Refractory failure and Analysis
Refractory failure and Analysis
impacts
Umesh Hosur
CEM-Asia
03 June 2020
Monthly Operational Performance Report - Month 2018 For Internal use only © LafargeHolcim 2018
De-Brief about 29th April session on Refractories
Monthly Operational Performance Report - Month 2018 For Internal use only © LafargeHolcim 2018
Content
● Introduction
● Refractory Precautions- while resuming operation after Covid19
lockdown
● Brief introduction on Refractories & Costs
● Refractory related Preventive measures to avoid unexpected kiln
stops
Monthly Operational Performance Report - Month 2018 For Internal use only © LafargeHolcim 2018
When refractory fails?
Monthly Operational Performance Report - Month 2018 For Internal use only © LafargeHolcim 2018
A variety of wear mechanisms limits the service life of
refractory linings
Ref.: RHI
Monthly Operational Performance Report - Month 2018 For Internal use only © LafargeHolcim 2018
Refractory wear mechanisms predominate…
~20%
thermal
mechanical chemical
~20% ~60%
Ref.: RHI
Monthly Operational Performance Report - Month 2018 For Internal use only © LafargeHolcim 2018
Predominant Wear Mechanisms in Rotary Kilns
Monthly Operational Performance Report - Month 2018 For Internal use only © LafargeHolcim 2018
Static areas Refractory wear impact
Low
Medium
High
Monthly Operational Performance Report - Month 2018 For Internal use only © LafargeHolcim 2018
Factors influencing the Kiln Refractory performance
Monthly Operational Performance Report - Month 2018 For Internal use only © LafargeHolcim 2018
Wear Mechanism
Monthly Operational Performance Report - Month 2018 For Internal use only © LafargeHolcim 2018
Process / Chemical attack
Monthly Operational Performance Report - Month 2018 For Internal use only © LafargeHolcim 2018
Wear Relevant Elements
Monthly Operational Performance Report - Month 2018 For Internal use only © LafargeHolcim 2018
Enrichment of Volatile Elements
Monthly Operational Performance Report - Month 2018 For Internal use only © LafargeHolcim 2018
Wear Relevant Element of Alternative Fuels
Monthly Operational Performance Report - Month 2018 For Internal use only © LafargeHolcim 2018
Kiln Cycles
Monthly Operational Performance Report - Month 2018 For Internal use only © LafargeHolcim 2018
Consequence of Alkali Salt Infiltration
Monthly Operational Performance Report - Month 2018 For Internal use only © LafargeHolcim 2018
Wear Process: Alkaline Salt Infiltration
Monthly Operational Performance Report - Month 2018 For Internal use only © LafargeHolcim 2018
Alkali Salt Infiltration
Monthly Operational Performance Report - Month 2018 For Internal use only © LafargeHolcim 2018
Corrosion of Brick Bonding
Monthly Operational Performance Report - Month 2018 For Internal use only © LafargeHolcim 2018
Corrosion of Calcium-Silicatic Brick Bonding
Monthly Operational Performance Report - Month 2018 For Internal use only © LafargeHolcim 2018
ASR > 1: Alkali Attack on Alumina Bricks
Monthly Operational Performance Report - Month 2018 For Internal use only © LafargeHolcim 2018
ASR > 1: Alkali Attack on Alumina Bricks
Monthly Operational Performance Report - Month 2018 For Internal use only © LafargeHolcim 2018
Examples of Alkali Spalling
Monthly Operational Performance Report - Month 2018 For Internal use only © LafargeHolcim 2018
GL-2, AM: PH cyclone
Alkali Attack: Failure of Steel Shell due to body cracking issue
Expansion of Alumina Refractory before using petcoke
Monthly Operational Performance Report - Month 2018 For Internal use only © LafargeHolcim 2018
Shell Temperature Guidelines for static areas
Monthly Operational Performance Report - Month 2018 For Internal use only © LafargeHolcim 2018
Thermal Load
Monthly Operational Performance Report - Month 2018 For Internal use only © LafargeHolcim 2018
BG and BT-2 Kiln Burning
zone : Ongoing issue
Clinker Melt Infiltration
Monthly Operational Performance Report - Month 2018 For Internal use only © LafargeHolcim 2018
DL Kiln LTZ: Ongoing
issue
Wear Process: Clinker Melt infiltration
Monthly Operational Performance Report - Month 2018 For Internal use only © LafargeHolcim 2018
Overheating of High Alumina Bricks in the Outlet Zone
