CRASHING

Uploaded by

Avinash garg
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
17 views

CRASHING

Uploaded by

Avinash garg
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
You are on page 1/ 18

Gantt Chart and

CRASHING
Revision
• Total Normal Cost = Direct Cost + Indirect Cost
• Direct Cost= Sum of normal Costs of all activities
• Indirect Cost = No. of days X Cost per day.
• Crash Slope = Crash Cost-Normal Cost = Cc-Nc
Normal Time - Crash Time Nt-Ct
Path In Network
Critical Path :1-2—5 1-2-5 = 18 Days
Normal Project Completion Time = 18 days 1-2-4-5 = 13 days
1-3-4-5 = 12 days
Total Normal Cost = Direct Cost + Indirect Cost

= 580 + (70 x 18) Direct Cost = Sum of normal Costs of all activities
= 1840 = 100 + 150 + 50 + 100 + 100 + 80 = 580
Indirect Cost = No. of days X Cost per day.
= 18 x 70 = 1260
Maximum
Activity Normal Time Crash Time Normal Cost Crash Cost Cost
Activity Crashable Rank
Slope/ day
limit (days)

1 -2 8 6 100 200 200-100/8-6 = 50


1 -2 2 50 4

1 -3 4 2 150 350 350 -150/ 4 -2 = 100


1 -3 2 100 6

2 -4 2 1 50 90
2 -4 1 40 3

2 -5 10 5 100 400
2 -5 5 60 5

3 -4 5 1 100 200
3 -4 4 25 2

4- 5 3 1 80 100 4- 5 2 10 1
Paths Cost
Maximum Activity
Cost 1 -2 -5 1-2-4-5 1-3-4-5 Direct Indirect Total
Activity Crashable Rank
Slope/ day
limit (days) Before Crashing 18 13 12 580 1260 1840
1st crashing
18 -1 = 17 13-1 =12 12 580 + (50x1) = 630 17 x 70 = 1190 1820
1-2 by 1 day
1 -2 2 50 4 2nd crashing
17 -1 = 16 12-1=11 12 630 + (50x1) = 680 16 x 70 = 1120 1800
1-2 by 1 day
1 -3 2 100 6 3rd crashing
16 -1 = 15 11 12 680 + (60x1) = 740 15 x 70 = 1050 1790
2-5 by 1 day
2 -4 1 40 3 3rd crashing
16 -1 = 15 11 12 680 + (60x1) = 740 15 x 70 = 1050 1790
2-5 by 1 day
5th crashing
2 -5 5 60 5 14-1 = 13 11 12 800 + (60x1) = 860 13 x 70 = 910 1770
2-5 by 1 day
6th crashing
3 -4 4 25 2 13 -1 = 12 11 12 860 + (60x1) = 920 12 x 70 = 840 1760
2-5 by 1 day
7th crashing
920 + (60x1) +
4- 5 2 10 1 2-5 by 1 day 12 -1 = 11 11- 1 =10 12- 1 = 11 11 x 70 = 770 1760
(10 x 1) = 970
and 4-5 by 1
Path In Network
Critical Path A – D – G A- F = 11
Normal Project Completion Time = 13 days A –D –G = 13
B–G = 10
C –E – G =8
Normal Project Cost = Direct Cost + Indirect Cost
= 713 + 400
= 1113
Maximum
Normal Crash Normal Crash Cost Slope/
Activity Activity Crashable Rank
Time Time Cost Cost day
limit (days)

A 4 3 60 90 A 1 30 2
B 6 4 150 250 B 2 50 3
C 2 1 38 60 C 1 22 1
D 5 3 150 250 D 2 50 3
E 2 2 100 100 E 0 0 0
F 7 5 115 175 F 2 30 2
G 4 2 100 240 G 2 70 4
Paths Cost
Activity
A-F A-D-G B-G C-E-G Direct Indirect Total
Before Crashing 11 13 10 8 713 400 1113
1st crashing
11-1 =10 13-1 =12 10 8 713 + (30x1) =773 250 993
A by 1 day
2nd crashing
10 12-1 =11 10 8 743 + (50x1) =793 175 968
D by 1 day
3rd crashing
10 11-1 =10 10 8 793 + (50x1) = 843 100 943
D by 1 day
4th crashing
10-1 = 9 10-1 = 9 10-1 = 9 8 -1 =7 843 + (70x1)+(30x1)=943 75 1018
G by 1 day
5th crashing
G by 1 day and 9 -1 = 8 9 -1 = 8 9 -1 = 8 7-1 = 6 943 + (70x1)+(30x1)=1043 50 1093
F by 1 day