PROJECT PROPOSAL

Building an information system for


National Polly company
INTRODUCTION
• National Polly company wants to build a network system that has 30
desktop printers 3 which are distributed in 10 offices localized in 3 buildings.
• The company wants to enhance their operations efficiently and effectively through the
resources .
PROJECT OVERVIEW.
• Computer network is an interconnection of or more computer in order to share file and
resource like printer, hard drive ……….
• This project is proposed to install and configure information network system for
National Polly company
• This project has 5 phases
PROJECT OBJECTIVE-BACKGROUND
THIS PROJECT IS PROPOSED IN ORDER
• To be able to share resources
• To manage and control network resources
• To simplify information distribution
• To connect staff members in different offices (those are in 3 buildings )

• To provide secure connections for the company ( National Polly company )


PROJECT DESCRIPTION
• To implement this project must follow the following 5 phases.
• Build network design
• Identify the best –fit network topology
• Design star topology
• Implement network configurations
SELECTED PHASE TO PERFORM ACTIVITIES:
IMPLEMENT NETWORK CONFIGURATION
• Activates to perform on this phase:
1. Crimping network cables
2. Installing windows server 2008 R2
3. Installing NIC and other required drivers
4. Installing and configuring AD and DNS
5. Installing and configuring DHCP
6. Assigning the necessary IP addresses and scope
SCHEDULE TO PERFORM THE ACTIVITIES:
Activity Week 1 Week 2 Week3 Remark
Activity 1 x x
Activity 2 x
Activity 3 x
Activity 4 x
Activity 5 x
OFFER CLIENT SUPPORT MECHANISM
• The client support mechanism for this project is proposed to be on
1. Face to face
2. Phone
3. Email
ESTIMATE INTERNET CONNECTION COST

Item Description price


Broadband internet Wired 3G 500/maney
connection
PROPOSED MAINTENANCE POLICIES
1. don’t try to format any pc
2. Don’t try change password
3. Do preventive maintenance by schedule
4. Contact the network technician in case any failure occurs
PROJECT LABOR (HUMAN RESOURCES )
Position Required no Responsibilities
Network Administrator 03 Manage and administrator
the server
System Administrator 1 Manage and control the
whole network system
Network Technician 05 Install, configure and
maintain the network system
PROJECT MATERIAL REQUIREMENT HARDWARE
REQUIREMENT
Item description Unit Quantity
Desktop computer Dell optiplex 7010 Pcs 30
Server Computer Dell o Pcs 1
Switch D –link 24 port Pcs 3
Printer Hp Leaser jet 400 Pcs 3
Network cable CAT 6 Mater 600
Cat 6 cable connector Rj -45 120
Network cable crimper Pcs 03
SOFTWARE REQUIREMENT
Software Description
NOS (network operating system ) Windows server 2008
Network Driver Network driver dell optiplex 710
Presentation software Cisco packet Tracer and ms office 2007
PROJECT BILLING
• Guess material cost :
Item Description Unit Unit price

Desktop computer Dell optiplex 7010 30Pcs 10


Server Computer Dell o 1Pcs 1
Switch D –link 24 port 3Pcs 3
Printer Hp Leaser jet 400 3Pcs 3
Network cable CAT 6 600Mater 600
Cat 6 cable connector Rj -45 200pcs 200
Network cable crimper 10Pcs 10
ESTIMATE PROFESSIONAL COST
Item Description Unit Unit price
Desktop computer Dell optiplex 7010 30 pcs 10,800
Server Computer Dell optiplex 7010 1pcs 8,000
Switch D –link 24 port 3pcs 2,800
Printer Hp Leaser jet 400 3pcs 5,00
Network cable CAT 6 600 mater 6
Cat 6 cable Rj -45 200pcs 3
connector
Network cable 03 pcs 250
crimper
PROJECT DRAWING :IT IS PREPARED USING
CISCO PACKET TRACER