Monthly Operational Performance Report - Month 2018 For Internal use only © LafargeHolcim 2018
PCPF Ceramic Kiln outlet Tip casting
1. Madukkarai
2. Kymore-2
3. Rabriyawas
4. La- Union
5. Lugait
Monthly Operational Performance Report - Month 2018 For Internal use only © LafargeHolcim 2018
Overheating of SiC Mullite Bricks in the Safety Zone
Monthly Operational Performance Report - Month 2018 For Internal use only © LafargeHolcim 2018
Wear Process: Effect of Frequent Thermal Shocks
Monthly Operational Performance Report - Month 2018 For Internal use only © LafargeHolcim 2018
Thermal Shocks
Monthly Operational Performance Report - Month 2018 For Internal use only © LafargeHolcim 2018
Too Fast Heat Up
Overstress at
Hot face
Monthly Operational Performance Report - Month 2018 For Internal use only © LafargeHolcim 2018
Combination of Wear Mechanisms (CBZ after 5 months)
Monthly Operational Performance Report - Month 2018 For Internal use only © LafargeHolcim 2018
Mechanical Load
Monthly Operational Performance Report - Month 2018 For Internal use only © LafargeHolcim 2018
Wadi-2 Kiln calcination
zone: Ongoing issue
Reasons for Mechanical Load
Monthly Operational Performance Report - Month 2018 For Internal use only © LafargeHolcim 2018
RB Kiln UTZ: Ongoing
issue
Kiln Shell Deformations (Permanent Due to Host Spot)
Monthly Operational Performance Report - Month 2018 For Internal use only © LafargeHolcim 2018
Kiln Shell Deformations: Reversible Deformation Due to too high
clearance
Monthly Operational Performance Report - Month 2018 For Internal use only © LafargeHolcim 2018
Kiln Shell Deformations: Kiln shell Constriction Due to too low
clearance
Monthly Operational Performance Report - Month 2018 For Internal use only © LafargeHolcim 2018
Reasons for Mechanical Load
Monthly Operational Performance Report - Month 2018 For Internal use only © LafargeHolcim 2018
Recommended Tyre Creep and Ovality
Monthly Operational Performance Report - Month 2018 For Internal use only © LafargeHolcim 2018
Possible Consequences
Monthly Operational Performance Report - Month 2018 For Internal use only © LafargeHolcim 2018
Influence of Tyre Ovality
Monthly Operational Performance Report - Month 2018 For Internal use only © LafargeHolcim 2018
Reasons for Mechanical Load: Wrong Installation
Monthly Operational Performance Report - Month 2018 For Internal use only © LafargeHolcim 2018
Signs of Mechanical Overload
Monthly Operational Performance Report - Month 2018 For Internal use only © LafargeHolcim 2018
Maximum Shelf Life
Monthly Operational Performance Report - Month 2018 For Internal use only © LafargeHolcim 2018
Hydration of Magnesia Bricks
Monthly Operational Performance Report - Month 2018 For Internal use only © LafargeHolcim 2018
Hydration of Magnesia Bricks
Monthly Operational Performance Report - Month 2018 For Internal use only © LafargeHolcim 2018
Hydration
Monthly Operational Performance Report - Month 2018 For Internal use only © LafargeHolcim 2018
How to Check for Hydration
Monthly Operational Performance Report - Month 2018 For Internal use only © LafargeHolcim 2018
Lab Test: Differential Thermogravimetry (DTG)
Monthly Operational Performance Report - Month 2018 For Internal use only © LafargeHolcim 2018
Wet Bricks
Monthly Operational Performance Report - Month 2018 For Internal use only © LafargeHolcim 2018
Wet Lining Sections
Monthly Operational Performance Report - Month 2018 For Internal use only © LafargeHolcim 2018
Measures to Avoid Hydration
Monthly Operational Performance Report - Month 2018 For Internal use only © LafargeHolcim 2018
Kiln refractory lining activity register during shutdown
Date: Shift:
1 2 3 4 5
Names Key Mesons:
Names of other 1 2 3 4 5 6 7 8 9
mesons:
Center line marked: Radial lined marked @ 2m interval: Axial lines marked @ 2m interval:
Shift Remarks:
56
Monthly Operational Performance Report - Month 2018 For Internal use only © LafargeHolcim 2018
2019 Kiln refractory performance at a glance (ACC)
Monthly Operational Performance Report - Month 2018 For Internal use only © LafargeHolcim 2018
2019 Kiln refractory performance at a glance (ACL)
Surma- Bangladesh: Entire kiln refractory bricks performed 12 month against earlier life
9-10 months.
