﻏ ﻭﺃ ﺎﻬﺗﺎﻧﺎﻴﺑ ﻲﻓ ﺮﻴﻴﻐﺘﻟﺍ
ﻭﺃ ﻲﺘﻟﺍ ﺽﺍﺮﻏﻷﺍ ﻲﻓ ﻻﺇ ﺓﺩﺎﻬﺸﻟﺍ ﻝﻭﺍﺪﺗ ﺯﻮﺠﻳﻻﻭ ،ﺕﺎﺑﻮﻘﻋ ﻦﻣ ﺔﻴﻋﺎﻤﺘﺟﻻﺍ ﺕﺎﻨﻴﻣﺄﺘﻟﺍ ﻡﺎﻈﻧ
ﻪﺿﺮﻔﻳﺎﻣ ﻰﻟﺇ ﺔﻓﺎﺿﻹﺎﺑ ﺔﺼﺘﺨﻤﻟﺍ ﺕﺎﻬﺠﻟﺍ ﻡﺎﻣﺃ ﺔﺒﺗﺮﺘﻣ ﻯﺮﺧﺃ ﺭﺎﺛﺁ ﻱﺃ ﻦﻋ ﻪﻟﻭﺆﺴﻣ ﺮﻴﻏ
ﺔﻴﻋﺎﻤﺘﺟﻻﺍ ﺕﺎﻨﻴﻣﺄﺘﻠﻟ ﺔﻣﺎﻌﻟﺍ ﺔﺴﺳﺆﻤﻟﺍﻭ ،ﺔﻴﻋﺎﻤﺘﺟﻻﺍ ﺕﺎﻨﻴﻣﺄﺘﻟﺍ ﻡﺎﻈﻧ ﻡﺎﻜﺣﻷ ﺎﻘﻓﻭ ﺎﻬﻠﺟﻷ
ﺕﺭﺪﺻﺃ
ﺎﻬﻴﻓ ﺓﺩﺭﺍﻮﻟﺍ ﺕﺎﻧﺎﻴﺒﻟﺍ ﻰﻠﻋ ﻢﺘﺗ ﻞﻳﺪﻌﺗ ﻭﺃ ﺮﻳﻭﺰﺗ ﺔﻴﻠﻤﻋ ﻱﺃ ﻦﻋ ﺔﻟﻭﺆﺴﻣ ﺮﻴﻏﻭ ﺓﺩﺎﻬﺸﻟﺍ ﻦﻋ .
ﺮﻴﻐﻟﺍ ﻞﺒﻗ
١٤٤٤/١١/٠٣ ﺦﻳﺭﺎ
٢٣/٠٥/٢٠٢ ﺘﻟﺍ
٣ ﻖﻓﺍ
ﻮﻤﻟﺍﺓﺩﺎﻬﺸﻟﺍ ﺰﻣﺭ
٥٤٦٧٥٢٠٣
ﺓﺩﺎﻬﺷ
ﺔﺑﺎ ﺎﻤ
ﺘﻛ ﻂﻘﻓ ﻗ ﻦﻴﻳﺩﻮﻌﺴﻟﺍ
ﺪﺣﺍﻭ ﻙﺮﺘﺸﻣ ﺭ ﻦﻴﻛﺮﺘﺸﻤﻟﺍ ﺩﺪﻋ
ﻂﻘﻓ ﺪﺣﺍﻭ ١ ﻦﻴﻳﺩﻮﻌﺴﻟﺍ ﺮﻴﻏ
ﻙﺮﺘﺸﻣ ١ ﻦﻴﻛﺮﺘﺸﻤﻟﺍ ﺩﺪﻋ
ﺔﻴﻋﺎﻤﺘﺟﻹﺍ ﻥﺄﺑ
ﻂﻘﻓ ﻦﻴﻨﺛﺍ ﺓﺄﺸﻨﻤﻟﺍ ﺓﺭﻮﻛﺬﻤﻟﺍ
٢ ﻩﻼﻋﺃ ﺪﻗ ﺖﻓﻭﺃ ﺎﻬﺗﺎﻣﺍﺰﺘﺈﻟﺑ ﻩﺎﺠﺗ ﺔﺴﺳﺆﻤﻟﺍ
ﻉﻮﻤﺠﻤﻟﺍ
ﻦﻴﻛﺮﺘﺸﻣ
ﺎﻬﺤﻨﻣ ﻢﺗ ﻲﺘﻟﺍﻭ ، ﺕﺎﻨﻴﻣﺄﺘﻠﻟ ﺔﻣﺎﻌﻟﺍ ﺔﺴﺳﺆﻤﻟﺍ ﺪﻬﺸﺗ ﻲﻫﻭ ،ﺎﻬﺒﻠﻄﺗ ﺔﻬﺟ ﺔﻳﻷ ﺎﻬﻤﻳﺪﻘﺘﻟ
