equipment i.e. Closing and tripping of switch gear and tap changing of transformer in power plants y DATA ACQUISITION- to collect the information from the field by some means.
Indutrial process
Facility process
remote station are controlled & supervised from one central control centre.
RTU 01
Control centre
RTU 02
RTU 03
RTU 04
Component description
y A Human Machine Interface or HMI is the
apparatus which presents process data to a human operator , and through this, the human operator moniter and controls the process. y Remotes Terminal Units(RTUs) connecting to sensors in the process, converting sensor signals to digital data and sending digital data to the supervisory system.
field devices because thet are more economical,versitial , flexible,and configurable than special purpose RTUs.
y Communication infrastucture connecting
Role Of Alarm
y Alarms have a very critical role in automation. Generally we have alarm states for each inputs/outputs. y Every plant need proper monitoring and control of the process parameters. y Alarms represent warnings of process conditions that could cause problems, and require an operator response . y Generally alarms are implemented by using the lamps or hooters in field but in SCADA it can be represented using automation.
Role of security
Y0u can allocate certain facilities or features to the operator , process people, engineering dept. & maintenance dept. The security can be given for individual as well as for groups.
chemical plants , electricity generation , electric power transmision , electricity distribution , district heating.
y Control mechanism are described process
control.
Advantages :
y Cheaper y Continuous Operation y Reliable y Improves maintenance , operation ,
customer service y Few operators control large no. Of individual assets y Provide rapid response to emergencies
Disadvantages :
y Lack of trained persons y Initial capital investment
integrate all the state power utilities into a national network by 2012 A.D.and as a part of this a unified load dispatch centre is being proposed for the southern states with their regional centers at Bangalore.