Monthly Operational Performance Report - Month 2018 For Internal use only © LafargeHolcim 2018
ACC – Plants Refractory materials performance
(3 yrs Rolling – 2017 to 2019)
1200
1000
600
0
W2 W1 MK LK KY JP G2 G1 BG GG JL-4
Monthly Operational Performance Report - Month 2018 For Internal use only © LafargeHolcim 2018
ACL – Plants Refractory materials performance (3 yrs
Rolling 2017 to 2019)
Monthly Operational Performance Report - Month 2018 For Internal use only © LafargeHolcim 2018
Kiln refractory performance expectation in 2020
Kiln refractory may not performance to full of its potential due to following
reasons
● In some kilns, we may extend the life of the kiln bricks beyond 12 months
● There will be unforeseen kiln stops
● There will be more no. of kiln stops other than refractory related which may
influence negative impact on kiln refractory
● Operating kilns with low PRI due to lack of market demand may have impact
on kiln refractories performance.
Preparatory actions:
Plant to keep sufficient stock on kiln bricks (~5m each Basic and
Alumina bricks), castables (~ 5-10 MT of LC Castable and 5-10MT of
Conventional castable) to handle the kiln stops due to refractory
failures.
LK, W2,
Burner pipe refractory replacement 1 27 13359 W2 4 82 15870
GL2, MK
MK,
Kiln tip casting refractory replacement 2 258 31000 1 187 31000 JP
KY2
Cooler Bull nose / arch and Other areas
2 149 18693 BG, KY 1 22 4486 GL2
refractory replacement
62
Monthly Operational Performance Report - Month 2018 For Internal use only © LafargeHolcim 2018
ACL- Kilns Refractory failures in 2019
2018 Refractory performance 2019 Refractory performance
Refractory Incidents Freq, Hours Clk lost, Freq, Hours Clk lost,
Plants Plants
nos. Lost MT nos. Lost MT
Kiln Refractory replacement due to Process,
poor installation, bricks quality & A1(2),
BT-1, RB,
Mechanical reasons (RCFA done, Actions 6 806 206707 11 1228 399764 RB(5), DL,
RU
defined, actions implemeted and yet to be BT-2 (3)
implemented)
A1, RB,
Burner pipe refractory replacement 0 0 0 3 141 39435
MT
Monthly Operational Performance Report - Month 2018 For Internal use only © LafargeHolcim 2018
63
ACC & ACL Year-wise Refractory Consumption pattern
ACC ACL
Particulars UoM
2016 2017 2018 2019 2016 2017 2018 2019
Purchase Lacs INR 3893 4394 3745 4179 2525 4405 4706 3815
Clk Produced Lacs MT Clk 150 187 187 176 143 155 157 153
Total Ref. Consumed MT 9772 8549 10029 10076 8492 6538 8363 8837
Total Sp. Ref Consumed gm/MT Clk 654 456 535 573 594 421 533 577
Sp. Spend INR/MT Clk 26.0 25.3 21.6 24.9 17.6 28.4 30.0 24.9
INR/MT Clk 23 25
Avg. Sp. Spend
CHF/MT Clk 0.31 0.34
64
Monthly Operational Performance Report - Month 2018 For Internal use only © LafargeHolcim 2018
ACC & ACL Year-wise Refractory Consumption pattern
65
Monthly Operational Performance Report - Month 2018 For Internal use only © LafargeHolcim 2018
Summary
● Refractory wear
● Today, mainly the chemical load destroys our refractory linings
Monthly Operational Performance Report - Month 2018 For Internal use only © LafargeHolcim 2018