ﺓﺩﺎﻬﺸﻟﺍ ﻩﺬﻫ ﺭﺍﺪﺻﺇ ﺦﻳﺭﺎﺗ ﻰﺘﺣ ﺎﻬﻨﻣ ﺔﻣﺪﻘﻤﻟﺍ ﺕﺎﻧﺎﻴﺒﻟﺍ ﻖﻓﻭ
ﻪﻨﻣ ( )١٩/٦ﺓﺩﺎﻤﻟﺍ ﻲﻓ ﺔﻴﻋﺎﻤﺘﺟﻹﺍ ﺕﺎﻨﻴﻣﺄﺘﻟﺍ ﻡﺎﻈﻧ ﺎﻬﻴﻠﻋ ﺺﻧ ﻲﺘﻟﺍ ﺽﺍﺮﻏﻷﺍ ﻊﻴﻤﺠﻟ.
ﻡﺍﺪﺨﺘﺳﺍ ﻖﻳﺮﻃ ﻂﺑﺍﺮﻟﺍ ﺓﺭﺎﻳﺯ ﺮﺒﻋ ﺓﺩﺎﻬﺸﻟﺍ ﺔﻴﺣﻼﺻﻭﺔﺤﺎﻟﺻ
ﻭﺃ ﻦﻋ ﺔﻴﻋﺎﻤﺘﺟﻹﺍ ﺕﺎﻨﻴﻣﺄﺘﻠﻟ ١٤٤٤ﻡﺰﻠﻳ
ﻰﺘﺣ ﻝﻮﻌﻔﻤﻟﺍ. ﻖﻘﺤﺘﻟﺍ ﻦﻣ
/١٢/٠٣ ﺔﺤﺻ ـﻫ
ﻲﺎﻟﺘﻟﺍ ﻑﺮﻌﻤﻟﺍ : ﻊﻗﻮﻤﻟﺍ ﻲﻓ ﻲﻧﻭﺮﺘﻜﻟﻹﺍ
ﻩﺬﻫ ﺔﻣﺎﻌﻟﺍ ﺔﺴﺳﺆﻤﻠﻟ
ﺔﻳﺭﺎﺳ ﺓﺩﺎﻬﺸﻟﺍ
ﺰﻣﺮﻟﺍ ﻩﺎﻧﺩﺃ
www.gosi.gov.sa/vc
ﻑﺬﺤﻟﺍ ﻭﺃ ﺔﻓﺎﺿﻹﺎﺑ ﺀﺍﻮﺳ ﺎﻬﻴﻠﻋ ﺕﻼﻳﺪﻌﺗ ﻱﺃ ﻝﺎﺧﺩﺇ ﻭﺃ ﺎﻫﺪﻴﻠﻘﺗ ﺎﻴﻌﻄﻗ ﺮﻈﺤﻳﻭ ،ﺔﻴﻤﺳﺮﻟﺍ
ﺔﻴﻣﻮﻜﺤﻟﺍ ﺔﻴﻧﻭﺮﺘﻜﻟﻻﺍ ﻖﺋﺎﺛﻮﻟﺍ ﻦﻣ ﺓﺩﺎﻬﺸﻟﺍ ﻩﺬﻫ ﺪﻌﺗ ﺔﻴﻣﺎﻈﻨﻟﺍ ﺔﻘﺣﻼﻤﻠﻟ ﺎﻬﺒﺣﺎﺻ ﺽﺮﻌﺗ ﺎﻤﻛ ،
ﻚﻟﺫ ﻦﻣ ﺀﻲﺷ ﺎﻬﺑﺎﺷ ﺍﺫﺇ ﺔﻴﻏﻻ ﺓﺩﺎﻬﺸﻟﺍ ﺪﻌﺗﻭ ،ﻞﻳﺪﻌﺘﻟﺍ ﻉﺍﻮﻧﺍ ﻦﻣ ﻚﻟﺫ ﺮﻴﻏ ﻭﺃ ﺎﻬﺗﺎﻧﺎﻴﺑ ﻲﻓ ﺮﻴﻴﻐﺘﻟﺍ
ﻭﺃ ﻲﺘﻟﺍ ﺽﺍﺮﻏﻷﺍ ﻲﻓ ﻻﺇ ﺓﺩﺎﻬﺸﻟﺍ ﻝﻭﺍﺪﺗ ﺯﻮﺠﻳﻻﻭ ،ﺕﺎﺑﻮﻘﻋ ﻦﻣ ﺔﻴﻋﺎﻤﺘﺟﻻﺍ ﺕﺎﻨﻴﻣﺄﺘﻟﺍ ﻡﺎﻈﻧ
