* Outline of the
1.Presentation
Background of the Company
2. Overview of the project
3. Overall internship of Experience
4. The Overall Benefit from the internship
5. Conclusion and
6. Recommendation
* 1. Background of the Company
H-Frame
* Column
Side
Formw
ork
* Slab
A flat, horizontal, and typically reinforced concrete element
used to form floors and roofs.
Supervision work
Steps of construction • Proper of formwork
•
• Scaffolding prepared
•
Bar arrangement with proper dimension
Check the no., length & diameter of bar.
• Set the plywood • Check the availability enough
manpower & machineries.
• Provide the reinforcement • The appropriate use of vibrator
• Sanitary & Electrical • Check the mix ratio and take the
sample test.
installation done
• The time frame for the removal
• Concrete casting, curing formwork
& Removal of plywood • Curing of water
* Staircase
A staircases a consists of a number of steps arranged in a series, with
landing at appropriate location, for the purpose of giving access to
different floors of a building. The staircase was on our site was open
newel half turn stair.
Component of the staircases
• Tread: is a horizontal member of tread.
• Riser: is a vertical portion of a stair.
• Going: is a horizontal distance b/n the front edges of two consecutive
steps.
• Soffit: it is under side of the stair.
• Landing: is a platform b/n two flights.
• Flight: a continuous set of steps b/n floor or landing. Top
Bar
Botto
m Bar Side
formwork
* Shear wall
Are vertical elements of the horizontal force resisting system. Shear
wall is used for structural which are exposed to heavy load and some
environmental load like seismic load and wind load.
In our site shear wall uses for this purpose
• To support lift houses.
• To resist lateral load
• Act as partition wall
• Prevent excessive side-way.
In shear wall construction.
we happened to observe the following major works.
Reinforcement work
Formwork preparation
Concrete casting
* Concrete
Is a composite material made from a mixture of water, cement, and
aggregates that hardens into a strong, solid substance:
Vibration of Concrete
In this process, efforts are only directed to reduce the voids in the
compacted concrete. In our site we vibrate by vibration machine
Curing.
is the process of maintaining the moisture and temperature of
concrete to allow it to strengthen and reach its maximum durability.
The purpose of curing
To reduce the heat loss of concrete that is freshly placed to the
atmosphere and reduce the temperature gradient across the cross-
section of the concrete.
* Test on site
Compressive Strength Test:- this kind of test is used for
the exact measuring the compressive strength of concrete our
construction used for measurement of Cubic test
Here cubic mold is prepared in size of 15*15*15cm steel mold.
After preparing the concrete in the mold it stays in the mold for
24hours and then in to the water.
At 7 days: two-third of final strength of concrete.
At 28 days: total final strength of concrete
Cubic Test
Spacer/Concrete Cover
These are small blocks made of sand cement and small aggregate which are
used to provide enough space between reinforcement bar and concrete to
protect bar from rust.
Spacers are used to maintain uniform thickness of clear cover.
They are pre-casted in the site in required dimension.
* Concrete Casting
Vibrato
r
Reinforcement Bar
Reinforcement work is the preparation and placement of
reinforcement steel bars for different structures like
beam, column, slab, shear wall, stair case and etc. this
reinforcement bar are mainly used as main
reinforcement and as stirrup or at site called as
“Staffa”.
Reinforcement Bar
Stirrup: the stirrup having a site name called “Staffa”. In our site we use the stirrup used Ø8,for
beam, column, shear wall and etc.
Function of stirrups
• To resist shear force
• To resist the vibration, Earthquake force.
• Use for punching shear
• To tie longitudinal bars in position.
Bending wire; is used for the purpose of tying application in the field of construction. Binding wire
is made of mild steel. We use binding wire in our site1.5mm for tying rebar.
Practical Skills
Upgrading Theoretical Skill
Communication Skill
Team Working Skill
Leadership Skills
Entrepreneurship Skills
* Conclusion
The internship program creates good opportunities for us to
understand the real life of our field before we graduate and it
also helps to create good linkage between universities and
industries, construction and business sector.
Generally the internship period was an amazing experience for
practicing and seeing real life and situations on the construction
industries.
* Recommendation
Recommendation to the company
we want to recommend some points for the company.
Health and safety environment is not entirely guaranteed on site so
we recommend that the company should provide the safety
materials.
There is the shortage of manpower so should addition the
manpower.
Minor quality defects have been shown during monolithic
concrete casting, so very care attention in the supervision.
Provide the delivery of construction material
Recommendation to the MWU
We also genuinely list some actions that we need our institute to work
on;
The payment should be money-value considering or inflation
adjusted.