ﻪﺿﺮﻔﻳﺎﻣ ﻰﻟﺇ ﺔﻓﺎﺿﻹﺎﺑ ﺔﺼﺘﺨﻤﻟﺍ ﺕﺎﻬﺠﻟﺍ ﻡﺎﻣﺃ ﺔﺒﺗﺮﺘﻣ ﻯﺮﺧﺃ ﺭﺎﺛﺁ ﻱﺃ ﻦﻋ ﻪﻟﻭﺆﺴﻣ ﺮﻴﻏ
ﺔﻴﻋﺎﻤﺘﺟﻻﺍ ﺕﺎﻨﻴﻣﺄﺘﻠﻟ ﺔﻣﺎﻌﻟﺍ ﺔﺴﺳﺆﻤﻟﺍﻭ ،ﺔﻴﻋﺎﻤﺘﺟﻻﺍ ﺕﺎﻨﻴﻣﺄﺘﻟﺍ ﻡﺎﻈﻧ ﻡﺎﻜﺣﻷ ﺎﻘﻓﻭ ﺎﻬﻠﺟﻷ
ﺕﺭﺪﺻﺃ
ﺎﻬﻴﻓ ﺓﺩﺭﺍﻮﻟﺍ ﺕﺎﻧﺎﻴﺒﻟﺍ ﻰﻠﻋ ﻢﺘﺗ ﻞﻳﺪﻌﺗ ﻭﺃ ﺮﻳﻭﺰﺗ ﺔﻴﻠﻤﻋ ﻱﺃ ﻦﻋ ﺔﻟﻭﺆﺴﻣ ﺮﻴﻏﻭ ﺓﺩﺎﻬﺸﻟﺍ ﻦﻋ .
ﺮﻴﻐﻟﺍ ﻞﺒﻗ
1020088485
: ١٠٢٠٠٨٨٤٨٥ة د ﺎ ﻬ ﺸ ﻟ ا
ﻢ ﻗ ر ـ ﻫ : ١٤٤٤/٠٧/٢٨
ﺦﻳرﺎﺘﻟا
: ٣٠٠١٣٧١٥٩٧ﺰﻴﻤﻤﻟا
ﻢﻗﺮﻟا
ةدﺎﻬ
ﺷ
CERTIFICAT
E
ت ﺎ ﻳ و ﺎ ﻤ ﻴ ﻜ ﻟ ا و ﺔ ﻴ ﻜ ﻴ ﻧ ﺎ ﻜ ﻴ ﻤ ﻟ ا تاﺪﻳرﻮﺘﻟا ﺔ ﻛ ﺮ ﺷ /ﻒ ﻠ ﻜ ﻤ ﻟ ا ن ﺄﺑ ﻞ ﺧ ﺪ ﻟ ا و ة ﺎ ﻛ ﺰ ﻠ ﻟ ﺔ ﻣ ﺎ ﻌ ﻟ ا
ﺔﺌﻴﻬﻟا ﺪ ﻬ ﺸ ﺗ
ﺔ ﻛ ﺮ ﺷ م ٢٠٢٢/١٢/٣١ﻲ ﻓ ﻪ ﻴ ﻬ ﺘ ﻨ ﻤ ﻟ ا ة ﺮ ﺘ ﻔ ﻟ ا
ﻦ ﻋ هراﺮﻗإ م ﺪ ﻗ
ﻪ ﺗ ﺎ ﻘ ﺤ ﺘ ﺴ ﻣ فﺮﺻ ﻚ ﻟ ذ ﻲ ﻓ ﺎ ﻤ ﺑ ﻪ ﺗ ﻼ ﻣ ﺎ ﻌ ﻣ ﻊ ﻴ ﻤ ﺟ ء ﺎ ﻬ ﻧ إ ﻦ ﻣ ﻪ ﻨ ﻴ ﻜ ﻤ ﺘ ﻟ ه د ﺎ ﻬ ﺸ ﻟ ا ه ﺬ ﻫ
ﺢﻨﻣ ﺪﻗو
دﻮﻘﻌﻟا ﻦ ﻋ ﺔﻴﺋﺎﻬﻨﻟا.
ﻦ ﻣ ن و ﺮ ﺸ ﻌ ﻟ ا و يدﺎﺤﻟا)
ﻖ ﻓ ﺮ ﻤ ﻟ ا جذﻮﻤﻨ ﻟا ﻲ ﻓ ( ) ١
عوﺮﻔﻟا
1020088485
: ١٠٢٠٠٨٨٤٨٥ة د ﺎ ﻬ ﺸ ﻟ ا
ﻢ ﻗ ر ـ ﻫ : ١٤٤٤/٠٧/٢٨
ﺦﻳرﺎﺘﻟا
: ٣٠٠١٣٧١٥٩٧ﺰﻴﻤﻤﻟا
ﻢﻗﺮﻟا
٢ ١١٦.٠ تﺎﻳوﺎﻤﻴﻜﻟاو ﺔﻴﻜﻴﻧﺎﻜﻴﻤﻟا تاﺪﻳرﻮﺘﻟا هﺎﻴﻤﻟا ﺞﻳرﺎﻬﺻو تﺎﻧﺎﺨﺳو ﺎﻬ ﺗاﺪﻳﺪﻤﺗو ﺔﻴﺤﺼﻟا تاودﻸﻟ ﺔﻠﻤﺠﺎﻟ ﺑ ﻊﻴﺒﻟا-
ﺔﻛﺮﺷ 466340
ﺔﻳﺪﻠﺒﻟا ﺔﺼﺧر ءﺎﻬﺘﻧا ﺔﻳﺪﻠﺒﻟا ﺔﺼﺧر ﺔﻳﺪﻠﺒﻟا ﺔﺼﺧر يرﺎﺠﺘﻟا ﻞﺠﺴﻟ ا ﻲ ﻧ ﺪﻤﻟ ا ﻞﺠﺴﻟ ا ﻚﺎﻟ ﻤﻟا /ﺮﺟﺄﺘﺴﻤﻟا ﻢ ﺳ ا
ﺦﻳرﺎﺗ ﺦﻳرﺎﺗ ﻢﻗر ﻢﻗر ﻢﻗر
ـﻫ ١٢-٠٣-١٤٤٥ ـﻫ ١٢-٠٣-١٤٤٣ ٤٣٠٣٧٥٧٦٠٣٤ ٢٠٥١٠١٦٩١٩ ٧٠١٤٢٠٢٣٧٣ تﺎﻳوﺎﻤﻴﻜﻟاو ﻪﻴﻜﻴﻧﺎﻜﻴﻤﻟا تاﺪﻳرﻮﺘﻟا
ﻪﻛﺮﺷ
ﻪ ﻌ ﻄ ﻘ ﻟ ا ﻢﻗر عرﺎﺸﻟا ﻲﺤﻟا ﺔ ﻈ ﻓ ﺎ ﺤ ﻤﻟ ا /ﺔﻨﻳﺪﻤﻟا ﺔﻘﻄﻨﻤﻟا
ﻦﻴﻣﺄﺘﻟا ﺔﺼﻴﻟﻮﺑ ﻦﻴﻣﺄﺘﻟا ﺔﻛﺮﺷ ﺪﻋﺎﺼﻤﻟا ﺔﻧﺎﻴﺼﺑ ﺔﻤﺋﺎ ﻘﻟ ا ﻪﻬﺠﻟا ﺔ ﻣ ﻼ ﺴ ﻟ ا ﺔﻤﻈ ﻧ ا ﺔﻧﺎﻴﺼﺑ ﺔﻤﺋﺎ ﻘﻟ ا
ﻢﻗر ﻢﺳا ﻢﺳا ﻪﻬﺠﻟا ﻢ ﺳ ا
about:blank 1/1